Equinix Culpeper

Equinix lists 4 data centers at Culpeper, Virginia among the sites it operates. It is running; the record holds no sourced date for when it reached that stage.

How much water it would use and who would use it have not been disclosed.

Last verified · 7 sources, 6 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
192 MW
third party estimate [7]
Water
Not disclosed
Who leads it
Equinix
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Where its power comes from
Dominion Energy substation
as stated by the source [7]
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 192 MW third party estimate [7] starexponent.com October 4, 2026
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Equinix as stated by the source October 4, 2026
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Dominion Energy substation as stated by the source [7] starexponent.com October 4, 2026
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. · Status: running (the day the page was read; it gives no date of its own)

    Equinix lists Equinix CU1, Equinix CU2, Equinix CU3, Equinix CU4 at Culpeper, Virginia on its own page of data center locations, read September 14, 2026. [2]

The full Equinix Culpeper timeline, in order

What was said

Governor Spanberger launching AI Task Force to tackle risks from rapid AI development
Abigail Spanberger, Governor of Virginia · September 22, 2026 · paraphrased · Culpeper Star-Exponent local outlet

Every statement about data centers in Virginia, by speaker

The site

The pin is the site, as the EPA's facility record places it. Location from an EPA air permit.

  • This record: Running, ringed
  • data center
  • Smaller pins: 35 other published records in Virginia
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
18155 Technology DR, Culpeper, VA 22701, Culpeper, Culpeper County, Virginia [source]
How exactly it is located
Exact, the point of the EPA's facility record
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
By the straight line between two exact points.

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Equinix Culpeper?

The record has one measure of its size: 192 MW (third party estimate, source). Its acreage is not disclosed.

Who is building Equinix Culpeper?

Equinix is the developer. No construction contractor is named on the record yet.

How much power and water does Equinix Culpeper say it needs?

Power: 192 MW (third party estimate, source). Water: not disclosed by any source on file.

Where does Equinix Culpeper stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. The newest entry, read on September 14, 2026: Equinix lists Equinix CU1, Equinix CU2, Equinix CU3, Equinix CU4 at Culpeper, Virginia on its own page of data center locations, read September 14, 2026. [2]

What has Culpeper or Culpeper County decided about it?

No decision by Culpeper or Culpeper County about data centers is on the record. The Culpeper County page and the Virginia scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Equinix: United States and Canada colocation data centers, Equinix, September 14, 2026
  2. Equinix: Equinix CU1, Equinix, September 14, 2026
  3. Equinix: Equinix CU2, Equinix, September 14, 2026
  4. Equinix: Equinix CU3, Equinix, September 14, 2026
  5. Equinix: Equinix CU4, Equinix, September 14, 2026
  6. EPA ECHO detailed facility report: Equinix, LLC, Cu 1-4, U.S. Environmental Protection Agency

Reporting

  1. Spanberger seeks tighter controls on Virginia data centers - Culpeper Star-Exponent, Culpeper Star-Exponent, September 22, 2026, local outlet

7 sources on file.

Cite this record

Data Center Record, "Equinix Culpeper", https://datacenterrecord.org/projects/equinix-culpeper-va, last verified October 4, 2026.

Last verified , first recorded . Every correction is logged on the corrections page.

Cite this page

Data Center Record, "Equinix Culpeper", https://datacenterrecord.org/projects/equinix-culpeper-va. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
equinix-culpeper-va
Status value
operational
Stage
Running
Tier
skeleton
Tags
skeleton
Place id
us/va/culpeper-county/culpeper
Coordinates
38.456463, -77.978209
Location precision
permit_point
Location source
https://echo.epa.gov/detailed-facility-report?fid=110033142454
Coordinate source
https://echo.epa.gov/detailed-facility-report?fid=110033142454
Location source number
[6]
Location last verified
October 4, 2026
EPA registry id
110033142454
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
third_party_estimate
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
192 MW, third party estimate
Rating of the county's rows
Not disclosed
Published
2026-09-14
Last verified
2026-10-04