● Proposed Campus Recorded August 15, 2026 · 2 Buildings

Nebius AI Data Center Independence

Street address East US Highway 24 and Little Blue Parkway, Independence, MO 64058, Jackson County verified address Exact, at the address [1] yahoo.com

Overview, regulatory gates and specifications

Nebius Group received City of Independence Chapter 100 industrial development bond and municipal power approvals for a 300 MW AI data center campus in Independence, Jackson County, Missouri. [1] Filings on the record specify 2 planned or operational buildings. [1] A multibillion dollar Nebius AI data center was proposed in Independence, Missouri, prompting a tax break vote and subsequent recall of Councilman John Perkins, as well as a lawsuit filed to stop the project. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Incentive review
4. Utility Grid Queue
300 MW disclosed
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand [1]
300 MW
the developer's figure

Equivalent to ~249,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 14% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
2 buildings
agency filing

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: East US Highway 24 and Little Blue Parkway, Independence, MO 64058.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
300 MW developer figure Equivalent to the continuous electricity demand of about 249,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 3 percent of New York City's summer peak demand in 2024.
[1] yahoo.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[1] yahoo.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Nebius Group as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Nebius AI Data Center Independence, capacity: 300 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 300 ÷ 10,245 = 0.03 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Nebius Group
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Nebius AI Data Center Independence.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 300 MW the developer's figure [1] yahoo.com
Site Footprint (Acres)
Data Hall Buildings 2 buildings agency filing [1] yahoo.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

March 2, 2026 Independence, MO Independence City Council Nebius AI Factory Tax Abatement and Zoning Hearing Independence City Council 3 clips

At a packed March 2, 2026 meeting, the Independence City Council debated Chapter 100 industrial revenue bonds and zoning for European cloud operator Nebius Group's multi billion dollar AI Factory campus as residents raised concerns over municipal power utility rates and water consumption.

  1. Rory Rowland, Mayor, City of Independence Elected Official transcribed from local broadcast report
    "Brian. Brya I’ve covered a lot of these meetings over the years, but this one was packed way more attendance than any of the city council meeting I’ve ever seen. They have the main room full. They’ve got an overflow full. The whole parking lot had was terribly full. People had to walk really far away. They had 60 different people sign up to speak. They each get up to five minutes. So this is going to be a long night. Take a look inside from video we shot earlier."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Nevus is the company. They’re asking the city to take legal title of this data center if approved, so that the development is tax exempt. It’s a 20 year deal. The company is asking for a 90% tax abatement for those 20 years. That will cover. The company was wanting that tax break on both the building and the servers inside those servers. They will replace every five years, they say. Now, in lieu of taxes, nebia will plan to pay hundreds of millions of dollars to the city and the school district."
  3. KMBC 9 Broadcast Report Broadcast Report transcribed from local broadcast report
    "It will cover about 2,000,000ft of warehouses. Now, the data center will use lots of power, and that was one point of contention, equivalent to about 500,000 new homes. Once completed, the center will employ about 130 full time jobs. Now, those in favor see this as a huge construction project. Great for the area. Those against have concerns about noise, utility costs and those tax credits. These are just hypotheticals."
Said and filed

Said and filed

Statements and filings, side by side

Tax Abatements Power & Grid Water Zoning
Column A · Dated Statement
Nebius Group & Independence Economic Development Proponents Developer & Municipal Proponents
Venue: Independence AI Factory Announcement & Tax Incentive Pitch
"Pitched the multi billion dollar Nebius AI Factory as a revenue generator that would modernize Independence Power and Light without burdening residential ratepayers."
Column B · Primary Government Record
Independence City Council Chapter 100 Tax Abatement & Municipal Utility Load Hearing
Independence City Council Hearing (March 2, 2026)
Agency or Venue: Independence City Council
"At the packed March 2, 2026 Independence City Council hearing, municipal records and resident testimony scrutinized multi decade Chapter 100 tax abatements, massive power generation requirements, and cooling water demand."
KMBC 9 News Kansas City

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (content date)

    A multibillion dollar Nebius AI data center was proposed in Independence, Missouri, prompting a tax break vote and subsequent recall of Councilman John Perkins, as well as a lawsuit filed to stop the project.

    [1] yahoo.com

  2. · Status: proposed (content date)

    Nebius proposed a $150 billion AI data center in Independence, Kansas, which neighbors have filed a lawsuit to stop.

    [1] yahoo.com

Every event in order

20 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  5. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  6. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  7. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  8. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  9. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  10. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  11. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  12. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  13. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  14. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  15. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

See all 20 corrections for this record (5 more) →

Every correction on the record is on the corrections page.

Nearest data centers in Missouri

Verified data center records in Missouri within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
LightEdge Kansas City SubTropolis Data Center (KCI1) Kansas City, Clay County 8 mi Running LightEdge Solutions 12 MW
Edged Kansas City Data Center Campus (KCM01) Kansas City, Clay County 8 mi Being built Edged Energy 100 MW
Iron Mountain Kansas City Data Center (KCM1) Kansas City, Jackson County 10 mi Running Iron Mountain Data Centers 9 MW
Google Kansas City Data Center Campus (Project Ranger) Kansas City, Jackson County 11 mi Being built Google 4 buildings
Cube NA Data Center Kansas City (101 Holmes) Kansas City, Jackson County 12 mi Running Cube NA Data Center Company 6 MW
DataBank Kansas City Data Center (MCI1) Kansas City, Jackson County 12 mi Running DataBank 10 MW

Blank cell: not disclosed by any source on file.

