The EPA's facility registry lists Microsoft Blue Ridge (IAD11-12-13) Data Center at 24282 Quail Ridge LN, Aldie, VA 20105 in Aldie, Virginia, with air and water permits. It is not yet verified: a public permit shows this site exists; its current status has not been confirmed from a record.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 1 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
Microsoft
as stated by the source [1]
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Microsoft as stated by the source [1] echo.epa.gov October 3, 2026
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Loudoun County and Aldie about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Loudoun County restrictive Virginia Loudoun County moved future projects to special exception process commercialobserver.com
Loudoun County restrictive Loudoun County holding two open house meetings on September 28 and 30, 2026 to discuss phase two data center policy standards patch.com
Loudoun County restrictive Phase one of Loudoun County data center policy overhaul was approved in March 2025 and ended by right data center development except for already approved projects patch.com
Loudoun County restrictive Loudoun County Board of Supervisors launched data center policy review project in 2024 patch.com
Loudoun County restrictive Loudoun County had already removed data centers as a by right zoning option and is exploring removing by right status to grandfathered projects datacenterdynamics.com
Loudoun County restrictive Loudoun County Board of Supervisors voted 7-1-1 to direct staff to prepare a 12 month pause resolution on data center and substation applications, effective September 15, 2026. yahoo.com
1 earlier decision on the county's rows
DateWhoDecisionSource
Loudoun County restrictive Virginia's Loudoun County is considering limits on new data centers after decades of rapid growth baltimoresun.com

What happened

No dated entry is on the record yet.

The site

The pin is the site, as the EPA's facility record places it. Location from an EPA air permit.

  • This record: Not yet verified, ringed
  • data center
  • Smaller pins: 35 other published records in Virginia
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
24282 Quail Ridge LN, Aldie, VA 20105, Aldie, Loudoun County, Virginia [source]
How exactly it is located
Exact, the point of the EPA's facility record
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
By the straight line between two exact points.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Microsoft Blue Ridge (IAD11-12-13) Data Center?

Microsoft is the developer, source. No construction contractor is named on the record yet.

How much power and water does Microsoft Blue Ridge (IAD11-12-13) Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Microsoft Blue Ridge (IAD11-12-13) Data Center stand today?

It is not yet verified: a public permit shows this site exists; its current status has not been confirmed from a record. No dated entry is on the record yet.

What has Aldie or Loudoun County decided about it?

Loudoun County (rated restrictive): Virginia Loudoun County moved future projects to special exception process (reported September 23, 2026, source); and Loudoun County: Loudoun County holding two open house meetings on September 28 and 30, 2026 to discuss phase two data center policy standards (reported September 21, 2026, source). 7 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO detailed facility report: Microsoft Blue Ridge (IAD11-12-13) Data Center, U.S. Environmental Protection Agency

1 source on file.

Cite this record

Data Center Record, "Microsoft Blue Ridge (IAD11-12-13) Data Center", https://datacenterrecord.org/projects/microsoft-blue-ridge-iad11-12-13-data-center-aldie-va, last verified October 3, 2026.

Last verified , first recorded . Every correction is logged on the corrections page.

Cite this page

Data Center Record, "Microsoft Blue Ridge (IAD11-12-13) Data Center", https://datacenterrecord.org/projects/microsoft-blue-ridge-iad11-12-13-data-center-aldie-va. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
microsoft-blue-ridge-iad11-12-13-data-center-aldie-va
Status value
not_verified
Stage
Not yet verified
Tier
skeleton
Tags
skeleton
Place id
us/va/loudoun-county/aldie
Coordinates
38.94549, -77.55899
Location precision
permit_point
Location source
EPA ECHO facility record 110071448594: the registry placed its point by address matching house number, accurate to 30 m
Coordinate source
epa frs point
Location source number
[1]
Location last verified
October 3, 2026
EPA registry id
110071448594
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Restrictive
Published
2026-10-03
Last verified
2026-10-03