Novva North Las Vegas data center

North Las Vegas, Clark County, NVDeveloper: Novva Data CentersCensus GEOID 32003

Stage
Proposed
Undisclosed in public filings
Power, Land, Buildings, Water

Novva Data Centers plans a 100 MW, 275,000 square foot data center on a 20 acre campus in North Las Vegas, expected to open in late 2023, with state tax abatements approved in summer 2022. It is reported; the record holds no sourced date for when it reached that stage.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Who leads it
Novva Data Centers as stated by the source
How it is cooled
Closed loop liquid as stated by the source
[1] datacenterfrontier.com
Undisclosed in public filings
Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Novva Data Centers as stated by the source October 21, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled Closed loop liquid as stated by the source [1] datacenterfrontier.com (opens in a new tab) October 21, 2026
Cooling fluid

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Clark County and North Las Vegas about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Boulder City Boulder City is fighting an attempt to build a data center on nearby federal land nevadacurrent.com (opens in a new tab)
Boulder City Citizens initiative filed asking Boulder City to require voter approval before any future data center approval within city limits nationofchange.org (opens in a new tab)
Boulder City Boulder City Planning Commission voted in May 2026 against allowing data centers under city land use rules nationofchange.org (opens in a new tab)
Boulder City Local residents will vote on measure in November to determine if Boulder City should change zoning regulations knpr.org (opens in a new tab)

What happened

No dated entry is on the record yet.

The site

No location is on file for this record, so it has no pin on any map. It is placed in Clark County, North Las Vegas, by name only.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Novva North Las Vegas data center?

Novva Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does Novva North Las Vegas data center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Novva North Las Vegas data center stand today?

It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has North Las Vegas or Clark County decided about it?

Boulder City: Boulder City is fighting an attempt to build a data center on nearby federal land (reported September 18, 2026, nevadacurrent.com (opens in a new tab)); and Boulder City: Citizens initiative filed asking Boulder City to require voter approval before any future data center approval within city limits (reported September 9, 2026, nationofchange.org (opens in a new tab)). 4 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Novva Data Centers Enters Las Vegas Market with 100 MW Project - Data Center Frontier (opens in a new tab), Data Center Frontier, September 13, 2022, query feed

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Novva North Las Vegas data center", https://datacenterrecord.org/projects/novva-north-las-vegas-data-center-nv, last verified October 21, 2026. CSV · JSON
Cite this page

Data Center Record, "Novva North Las Vegas data center", https://datacenterrecord.org/projects/novva-north-las-vegas-data-center-nv. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Cooling
Closed loop liquid
Capacity, if disclosed
100 MW, not disclosed
Published
October 21, 2026
Last verified
October 21, 2026
Undisclosed in public filings
Coordinates, How the location is known, Location source, Coordinate source, Location source number, Location last verified, EPA registry id, Uses, Tenancy, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows