Ashland, Kentucky is considering eminent domain to acquire the AK Steel property for a data center proposal. [1]

1. Land & Parcel
Location tracked
2. Local Zoning
Not yet on file
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings
Not disclosed
Acreage not stated in public filings yet

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Parcel boundaries and municipal zoning tracked.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Not disclosed
Who leads it, Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Not disclosed
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Ashland AK Steel Property Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind it A land record, a zoning application or a company's own announcement.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

June 18, 2026 Ashland, KY Data center company addresses public concerns during Boyd County town hall Boyd County Fiscal Court 2 clips

FOX 56 News report on Boyd County Fiscal Court and community proceedings in Ashland, KY: Data center company addresses public concerns during Boyd County town hall (June 18, 2026).

  1. FOX 56 News Broadcast Report Broadcast Report transcribed from local broadcast report
    "Under through the public service commission and attorney general's office to oversee it. It's an industrial tariffs. We pay all of the upfront costs for transmission. We none of these costs are soon by the rate payers over consumption of local water sources was also a major concern. But air wolf, officials say that also will not be an issue. So to 400,000"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "And you don't need to take any more water for 10 years wolves team also answered questions surrounding noise, pollution, which has been reported at other data center facilities. The decibel levels on these modern data centers much lower than you this is not a bitcoin mining operation which has allowed type of computer that uses. We will. Very open about the decibel levels and they'll be like at the property line."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

2 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Kentucky

Nearest records are not computed for a record placed at a county seat. Browse all data centers in Kentucky.

Common questions about Ashland AK Steel Property Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Ashland AK Steel Property Data Center?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does Ashland AK Steel Property Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Ashland AK Steel Property Data Center stand today?

It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. City of Ashland considering eminent domain for AK Steel property amid data center proposal - WOWK 13 News (opens in a new tab), WOWK 13 News, September 2, 2026, local outlet
  2. $12bn Data Center Campus Proposed by Rubix on Former Steel Site near Ashland, Kentucky (opens in a new tab), constructionreviewonline.com, July 23, 2026, news outlet
  3. KY city may seize land to protect drinking water supply from a data center - Lexington Herald Leader (opens in a new tab), Lexington Herald Leader, September 2, 2026, local outlet

3 sources on file.

Regional grid context

This site is in the SERC Tennessee Valley (SRTV) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Ashland AK Steel Property Data Center", https://datacenterrecord.org/projects/ashland-ak-steel-property-data-center-ky, last verified September 17, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Ashland AK Steel Property Data Center", https://datacenterrecord.org/projects/ashland-ak-steel-property-data-center-ky. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
38.4047, -82.6006
How the location is known
Location is the county seat; exact site not disclosed.
Location source
County seat (Catlettsburg), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location last verified
September 16, 2026
Published
September 5, 2026
Last verified
September 17, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Ashland AK Steel Property Data Center · 3 sources, 0 entries · basis and source tier on every row · verified September 17, 2026

Download CSV JSON