Data Center Record.
Census GEOID: 55025 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 reporting source

● Running First recorded October 21, 2026 · 1 Building

EdgeConneX Madison Data Center (EDCMAD01)

Street address 4916 East Broadway, Madison, WI 53716, Dane County verified address Exact, at the address [1] edgeconnex.com

Overview, regulatory gates and specifications

EdgeConneX operates the EDCMAD01 edge colocation data center at 4916 East Broadway in Madison, Dane County, Wisconsin. [1] Filings on the record specify disclosed capacity of 5 MW (the developer's figure), 1 planned or operational building. [1] Verified facility status from Wisconsin state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
5 MW
the developer's figure

Equivalent to ~4,150 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.2% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 4916 East Broadway, Madison, WI 53716.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
5 MW developer figure Equivalent to the continuous electricity demand of about 4,150 average U.S. homes based on U.S. Energy Information Administration residential consumption data. Less than 0.1 percent (0.049 percent) of New York City's summer peak demand in 2024.
[1] edgeconnex.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[1] edgeconnex.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2016 (10 years)
Who leads it
EdgeConneX as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. EdgeConneX Madison Data Center (EDCMAD01), capacity: 5 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 5 ÷ 10,245 = 0.00049 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: EdgeConneX
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for EdgeConneX Madison Data Center (EDCMAD01).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 5 MW 5 MW the developer's figure [1] edgeconnex.com
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [1] edgeconnex.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

January 13, 2026 Madison, WI Madison Common Council One Year Data Center Moratorium Vote Madison Common Council 3 clips

On January 13, 2026, the Madison Common Council voted to enact a one year moratorium pausing land use approvals for new data centers over 10,000 square feet while city staff studies energy, water, and climate plan impacts.

  1. Satya Rhodes Conway, Mayor, City of Madison Elected Official transcribed from local broadcast report
    "Us now with more on what prompted the city's decision to pause the new developments. Mackenzie... The key word you used is ánew. Take a look at this map... Madison already has more than 10 data centers. A planning commission report shows that of those existing facilities, only two would qualify to be blocked by the new moratorium if they were proposed today. This all comes into play as city leaders vote to pump the"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "City leaders vote to pump the brakes data centers are popping up around the country. On tuesday Madison city officials voted to slow that process down. "its just about giving us time to actually come up with definition for data centers in our zoning code which we don't have right now. The moratorium, or pause that was approved, is a zoning code change that expires in a year. It is meant to buy the city more time before any long term decisions are made on more data centers coming to town. "one of the reasons we are"
  3. WMTV | News, Weather & Sports Broadcast Report Broadcast Report transcribed from local broadcast report
    "Centers coming to town. "one of the reasons we are doing the moratorium is so that staff actually has the time to do the research and see how these re being regulated other places." a new study out of the university of virginia says the energy needed just for data centers in wi could triple by the end of the decade, which is causing concern for power engineer jayden trocke. "the bigger thing to question here is the upgrades that need to happen to the grid to get the power where it needs to go and that's reflected on the tax payer- its reflected on me you everyone"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from Wisconsin state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] edgeconnex.com

Nearest data centers in Wisconsin

Verified data center records in Wisconsin within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Network 222 Carrier Hotel and Data Center (Madison) Madison, Dane County 5 mi Running Fiore Companies 4 MW
US Signal and OneNeck Madison Data Center (WI02) Fitchburg, Dane County 9 mi Running OneNeck IT Solutions 6 MW
SupraNet Communications Madison Data Center Madison, Dane County 12 mi Running SupraNet Communications 3 MW
QTS Dane County Data Center Campus (DeForest Vienna) DeForest, Dane County 14 mi Proposed QTS Data Centers 800 MW
Janesville Former GM Site AI Data Center Janesville, Rock County 30 mi Proposed City of Janesville Redevelopment 2 buildings
Meta Beaver Dam Data Center Beaver Dam, Dodge County 39 mi Running Meta 200 MW

Blank cell: not disclosed by any source on file.

Common questions about EdgeConneX Madison Data Center (EDCMAD01)

Answered directly from the verified filings and local actions on this page.

Who is building EdgeConneX Madison Data Center (EDCMAD01)?

EdgeConneX is the developer. No construction contractor is named on the record yet.

How much power and water does EdgeConneX Madison Data Center (EDCMAD01) say it needs?

Power: 5 MW (the developer's figure, edgeconnex.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does EdgeConneX Madison Data Center (EDCMAD01) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. EdgeConneX Madison Data Center (EDCMAD01) Official Disclosure (opens in a new tab), EdgeConneX, news outlet

1 source on file.

Regional grid context

This site is in the MRO East (MROE) regional power market.

Sources and data

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "EdgeConneX Madison Data Center (EDCMAD01)", https://datacenterrecord.org/projects/edgeconnex-madison-edcmad01-wi, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "EdgeConneX Madison Data Center (EDCMAD01)", https://datacenterrecord.org/projects/edgeconnex-madison-edcmad01-wi. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
43.0468, -89.2974
How the location is known
Location from the site's street address.
Location source
https://www.edgeconnex.com/locations/americas/madison-wi/
Coordinate source
EdgeConneX EDCMAD01 specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
5 MW, the developer's figure
Published
October 21, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · EdgeConneX Madison Data Center (EDCMAD01) · 1 source, 1 entry · basis and source tier on every row · verified October 27, 2026

Download CSV JSON