Sources on this page
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Last verified: · 1 primary and 4 reporting sources
Google received municipal and environmental approvals for a 482 acre, 4 building hyperscale data center campus in Pine Island, Goodhue County, Minnesota. [1] Google hosted a community event in Pine Island, Minnesota regarding a proposed data center while facing political opposition including a congressional candidate's moratorium demand. [1]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 500th Street NW and US Highway 52, Pine Island, MN 55963.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Connected government officials, corporate entities, utilities and local rules on the public record.
Holm said he supports a moratorium on large scale data centers(October 14, 2026) kaaltv.com (opens in a new tab)
Sara Bertschinger proposed small nuclear plants to meet electricity demand for data center growth(October 14, 2026) kaaltv.com (opens in a new tab)
Ellison contends that if Google terminates its 15 year contract early, other utility customers would face greater risk of cost burden.(October 3, 2026) mprnews.org (opens in a new tab)
Xcel Energy stated that Google has agreed to fund 1,900 megawatts of new clean energy resources including wind, solar and battery storage at no cost to existing customers.(October 3, 2026) mprnews.org (opens in a new tab)
View all 16 statements on the record in Minnesota →
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Pine Island Data Center (Project Skyway).
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 4 buildings | agency filing [1] datacenters.google | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
At its October 7, 2025 meeting, the Cannon Falls City Council addressed unanswered community questions from the Planning Commission hearing regarding a proposed hyperscale data center and scheduled a joint work session on water and zoning impacts.
"ability to respond. I know in the planning commission meeting a lot of questions were asked the way that those things played out like we weren't able to answer them. what we're alluded to on Thursday is our joint work session that we have again with the planning commission which is a public meeting. but thisformational only know actions decisions that are at that time but our chance for us as council and the planning commission to ask a lot more questions of the developer and the"
"questions because they were succinct and you know direct. So one water use as we've discussed in what we've presented in our in our studies there is a cap within the development agreement for water and sewer. So water distribution sewer collections. So on the water distribution side the requested amount is at the end point"
"of 10 years, 43 million gallons per year is the is the cap of which water that they can they can draw from the city. just as an I think it's it's interesting the circumstances that are aligned to this. So the property that they are intending on purchasing has an irrigation well on it that has an appropriation for 41 million gallons per"
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
(content date)
Google hosted a community event in Pine Island, Minnesota regarding a proposed data center while facing political opposition including a congressional candidate's moratorium demand.
(source date; the content gives no date of its own)
Google is expected to announce the project's Panther Program and other initiatives benefiting the Pine Island School District, with a projected investment of $24 million.
(source date; the content gives no date of its own)
Google promised $3 million directly to Pine Island city.
(source date; the content gives no date of its own)
Google and Ryan Companies promised an initial capital investment of more than $700 million into Pine Island.
(source date; the content gives no date of its own)
· Status: proposed (source date; the content gives no date of its own)
The proposed data center will use advanced air cooling and minimal water compared to other data centers
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: video is tier 5 (the editor, September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: video is tier 5 (the editor, September 23, 2026). The link did not change.
The note "(Entry dated by the video's upload date; see the correction.)" appended by the date correction of September 8, 2026 belongs in this log, not in the event sentence; the date basis of the row already says the date is the source's. The sentence is restored to the event only (September 13, 2026).
The note "(Entry dated by the video's upload date; see the correction.)" appended by the date correction of September 8, 2026 belongs in this log, not in the event sentence; the date basis of the row already says the date is the source's. The sentence is restored to the event only (September 13, 2026).
Date basis recorded (September 8, 2026, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own.
Date basis recorded (September 8, 2026, /methodology#dates): Jack Ailey speaks in the video, so the statement is dated by the video's upload date.
Date basis recorded (September 8, 2026, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own.
Date basis recorded (September 8, 2026, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own.
Date basis recorded (September 8, 2026, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own.
Dated by the video's upload date (KARE 11, February 25, 2026), which is the source date; the content gives no other date.
Dated by the video's upload date (KARE 11, February 25, 2026), which is the source date; the content gives no other date.
Every correction on the record is on the corrections page.
Verified data center records in Minnesota within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Q'Levr Inver Grove Heights Data Center Campus Inver Grove Heights, Dakota County | 38 mi | Proposed | Q'Levr | 4 buildings |
| Tract Farmington Technology Park Farmington, Dakota County | 40 mi | Proposed | Tract | 8 buildings |
| Meta Rosemount Data Center Campus Rosemount, Dakota County | 42 mi | Running | Meta | 150 MW |
| Oppidan Apple Valley Data Center Campus Apple Valley, Dakota County | 45 mi | Proposed | Oppidan Investment Company | 3 buildings |
| DataBank Eagan Data Center (MSP2) Eagan, Dakota County | 50 mi | Running | DataBank | 14 MW |
| Iron Gate Data Centers Eagan Eagan, Dakota County | 51 mi | Running | Iron Gate Data Centers | 6 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Google is the developer. No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is approved; the date it reached that stage is not sourced, only the day a page was read. The newest entry, August 20, 2026: Google hosted a community event in Pine Island, Minnesota regarding a proposed data center while facing political opposition including a congressional candidate's moratorium demand. [1]
Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
Official operator or facility campus page verified in 50 state website discovery pass.
5 sources on file.
This site is in the MRO West (MROW) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Google Pine Island Data Center (Project Skyway). Last verified November 6, 2026. https://datacenterrecord.org/projects/google-pine-island-data-center-mn. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Google Pine Island Data Center (Project Skyway)
Data Center Record, "Google Pine Island Data Center (Project Skyway)", https://datacenterrecord.org/projects/google-pine-island-data-center-mn. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.