● Proposed Campus Reported February 25, 2026 · 4 Buildings

Google Pine Island Data Center (Project Skyway)

Street address 500th Street NW and US Highway 52, Pine Island, MN 55963, Goodhue County verified address Exact, at the address [1] Google: Data center locations

Overview, regulatory gates and specifications

Google received municipal and environmental approvals for a 482 acre, 4 building hyperscale data center campus in Pine Island, Goodhue County, Minnesota. [1] Google hosted a community event in Pine Island, Minnesota regarding a proposed data center while facing political opposition including a congressional candidate's moratorium demand. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
4 buildings
agency filing

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 500th Street NW and US Highway 52, Pine Island, MN 55963.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed Reported by others: 2 GW (YouTube (opens in a new tab)). Their figure, not the record's.
Water usage
Not disclosed
Land area
Not disclosed
Buildings
4 buildings operator page
[1] datacenters.google
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Google as stated by the source
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Steve Holm

Democratic candidate for Minnesota House of Representatives, District 20B · Minnesota

DID Recorded statement at kaaltv.com (October 14, 2026)
SAID Holm said he supports a moratorium on large scale data centers (October 14, 2026) kaaltv.com (opens in a new tab)

Sara Bertschinger

Republican candidate for Minnesota House of Representatives, District 20B · Minnesota

DID Recorded statement at kaaltv.com (October 14, 2026)
SAID Sara Bertschinger proposed small nuclear plants to meet electricity demand for data center growth (October 14, 2026) kaaltv.com (opens in a new tab)

Keith Ellison

Minnesota Attorney General · Minnesota

DID Recorded statement at MPR News (October 3, 2026)
SAID Ellison contends that if Google terminates its 15 year contract early, other utility customers would face greater risk of cost burden. (October 3, 2026) mprnews.org (opens in a new tab)

Megan Boldt

Xcel Energy spokesperson

DID Recorded statement at MPR News (October 3, 2026)
SAID Xcel Energy stated that Google has agreed to fund 1,900 megawatts of new clean energy resources including wind, solar and battery storage at no cost to existing customers. (October 3, 2026) mprnews.org (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Google · Parent: Alphabet
UTILITIES
Electric utility: Not disclosed

View all 16 statements on the record in Minnesota →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Pine Island Data Center (Project Skyway).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 4 buildings agency filing [1] datacenters.google
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

October 7, 2025 Cannon Falls, MN Cannon Falls City Council Data Center Work Session and Public Hearing Cannon Falls City Council 3 clips

At its October 7, 2025 meeting, the Cannon Falls City Council addressed unanswered community questions from the Planning Commission hearing regarding a proposed hyperscale data center and scheduled a joint work session on water and zoning impacts.

  1. Matt Montgomery, Mayor, City of Cannon Falls Elected Official transcribed from the official recording
    "ability to respond. I know in the planning commission meeting a lot of questions were asked the way that those things played out like we weren't able to answer them. what we're alluded to on Thursday is our joint work session that we have again with the planning commission which is a public meeting. but thisformational only know actions decisions that are at that time but our chance for us as council and the planning commission to ask a lot more questions of the developer and the"
  2. Resident public comment Resident Public Comment transcribed from the official recording
    "questions because they were succinct and you know direct. So one water use as we've discussed in what we've presented in our in our studies there is a cap within the development agreement for water and sewer. So water distribution sewer collections. So on the water distribution side the requested amount is at the end point"
  3. Cannon Falls City Council Member Elected Official transcribed from the official recording
    "of 10 years, 43 million gallons per year is the is the cap of which water that they can they can draw from the city. just as an I think it's it's interesting the circumstances that are aligned to this. So the property that they are intending on purchasing has an irrigation well on it that has an appropriation for 41 million gallons per"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (content date)

    Google hosted a community event in Pine Island, Minnesota regarding a proposed data center while facing political opposition including a congressional candidate's moratorium demand.

    [1] datacenters.google

  2. (source date; the content gives no date of its own)

    Google is expected to announce the project's Panther Program and other initiatives benefiting the Pine Island School District, with a projected investment of $24 million.

    [3] kttc.com

  3. (source date; the content gives no date of its own)

    Google promised $3 million directly to Pine Island city.

    [3] kttc.com

  4. (source date; the content gives no date of its own)

    Google and Ryan Companies promised an initial capital investment of more than $700 million into Pine Island.

    [3] kttc.com

  5. (source date; the content gives no date of its own)

    The project site is located less than half a mile from a nearby residential home

    · Google · Reported February 25, 2026 · Privacy enhanced player · loads on click

    [5] youtube.com

  6. · Status: proposed (source date; the content gives no date of its own)

    The proposed data center will use advanced air cooling and minimal water compared to other data centers

    · Google · Reported February 25, 2026 · Privacy enhanced player · loads on click

    [5] youtube.com

Every event in order

15 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  5. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: video is tier 5 (the editor, September 23, 2026). The link did not change.

  6. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: video is tier 5 (the editor, September 23, 2026). The link did not change.

