T5 Data Centers Augusta Campus
Augusta, Richmond County, GADeveloper: T5 Data CentersCensus GEOID 13245
- Stage
- Proposed
- Undisclosed in public filings
- Power, Land, Buildings
T5 Data Centers announced construction of a 200 MW data center campus in Augusta, Georgia. It is reported; the record holds no sourced date for when it reached that stage.
How much power it needs and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Water
- 44,000 gallons a day the developer's figure Not compared: the source did not say whether the figure is withdrawal or consumptive use.
- [1] dgtlinfra.com
- Who leads it
- T5 Data Centers as stated by the source
- Undisclosed in public filings
- Land, Buildings, Power it would draw, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | ||||
| How much water it would use | 44,000 gallons a day | the developer's figure | [1] dgtlinfra.com (opens in a new tab) | October 21, 2026 |
| How loud it would be | ||||
| Jobs once it runs | ||||
| Tax it would pay each year |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | T5 Data Centers | as stated by the source | October 21, 2026 | |
| Who is constructing it | ||||
| How much land | ||||
| Buildings | ||||
| Where its power comes from | ||||
| Grid connection | ||||
| How it is cooled |
A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Who would use it A lease announcement or a tenant named in a filing.
- Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.
What was decided
Acts of Richmond County and Augusta about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Augusta | Augusta Commission planned to vote on data center ordinance on September 15, 2026 | wfxg.com (opens in a new tab) | |
| Augusta | Augusta released final draft of data center ordinance with redline version showing all revisions | wfxg.com (opens in a new tab) | |
| Augusta | Augusta leaders hosted meeting on data center ordinance | wrdw.com (opens in a new tab) |
What happened
No dated entry is on the record yet.
The site
No location is on file for this record, so it has no pin on any map. It is placed in Richmond County, Augusta, by name only.
Keep going
Questions about this project
4 questions answered from the record
Who is building T5 Data Centers Augusta Campus?
-
T5 Data Centers is the developer. No construction contractor is named on the record yet.
How much power and water does T5 Data Centers Augusta Campus say it needs?
-
Power: not disclosed by any source on file. Water: 44,000 gallons a day (the developer's figure, dgtlinfra.com (opens in a new tab)).
Where does T5 Data Centers Augusta Campus stand today?
-
It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
What has Augusta or Richmond County decided about it?
-
Augusta: Augusta Commission planned to vote on data center ordinance on September 15, 2026 (reported September 9, 2026, wfxg.com (opens in a new tab)); and Augusta: Augusta released final draft of data center ordinance with redline version showing all revisions (reported September 9, 2026, wfxg.com (opens in a new tab)). 3 events are on the county's rows; a rule about the area is not a decision about this record.
Sources
Reporting
- T5 Data Centers to Construct 200 MW Augusta, Georgia Campus - Dgtl Infra (opens in a new tab), Dgtl Infra, January 18, 2022, query feed
1 source on file.
About this data
Last verified and first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about T5 Data Centers Augusta Campus
Cite this page
Data Center Record, "T5 Data Centers Augusta Campus", https://datacenterrecord.org/projects/t5-data-centers-augusta-campus-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Stage
- Proposed
- Tier
- built from one source
- Tags
- Built from one source
- How water was disclosed
- the developer's figure
- Capacity, if disclosed
- 200 MW, not disclosed
- Published
- October 21, 2026
- Last verified
- October 21, 2026
- Undisclosed in public filings