● Proposed Campus Recorded July 21, 2026 · 2 Buildings

Janesville Former GM Site AI Data Center

Street address 1000 Industrial Avenue, Janesville, WI 53546, Rock County verified address Exact, at the address [1] wmtv15news.com

Overview, regulatory gates and specifications

The City of Janesville Common Council reviewed redevelopment proposals for an AI data center campus at the former General Motors assembly site on Industrial Avenue in Janesville, Rock County, Wisconsin. [1] Filings on the record specify 2 planned or operational buildings. [1] Janesville has become a battleground over AI data center development, with community conflict over proposed projects in the city. [1]

Verified Site & Permit Summary
Verified address
1000 Industrial Avenue, Janesville, WI 53546, Rock County verified address
Operator / developer
City of Janesville Redevelopment
Permit / registry ID
hawaiinewsnow.com on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[1] wmtv15news.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
City of Janesville Redevelopment as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: City of Janesville Redevelopment
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Janesville Former GM Site AI Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 2 buildings agency filing [1] wmtv15news.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: proposed (content date)

    Janesville has become a battleground over AI data center development, with community conflict over proposed projects in the city.

    [1] wmtv15news.com

Every event in order

1 correction to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Wisconsin

Verified data center records in Wisconsin within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
EdgeConneX Madison Data Center (EDCMAD01) Madison, Dane County 30 mi Running EdgeConneX 5 MW
US Signal and OneNeck Madison Data Center (WI02) Fitchburg, Dane County 33 mi Running OneNeck IT Solutions 6 MW
Network 222 Carrier Hotel and Data Center (Madison) Madison, Dane County 34 mi Running Fiore Companies 4 MW
SupraNet Communications Madison Data Center Madison, Dane County 39 mi Running SupraNet Communications 3 MW
QTS Dane County Data Center Campus (DeForest Vienna) DeForest, Dane County 43 mi Proposed QTS Data Centers 800 MW
CyberLynk Milwaukee Data Center (MKE1) Franklin, Milwaukee County 54 mi Running Wisconsin CyberLynk Network 2 MW

Blank cell: not disclosed by any source on file.

Common questions about Janesville Former GM Site AI Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Janesville Former GM Site AI Data Center?

City of Janesville Redevelopment is the developer. No construction contractor is named on the record yet.

How much power and water does Janesville Former GM Site AI Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Janesville Former GM Site AI Data Center stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Town of Janesville Planning and Zoning Committee recommends data center moratorium - hawaiinewsnow.com (opens in a new tab), hawaiinewsnow.com, July 28, 2026, news outlet
  2. Janesville, once a symbol of the Great Recession, becomes AI data center battleground - pbs.org (opens in a new tab), pbs.org, July 21, 2026, national outlet

2 sources on file.

Regional grid context

This site is in the MRO East (MROE) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Janesville Former GM Site AI Data Center", https://datacenterrecord.org/projects/janesville-ai-data-center-wi, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Janesville Former GM Site AI Data Center", https://datacenterrecord.org/projects/janesville-ai-data-center-wi. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
42.6625, -89.0185
How the location is known
Location from the site's street address.
Location source
https://www.janesvillewi.gov/
Coordinate source
City of Janesville former GM assembly site parcel
Location last verified
September 16, 2026
Published
September 4, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Janesville Former GM Site AI Data Center · 2 sources, 1 entry · basis and source tier on every row · verified November 6, 2026

Download CSV JSON