Data Center Record.

Running Reviewed in depth

Google Stonewall Business Park data center

Leesburg, Loudoun County, VADeveloper: GoogleCensus GEOID 51107

Stage
Running
Undisclosed in public filings
Power, Land, Buildings

Google operates the Leesburg data center campus at 20491 Goose Landing Lane in Leesburg, Loudoun County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110070558483) and reported in the Google 2026 Environmental Report with 238.1 million gallons of annual water withdrawal in 2025. It is running; the record holds no sourced date for when it reached that stage.

How much power it needs and who would use it have not been disclosed.

Last verified · 3 sources, 2 primary · Reviewed by a person, every entry sourced. · How to read this page

  • This record: Running, ringed
  • data center
  • Smaller pins: 55 other published records in Virginia
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Water
238,100,000 gallons a year (withdrawal) measured What at most 2,174 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
[1] sustainability.google
Who leads it
Google as stated by the source
Undisclosed in public filings
Land, Buildings, Power it would draw, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Google Stonewall Business Park data center, water: 238,100,000 gallons a year.
  2. 238,100,000 gallons a year ÷ 365 = 652,329 gallons a day.
  3. Water used at home each day by the average American family, more than: 300 gallons a day.
  4. 652,328.77 ÷ 300 = 2,174.43 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use 238,100,000 gallons a year (withdrawal) measured [1] sustainability.google (opens in a new tab) October 24, 2026
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Google as stated by the source October 24, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Loudoun County and Leesburg about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Loudoun County restrictive Virginia Loudoun County moved future projects to special exception process commercialobserver.com (opens in a new tab)
Loudoun County restrictive Loudoun County holding two open house meetings on September 28 and 30, 2026 to discuss phase two data center policy standards patch.com (opens in a new tab)
Loudoun County restrictive Phase one of Loudoun County data center policy overhaul was approved in March 2025 and ended by right data center development except for already approved projects patch.com (opens in a new tab)
Loudoun County restrictive Loudoun County Board of Supervisors launched data center policy review project in 2024 patch.com (opens in a new tab)
Loudoun County restrictive Loudoun County had already removed data centers as a by right zoning option and is exploring removing by right status to grandfathered projects datacenterdynamics.com (opens in a new tab)
Loudoun County restrictive Loudoun County Board of Supervisors voted 7-1 on motion to pause data center applications for 12 months, effective immediately datacenterdynamics.com (opens in a new tab)
6 earlier decisions on the county's rows
DateWhoDecisionSource
Loudoun County restrictive Loudoun County Board of Supervisors voted 7-1-1 to direct staff to prepare a 12 month pause resolution on data center and substation applications, effective September 15, 2026. yahoo.com (opens in a new tab)
Loudoun County restrictive Staff recommendation is that Loudoun County board take no action on data center moratorium fox5dc.com (opens in a new tab)
Loudoun County restrictive Loudoun County supervisors scheduled to discuss possible data center moratorium at business meeting Tuesday at 4 p.m. fox5dc.com (opens in a new tab)
Loudoun County restrictive Virginia's Loudoun County is considering limits on new data centers after decades of rapid growth baltimoresun.com (opens in a new tab)
Loudoun County restrictive By 2008, Loudoun County launched a marketing push to lure more data center facilities to the area moneywise.com (opens in a new tab)
Loudoun County restrictive In 2000, Loudoun's zoning administrator determined that data centers could be treated like office buildings and built by right in office zoned areas without Board of Supervisors approval moneywise.com (opens in a new tab)

What happened

No dated entry is on the record yet.

  • Read on October 24, 2026 (the day the page was read; it gives no date of its own)

    EPA ECHO Detailed Facility Report (FRS ID 110070558483) and Google 2026 Environmental Report list the Leesburg data center campus at 20491 Goose Landing Lane as operational.

    [2] echo.epa.gov

The site

The pin is the site, as the EPA's facility record places it. Location from an EPA facility record.

The site map is at the top of the page.

Where
20491 Goose Landing Lane, Leesburg, VA 20175, Leesburg, Loudoun County, Virginia [2] echo.epa.gov (opens in a new tab)
How exactly it is located
Exact, the point of the EPA's facility record
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
By the straight line between two exact points.

USGS NAIP aerial view of Google Stonewall Business Park data center
LAT 38.98687 / LON -77.57920 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Google Stonewall Business Park data center?

Google is the developer. No construction contractor is named on the record yet.

How much power and water does Google Stonewall Business Park data center say it needs?

Power: not disclosed by any source on file. Water: 238,100,000 gallons a year (withdrawal) (measured, sustainability.google (opens in a new tab)).

Where does Google Stonewall Business Park data center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Leesburg or Loudoun County decided about it?

Loudoun County (rated restrictive): Virginia Loudoun County moved future projects to special exception process (reported September 23, 2026, commercialobserver.com (opens in a new tab)); and Loudoun County: Loudoun County holding two open house meetings on September 28 and 30, 2026 to discuss phase two data center policy standards (reported September 21, 2026, patch.com (opens in a new tab)). 12 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Google 2026 Environmental Report (Page 97: Water use by data center location, Leesburg, VA) (opens in a new tab), Google
  2. EPA ECHO detailed facility report: Leesburg VA Data Center (Google) (opens in a new tab), U.S. Environmental Protection Agency

Reporting

  1. Google Buys 148 Acres To Build 2 Data Centers In Loudoun County - Bisnow (opens in a new tab), Bisnow, November 30, 2017, news outlet

3 sources on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Google Stonewall Business Park data center", https://datacenterrecord.org/projects/google-stonewall-business-park-data-center-leesburg-va, last verified October 24, 2026. CSV · JSON
Cite this page

Data Center Record, "Google Stonewall Business Park data center", https://datacenterrecord.org/projects/google-stonewall-business-park-data-center-leesburg-va. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
38.986875, -77.579202
How the location is known
Location from an EPA facility record.
Location source
EPA ECHO Detailed Facility Report (FRS ID 110070558483) for Leesburg VA Data Center (Google) at 20491 Goose Landing Lane, Leesburg, VA 20175.
Coordinate source
EPA ECHO FRS ID 110070558483
Location last verified
October 24, 2026
How water was disclosed
measured
Rating of the county's rows
Restrictive
Published
October 21, 2026
Last verified
October 24, 2026
Undisclosed in public filings
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed

Researcher view · Google Stonewall Business Park data center · 3 sources, 1 entry, 12 decisions nearby · basis and source tier on every row · verified October 24, 2026

Download CSV JSON