Data Center Record.

Proposed Built from one source

QTS Atlanta 2 (Westside)

Atlanta, Fulton County, GADeveloper: QTSCensus GEOID 13121

Stage
Proposed
Water
430,000 gallons a day
the developer's figure
Undisclosed in public filings
Power, Land, Buildings

QTS announced plans for a 1.5 million square foot data center campus with 400 residential units on Atlanta's Westside, later filing a BeltLine SAP application for the expansion, while pausing a request for $45 million in tax incentives. It is reported; the record holds no sourced date for when it reached that stage.

How much power it needs and who would use it have not been disclosed.

Last verified · 10 sources, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Water
430,000 gallons a day the developer's figure Not compared: the source did not say whether the figure is withdrawal or consumptive use.
[3] whatnow.com
Who leads it
QTS as stated by the source
Undisclosed in public filings
Land, Buildings, Power it would draw, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use 430,000 gallons a day the developer's figure [3] whatnow.com (opens in a new tab) October 21, 2026
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it QTS as stated by the source October 21, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Fulton County and Atlanta about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Atlanta Atlanta City Council introduced new legislation aimed at regulating local data centers and eliminating their tax breaks theatlantavoice.com (opens in a new tab)
Atlanta Communities placing moratoriums on data center development citing concerns about power and water usage, traffic, environmental impacts and noise wsbradio.com (opens in a new tab)

What happened

No dated entry is on the record yet.

The site

No location is on file for this record, so it has no pin on any map. It is placed in Fulton County, Atlanta, by name only.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building QTS Atlanta 2 (Westside)?

QTS is the developer. No construction contractor is named on the record yet.

How much power and water does QTS Atlanta 2 (Westside) say it needs?

Power: not disclosed by any source on file. Water: 430,000 gallons a day (the developer's figure, whatnow.com (opens in a new tab)).

Where does QTS Atlanta 2 (Westside) stand today?

It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Atlanta or Fulton County decided about it?

Atlanta: Atlanta City Council introduced new legislation aimed at regulating local data centers and eliminating their tax breaks (reported August 26, 2026, theatlantavoice.com (opens in a new tab)); and Atlanta: Communities placing moratoriums on data center development citing concerns about power and water usage, traffic, environmental impacts and noise (reported July 2, 2026, wsbradio.com (opens in a new tab)). 2 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. QTS, Georgia Tech Growing Data Center Presence In Georgia - Bisnow (opens in a new tab), Bisnow, February 27, 2019, query feed
  2. Proposed data center offers glimpse of Westside Atlanta's tech future - The Business Journals (opens in a new tab), The Business Journals, May 13, 2021, query feed
  3. QTS Plans 1.5 Million-Square-Foot Data Center Campus, 400 Units In Westside Atlanta - WhatNow (opens in a new tab), WhatNow, April 24, 2021, query feed
  4. BeltLine SAP Application Filed for Westside QTS Data Center Expansion - WhatNow (opens in a new tab), WhatNow, April 8, 2025, query feed
  5. QTS Data Centers pauses request for $45m in tax breaks at Atlanta site - Data Center Dynamics (opens in a new tab), Data Center Dynamics, April 26, 2023, query feed
  6. QTS pauses request for $45 million Atlanta tax break - The Business Journals (opens in a new tab), The Business Journals, April 25, 2023, query feed
  7. QTS to build another data center in Atlanta, Georgia - Data Center Dynamics (opens in a new tab), Data Center Dynamics, April 16, 2021, query feed
  8. West of Midtown, data center expansion on BeltLine corridor is a go - Urbanize Atlanta (opens in a new tab), Urbanize Atlanta, April 11, 2022, query feed
  9. Major data center partners with Amazon Web Services, expands Atlanta capabilities - The Business Journals (opens in a new tab), The Business Journals, March 23, 2022, query feed
  10. New data center, office and residential project planned near Fulton jail - AJC.com (opens in a new tab), AJC.com, April 15, 2021, query feed

10 sources on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "QTS Atlanta 2 (Westside)", https://datacenterrecord.org/projects/qts-atlanta-2-westside-ga, last verified October 21, 2026. CSV · JSON
Cite this page

Data Center Record, "QTS Atlanta 2 (Westside)", https://datacenterrecord.org/projects/qts-atlanta-2-westside-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
How water was disclosed
the developer's figure
Published
October 21, 2026
Last verified
October 21, 2026
Undisclosed in public filings
Coordinates, How the location is known, Location source, Coordinate source, Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · QTS Atlanta 2 (Westside) · 10 sources, 0 entries, 2 decisions nearby · basis and source tier on every row · verified October 21, 2026

Download CSV JSON