Proposed Built from one source

Google Pine Island Data Center

Google hosted a community event in Pine Island, Minnesota regarding a proposed data center while facing political opposition including a congressional candidate's moratorium demand. It is proposed, as reported February 25, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 5 sources, 1 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Reported by others: 2 GW (YouTube). Their figure, not the record's.
Water
Not disclosed
Who leads it
Google
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Google as stated by the source September 17, 2026
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

How much power it needs, also reported: 2 GW, 2026 (YouTube: Energy capacity is expanding by approximately 2 gigawatts with much or all proposed to be green energy) .

Jobs once it runs, also reported: 290 jobs, 2026 (minnpost.com: Pine Island development agreement's employment requirements could total 290 jobs across nine stages); 100 jobs, 2026 (YouTube: Around 100 permanent jobs will be created by the data center); 9 jobs, 2026 (KTTC: Google promises hundreds of new jobs with a job multiplier ratio of 9 to 1.) .

Tax it would pay each year, also reported: 130,000,000 USD, 2026 (KTTC: Google promises more than $130 million in tax revenue in the first 28 years.) .

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. (source date; the content gives no date of its own)

    Google is expected to announce the project's Panther Program and other initiatives benefiting the Pine Island School District, with a projected investment of $24 million. [3]

  2. (source date; the content gives no date of its own)

    Google promised $3 million directly to Pine Island city. [3]

  3. (source date; the content gives no date of its own)

    Google and Ryan Companies promised an initial capital investment of more than $700 million into Pine Island. [3]

  4. (source date; the content gives no date of its own)

    The project site is located less than half a mile from a nearby residential home [5]

  5. · Status: proposed (source date; the content gives no date of its own)

    The proposed data center will use advanced air cooling and minimal water compared to other data centers [5]

The full Google Pine Island Data Center timeline, in order

15 corrections to this record

Every correction, with its reason
  1. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  2. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  3. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  4. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  5. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: video is tier 5 (the editor, 2026-09-23). The link did not change. The day's label corrections.

  6. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: video is tier 5 (the editor, 2026-09-23). The link did not change. The day's label corrections.

  7. · the summary of a status history row

    The note "(Entry dated by the video's upload date; see the correction.)" appended by the date correction of 2026-09-08 belongs in this log, not in the event sentence; the date basis of the row already says the date is the source's. The sentence is restored to the event only (2026-09-13). The old and new text.

  8. · the summary of a status history row

    The note "(Entry dated by the video's upload date; see the correction.)" appended by the date correction of 2026-09-08 belongs in this log, not in the event sentence; the date basis of the row already says the date is the source's. The sentence is restored to the event only (2026-09-13). The old and new text.

  9. · the date basis of a reference figures row

    Date basis recorded (2026-09-08, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own. The old and new text.

  10. · the date basis of a statements row

    Date basis recorded (2026-09-08, /methodology#dates): Jack Ailey speaks in the video, so the statement is dated by the video's upload date. The old and new text.

  11. · the date basis of a reference figures row

    Date basis recorded (2026-09-08, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own. The old and new text.

  12. · the date basis of a status history row

    Date basis recorded (2026-09-08, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own. The old and new text.

  13. · the date basis of a status history row

    Date basis recorded (2026-09-08, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own. The old and new text.

  14. · the summary of a status history row

    Dated by the video's upload date (KARE 11, 2026-02-25), which is the source date; the content gives no other date. The old and new text.

  15. · the summary of a status history row

    Dated by the video's upload date (KARE 11, 2026-02-25), which is the source date; the content gives no other date. The old and new text.

Every correction on the record is on the corrections page.

What was said

Ellison contends that if Google terminates its 15 year contract early, other utility customers would face greater risk of cost burden.
Keith Ellison, Minnesota Attorney General · October 3, 2026 · paraphrased · MPR News local outlet
Xcel Energy stated that Google has agreed to fund 1,900 megawatts of new clean energy resources including wind, solar and battery storage at no cost to existing customers.
Megan Boldt, Xcel Energy spokesperson · October 3, 2026 · paraphrased · MPR News local outlet

Every statement about data centers in Minnesota, by speaker

7 more statements on this page

Minnesota Attorney General

Attorney General Keith Ellison filed comments with the Minnesota Public Utilities Commission on Thursday (September 2026, exact date unclear) arguing that Google's agreement with Xcel Energy does not protect other ratepayers from cost shifts.

October 3, 2026, MPR News · MPR News local outlet · the record (Paraphrased; said in the source itself)

Keith Ellison, Minnesota Attorney General

Attorney General's office said Xcel claims Google deal will provide more than 1.1 billion dollars in savings for other ratepayers

October 1, 2026, KTTC | Rochester, MN · KTTC | Rochester, MN local outlet · the record (Paraphrased; said in the source itself)

Lindsay Mark Lewis, CEO of Progressive Policy Institute, says Democrats can be pro environment and pro growth with data centers if strong rules are set

September 25, 2026, minnpost.com · minnpost.com local outlet · the record (Paraphrased; said in the source itself)

Jake Johnson, DFL Minnesota First Congressional District candidate, demands a moratorium on data center construction.

August 19, 2026, KTTC · KTTC local outlet · the record (Paraphrased; said in the source itself)

DFL Minnesota First Congressional District candidate

Johnson says data centers should meet four requirements: keeping bills down, protecting farmland and natural resources, ensuring economic gains in Southern Minnesota, and ending non disclosure agreements.

August 19, 2026, KTTC · KTTC local outlet · the record (Paraphrased; said in the source itself)

First District Congressman

Brad Finstad says data center projects should be a community decision, not handed down by Washington.

August 19, 2026, KTTC · KTTC local outlet · the record (Paraphrased; said in the source itself)

Jack Ailey, vice president of data centers for Xcel Energy

Google will pay for the resources it uses so utility customers will be insulated from rate impacts

February 25, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

The site

Where in Goodhue County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 12 other published records in Minnesota
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Pine Island, Goodhue County, Minnesota
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Comparisons

3 metrics with more than one figure

Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.

Capacity at full buildout

1 figure, 1 source
Show each source's words
  • 2 GW, YouTube: Energy capacity is expanding by approximately 2 gigawatts with much or all proposed to be green energy

Permanent jobs

3 figures, 3 sources
100 jobsReported

YouTube, Feb 25, 2026

9 jobsReported

KTTC, Aug 19, 2026

Show each source's words
  • 290 jobs, minnpost.com: Pine Island development agreement's employment requirements could total 290 jobs across nine stages
  • 100 jobs, YouTube: Around 100 permanent jobs will be created by the data center
  • 9 jobs, KTTC: Google promises hundreds of new jobs with a job multiplier ratio of 9 to 1.

Tax each year

1 figure, 1 source
130,000,000 USDReported

KTTC, Aug 19, 2026

Show each source's words
  • 130,000,000 USD, KTTC: Google promises more than $130 million in tax revenue in the first 28 years.

Questions about this project

7 questions answered from the record

Answered from the rows on this page.

How big is Google Pine Island Data Center?

Not disclosed. No source on file gives its capacity, its acreage or a count of buildings. What the record holds instead is under Disclosed.

Who is building Google Pine Island Data Center?

Google is the developer. No construction contractor is named on the record yet.

Who will use Google Pine Island Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Google Pine Island Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

What has Pine Island or Goodhue County decided about it?

No decision by Pine Island or Goodhue County about data centers is on the record. The Goodhue County page and the Minnesota scorecard list every rated row the day a person publishes one.

What is still unknown about Google Pine Island Data Center?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Google: Data center locations, Google, September 14, 2026

Reporting

  1. A tale of two data centers: Google hosts events in to woo residents of Hermantown and Pine Island - MPR News, MPR News, August 20, 2026, local outlet
  2. Congressional candidate demands data center moratorium ahead of Google’s Pine Island celebration - KTTC | Rochester, MN, KTTC | Rochester, MN, August 19, 2026, local outlet
  3. Google launches a charm offensive in 2 Minnesota towns as data center opposition grows - MPR News, MPR News, August 20, 2026, local outlet
  4. Google building data center in Pine Island, Minnesota, YouTube, February 25, 2026, video

5 sources on file.

Cite this record

Data Center Record, "Google Pine Island Data Center", https://datacenterrecord.org/projects/google-pine-island-data-center-mn, last verified September 17, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "Google Pine Island Data Center", https://datacenterrecord.org/projects/google-pine-island-data-center-mn. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
google-pine-island-data-center-mn
Status value
proposed
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/mn/goodhue-county/pine-island
Coordinates
44.56556, -92.53472
Location precision
county
Location source
County seat (Red Wing), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-05
Last verified
2026-09-17