Common questions about Nebius AI Data Center Independence

Answered directly from the verified filings and local actions on this page.

Who is building Nebius AI Data Center Independence?

Nebius Group is the developer. No construction contractor is named on the record yet.

How much power and water does Nebius AI Data Center Independence say it needs?

Power: 300 MW (the developer's figure, yahoo.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Nebius AI Data Center Independence stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Missouri voters recall councilman over Nebius data-center tax break - Blockspace Media (opens in a new tab), Blockspace Media, September 3, 2026, national outlet
  2. After voting for Independence data center, council member faces recall election next week - KSHB 41 Kansas City (opens in a new tab), KSHB 41 Kansas City, August 25, 2026, local outlet
  3. Independence hits pause on data centers as Nebius construction moves forward (opens in a new tab), www.kctv5.com, July 8, 2026, local outlet
  4. Voters in Missouri City Overwhelmingly Vote to Recall Councilman Who Approved Data Center - commondreams.org (opens in a new tab), commondreams.org, September 2, 2026, national outlet
  5. Independence Councilman John Perkins recalled after voting to approve multibillion-dollar data center - KMBC (opens in a new tab), KMBC, September 2, 2026, local outlet
  6. Missouri Officials Ousted For Approving Massive Data Center - Newsweek (opens in a new tab), Newsweek, September 2, 2026, national outlet
  7. Almost 70% of voters in Missouri city vote to recall council member who said yes to AI data center tax breaks — councilor said disagreement over an issue shouldn’t be enough to unseat him - Tom's Hardware (opens in a new tab), Tom's Hardware, September 3, 2026, national outlet
  8. The Growing Opposition to AI Data Centers — Independence, MO Recall Vote - Daily Kos (opens in a new tab), Daily Kos, September 3, 2026, national outlet
  9. He Voted for a Massive AI Data Center, Got Recalled by 68% of Voters - Gadget Review (opens in a new tab), Gadget Review, September 2, 2026, national outlet
  10. Independence voters recall councilman tied to data center tax vote - kctv5.com (opens in a new tab), kctv5.com, September 2, 2026, local outlet
  11. Independence voters decide recall of councilman tied to data center tax vote - kctv5.com (opens in a new tab), kctv5.com, September 1, 2026, local outlet
  12. Anger over planned AI data center drives Missouri city’s voters to recall council member - NBC News (opens in a new tab), NBC News, September 2, 2026, national outlet
9 more sources
  1. Independence councilman faces recall over data center vote - kctv5.com (opens in a new tab), kctv5.com, August 26, 2026, local outlet
  2. New lawsuit attempting to stop multi-billion data center project in Independence - KMBC (opens in a new tab), KMBC, August 13, 2026, local outlet
  3. Independence neighbors sue to stop construction of $150 billion AI data center - kansascity.com (opens in a new tab), kansascity.com, August 15, 2026, local outlet
  4. In­de­pen­dence group files lawsuit to block Nebius' AI data center - Spectrum News (opens in a new tab), Spectrum News, August 13, 2026, local outlet
  5. Bly Road residents file 52-page lawsuit to stop Independence AI data center project - KSHB 41 Kansas City (opens in a new tab), KSHB 41 Kansas City, August 13, 2026, local outlet
  6. Independence’s AI data center deal cost another council member his seat. What happens next? - kcur.org (opens in a new tab), kcur.org, September 3, 2026, local outlet
  7. Independence looks to add more regulations, guidelines for future data center development - KSHB 41 Kansas City (opens in a new tab), KSHB 41 Kansas City, August 17, 2026, local outlet
  8. Independence councilman recalled by voters in his district after his vote for data center tax incentives - KSHB 41 Kansas City (opens in a new tab), KSHB 41 Kansas City, September 2, 2026, local outlet
  9. Independence Councilman John Perkins to learn recall vote fate after data center support - KSHB 41 Kansas City (opens in a new tab), KSHB 41 Kansas City, September 1, 2026, local outlet

21 sources on file.

Regional grid context

This site is in the SERC Midwest (SRMW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Nebius AI Data Center Independence", https://datacenterrecord.org/projects/nebius-ai-data-center-independence-mo, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Nebius AI Data Center Independence", https://datacenterrecord.org/projects/nebius-ai-data-center-independence-mo. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
39.0911, -94.3525
How the location is known
Location from the site's street address.
Location source
https://www.independencemo.gov/
Coordinate source
City of Independence Chapter 100 bond approval parcel
Location last verified
September 16, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
300 MW, the developer's figure
Published
September 5, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Nebius AI Data Center Independence · 21 sources, 2 entries · basis and source tier on every row · verified November 6, 2026