Google hosted a community event in Pine Island, Minnesota regarding a proposed data center while facing political opposition including a congressional candidate's moratorium demand. It is proposed, as reported February 25, 2026.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
Land
Not disclosed
Power it would draw
Not disclosed
Reported by others: 2 GW (YouTube). Their figure, not the record's.
Water
Not disclosed
Who leads it
Google
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)
Impact figures
Field
Value
Who says so
Source
Last verified
How much power it needs
Not disclosed
How much water it would use
Not disclosed
How loud it would be
Not disclosed
Jobs once it runs
Not disclosed
Tax it would pay each year
Not disclosed
The record's fields
Field
Value
Who says so
Source
Last verified
Who is building it
Google
as stated by the source
September 17, 2026
Who is constructing it
Not disclosed
How much land
Not disclosed
Where its power comes from
Not disclosed
Grid connection
Not disclosed
How it is cooled
Not disclosed
How much power it needs, also reported:2 GW, 2026 (YouTube: Energy capacity is expanding by approximately 2 gigawatts with much or all proposed to be green energy)
.
Jobs once it runs, also reported:290 jobs, 2026 (minnpost.com: Pine Island development agreement's employment requirements could total 290 jobs across nine stages); 100 jobs, 2026 (YouTube: Around 100 permanent jobs will be created by the data center); 9 jobs, 2026 (KTTC: Google promises hundreds of new jobs with a job multiplier ratio of 9 to 1.)
.
Tax it would pay each year, also reported:130,000,000 USD, 2026 (KTTC: Google promises more than $130 million in tax revenue in the first 28 years.)
.
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Water useA state water right filing or a water supply agreement.
Who would use itA lease announcement or a tenant named in a filing.
Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.
What happened
(source date; the content gives no date of its own)
Google is expected to announce the project's Panther Program and other initiatives benefiting the Pine Island School District, with a projected investment of $24 million. [3]
(source date; the content gives no date of its own)
Google promised $3 million directly to Pine Island city. [3]
(source date; the content gives no date of its own)
Google and Ryan Companies promised an initial capital investment of more than $700 million into Pine Island. [3]
(source date; the content gives no date of its own)
The project site is located less than half a mile from a nearby residential home [5]
· Status: proposed (source date; the content gives no date of its own)
The proposed data center will use advanced air cooling and minimal water compared to other data centers [5]
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: video is tier 5 (the editor, 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: video is tier 5 (the editor, 2026-09-23). The link did not change. The day's label corrections.
· the summary of a status history row
The note "(Entry dated by the video's upload date; see the correction.)" appended by the date correction of 2026-09-08 belongs in this log, not in the event sentence; the date basis of the row already says the date is the source's. The sentence is restored to the event only (2026-09-13). The old and new text.
· the summary of a status history row
The note "(Entry dated by the video's upload date; see the correction.)" appended by the date correction of 2026-09-08 belongs in this log, not in the event sentence; the date basis of the row already says the date is the source's. The sentence is restored to the event only (2026-09-13). The old and new text.
· the date basis of a reference figures row
Date basis recorded (2026-09-08, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own. The old and new text.
· the date basis of a statements row
Date basis recorded (2026-09-08, /methodology#dates): Jack Ailey speaks in the video, so the statement is dated by the video's upload date. The old and new text.
· the date basis of a reference figures row
Date basis recorded (2026-09-08, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own. The old and new text.
· the date basis of a status history row
Date basis recorded (2026-09-08, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own. The old and new text.
· the date basis of a status history row
Date basis recorded (2026-09-08, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own. The old and new text.
· the summary of a status history row
Dated by the video's upload date (KARE 11, 2026-02-25), which is the source date; the content gives no other date. The old and new text.
· the summary of a status history row
Dated by the video's upload date (KARE 11, 2026-02-25), which is the source date; the content gives no other date. The old and new text.
Ellison contends that if Google terminates its 15 year contract early, other utility customers would face greater risk of cost burden.
Keith Ellison, Minnesota Attorney General · October 3, 2026 · paraphrased · MPR Newslocal outlet
Xcel Energy stated that Google has agreed to fund 1,900 megawatts of new clean energy resources including wind, solar and battery storage at no cost to existing customers.
Megan Boldt, Xcel Energy spokesperson · October 3, 2026 · paraphrased · MPR Newslocal outlet
Attorney General Keith Ellison filed comments with the Minnesota Public Utilities Commission on Thursday (September 2026, exact date unclear) arguing that Google's agreement with Xcel Energy does not protect other ratepayers from cost shifts.
October 3, 2026, MPR News · MPR Newslocal outlet · the record (Paraphrased; said in the source itself)
Keith Ellison, Minnesota Attorney General
Attorney General's office said Xcel claims Google deal will provide more than 1.1 billion dollars in savings for other ratepayers
October 1, 2026, KTTC | Rochester, MN · KTTC | Rochester, MNlocal outlet · the record (Paraphrased; said in the source itself)
Lindsay Mark Lewis, CEO of Progressive Policy Institute, says Democrats can be pro environment and pro growth with data centers if strong rules are set
September 25, 2026, minnpost.com · minnpost.comlocal outlet · the record (Paraphrased; said in the source itself)
Jake Johnson, DFL Minnesota First Congressional District candidate, demands a moratorium on data center construction.
August 19, 2026, KTTC · KTTClocal outlet · the record (Paraphrased; said in the source itself)
DFL Minnesota First Congressional District candidate
Johnson says data centers should meet four requirements: keeping bills down, protecting farmland and natural resources, ensuring economic gains in Southern Minnesota, and ending non disclosure agreements.
August 19, 2026, KTTC · KTTClocal outlet · the record (Paraphrased; said in the source itself)
First District Congressman
Brad Finstad says data center projects should be a community decision, not handed down by Washington.
August 19, 2026, KTTC · KTTClocal outlet · the record (Paraphrased; said in the source itself)
Jack Ailey, vice president of data centers for Xcel Energy
Google will pay for the resources it uses so utility customers will be insulated from rate impacts
February 25, 2026, YouTube · YouTubevideo · the record (Paraphrased; said in the source itself)
The site
Where in Goodhue County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.
Tap a pin for the data center, the parcel for its record
This record: Proposed, ringed
data center
Dashed edge: the exact site is not in the public record
Smaller pins: 12 other published records in Minnesota
Details
this record's location, ringed
parcel outline, from the county parcel record
city limits, U.S. Census Bureau, on a town level record
county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
Where
Pine Island, Goodhue County, Minnesota
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.
Comparisons
3 metrics with more than one figure
Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.
Not disclosed. No source on file gives its capacity, its acreage or a count of buildings. What the record holds instead is under Disclosed.
Who is building Google Pine Island Data Center?
Google is the developer. No construction contractor is named on the record yet.
Who will use Google Pine Island Data Center?
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
How much power and water does Google Pine Island Data Center say it needs?
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Where does Google Pine Island Data Center stand today?
What has Pine Island or Goodhue County decided about it?
No decision by Pine Island or Goodhue County about data centers is on the record. The Goodhue County page and the Minnesota scorecard list every rated row the day a person publishes one.
What is still unknown about Google Pine Island Data Center?
Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
Sources
Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.
Data Center Record, "Google Pine Island Data Center", https://datacenterrecord.org/projects/google-pine-island-data-center-mn, last verified September 17, 2026.
Data Center Record, "Google Pine Island Data Center", https://datacenterrecord.org/projects/google-pine-island-data-center-mn. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.