  7. · Timeline entry

    The note "(Entry dated by the video's upload date; see the correction.)" appended by the date correction of September 8, 2026 belongs in this log, not in the event sentence; the date basis of the row already says the date is the source's. The sentence is restored to the event only (September 13, 2026).

  8. · Timeline entry

    The note "(Entry dated by the video's upload date; see the correction.)" appended by the date correction of September 8, 2026 belongs in this log, not in the event sentence; the date basis of the row already says the date is the source's. The sentence is restored to the event only (September 13, 2026).

  9. · Date basis

    Date basis recorded (September 8, 2026, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own.

  10. · Date basis

    Date basis recorded (September 8, 2026, /methodology#dates): Jack Ailey speaks in the video, so the statement is dated by the video's upload date.

  11. · Date basis

    Date basis recorded (September 8, 2026, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own.

  12. · Date basis

    Date basis recorded (September 8, 2026, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own.

  13. · Date basis

    Date basis recorded (September 8, 2026, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own.

  14. · Timeline entry

    Dated by the video's upload date (KARE 11, February 25, 2026), which is the source date; the content gives no other date.

  15. · Timeline entry

    Dated by the video's upload date (KARE 11, February 25, 2026), which is the source date; the content gives no other date.

Every correction on the record is on the corrections page.

Nearest data centers in Minnesota

Verified data center records in Minnesota within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Q'Levr Inver Grove Heights Data Center Campus Inver Grove Heights, Dakota County 38 mi Proposed Q'Levr 4 buildings
Tract Farmington Technology Park Farmington, Dakota County 40 mi Proposed Tract 8 buildings
Meta Rosemount Data Center Campus Rosemount, Dakota County 42 mi Running Meta 150 MW
Oppidan Apple Valley Data Center Campus Apple Valley, Dakota County 45 mi Proposed Oppidan Investment Company 3 buildings
DataBank Eagan Data Center (MSP2) Eagan, Dakota County 50 mi Running DataBank 14 MW
Iron Gate Data Centers Eagan Eagan, Dakota County 51 mi Running Iron Gate Data Centers 6 MW

Blank cell: not disclosed by any source on file.

Comparisons

3 metrics with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Capacity at full buildout

1 figure, 1 source
Show each source's words
  • 2 GW, YouTube: Energy capacity is expanding by approximately 2 gigawatts with much or all proposed to be green energy

Permanent jobs

3 figures, 3 sources
100 jobs Reported

YouTube, Feb 25, 2026

9 jobs Reported

KTTC, Aug 19, 2026

Show each source's words
  • 290 jobs, minnpost.com: Pine Island development agreement's employment requirements could total 290 jobs across nine stages
  • 100 jobs, YouTube: Around 100 permanent jobs will be created by the data center
  • 9 jobs, KTTC: Google promises hundreds of new jobs with a job multiplier ratio of 9 to 1.

Tax each year

1 figure, 1 source
130,000,000 USD Reported

KTTC, Aug 19, 2026

Show each source's words
  • 130,000,000 USD, KTTC: Google promises more than $130 million in tax revenue in the first 28 years.

Common questions about Google Pine Island Data Center (Project Skyway)

Answered directly from the verified filings and local actions on this page.

Who is building Google Pine Island Data Center (Project Skyway)?

Google is the developer. No construction contractor is named on the record yet.

Who will use Google Pine Island Data Center (Project Skyway)?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Google Pine Island Data Center (Project Skyway) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Google Pine Island Data Center (Project Skyway) stand today?

It is approved; the date it reached that stage is not sourced, only the day a page was read. The newest entry, August 20, 2026: Google hosted a community event in Pine Island, Minnesota regarding a proposed data center while facing political opposition including a congressional candidate's moratorium demand. [1]

What is still unknown about Google Pine Island Data Center (Project Skyway)?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google: Data center locations (opens in a new tab), Google, September 14, 2026

Reporting

  1. A tale of two data centers: Google hosts events in to woo residents of Hermantown and Pine Island - MPR News (opens in a new tab), MPR News, August 20, 2026, local outlet
  2. Congressional candidate demands data center moratorium ahead of Google’s Pine Island celebration - KTTC | Rochester, MN (opens in a new tab), KTTC | Rochester, MN, August 19, 2026, local outlet
  3. Google launches a charm offensive in 2 Minnesota towns as data center opposition grows - MPR News (opens in a new tab), MPR News, August 20, 2026, local outlet
  4. Google building data center in Pine Island, Minnesota (opens in a new tab), YouTube, February 25, 2026, video

5 sources on file.

Regional grid context

This site is in the MRO West (MROW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google Pine Island Data Center (Project Skyway)", https://datacenterrecord.org/projects/google-pine-island-data-center-mn, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google Pine Island Data Center (Project Skyway)", https://datacenterrecord.org/projects/google-pine-island-data-center-mn. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
44.2058, -92.6485
How the location is known
Location from the site's street address.
Location source
https://www.ccpineisland.org/
Coordinate source
City of Pine Island AUAR environmental review parcel
Location last verified
September 16, 2026
Published
September 5, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows