Data Center Record.
Census GEOID: 24021 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 3 primary sources

● Running First recorded September 14, 2026 · 2 Buildings

Aligned Data Centers Frederick Campus (IAD-04)

Street address 5601 Manor Woods Road, Frederick, MD 21703, Frederick County verified address Exact, at the address [2] Aligned Data Centers: Aligned IAD-04

Overview, regulatory gates and specifications

Aligned Data Centers operates its IAD04 hyperscale data center campus at 5601 Manor Woods Road in Frederick, Frederick County, Maryland, with 108 MW of planned and operational capacity across 2 buildings. [1] Aligned Data Centers lists Aligned IAD-04 at Frederick, Maryland on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [2]
108 MW
the developer's figure

Equivalent to ~89,640 U.S. homes (U.S. EIA 830 homes/MW baseline) · 5.2% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
2 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 5601 Manor Woods Road, Frederick, MD 21703.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
108 MW developer figure Equivalent to the continuous electricity demand of about 89,600 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 1 percent of New York City's summer peak demand in 2024.
[2] aligneddc.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[2] aligneddc.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2023 (3 years)
Who leads it
Aligned Data Centers as stated by the source
Official project website
aligneddc.com (opens in a new tab) verified October 28, 2026
aligneddc.com (opens in a new tab)
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Aligned Data Centers Frederick Campus (IAD-04), capacity: 108 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 108 ÷ 10,245 = 0.01 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Aligned Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Aligned Data Centers Frederick Campus (IAD-04).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 108 MW 108 MW the developer's figure [2] aligneddc.com
Site Footprint (Acres)
Data Hall Buildings 2 buildings 2 operator page [2] aligneddc.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

December 23, 2025 Frederick, MD Frederick County Council Critical Digital Infrastructure Overlay Vote Frederick County Council 3 clips

On December 23, 2025, the Frederick County Council voted to approve a Critical Digital Infrastructure zoning framework paving the way for expanded hyperscale data center development around the Quantum Loophole campus despite resident protests over transmission corridors and farmland loss.

  1. Brad Young, Council President, Frederick County Council Elected Official transcribed from local broadcast report
    "County Council just approved a measure that could potentially bring in a lot more data centers to the rural part of this Maryland county. But the discussion before the vote was not without some really tense moments for because I didn't agree with the parameters. We are where we are now, with sparks flying at times as members of the Council debated a proposal that paves the way for more data centers to be built in Frederick County, which is around 50 miles northwest of"
  2. ABC 7 News - WJLA Broadcast Report Broadcast Report transcribed from local broadcast report
    "of experience. There are currently 17 data centers in the county, according to one official. But by 5 to 2 vote, the council approved zoning a little more than 2600 acres for data center development, which is double the size of the current campus. I think we need to limit ourselves because, you know, water is something you take for granted until you don't have it. Electricity is something you depend on and think is just normal until you have a rolling brownout. This"
  3. ABC 7 News - WJLA Broadcast Report Broadcast Report transcribed from local broadcast report
    "support it. This back and forth among council members, echoing what we saw from members of the community last week, supporters pointing to the need for these facilities for their super computing powers, enabling every day tasks like storage for cell phones and computers, as well as the potential for economic benefits. Critics raising concern with pollution, noise and electricity costs. We need business taxes. We need revenue"
Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Frederick County Council & Administration County Governing Body
Venue: Frederick County Farmland & Industrial Footprint Assurances
"Assured residents that hyperscale data center development would remain confined to the existing Eastalco aluminum smelter industrial footprint without encroaching on surrounding Frederick County farmland."
Column B · Subsequent Recorded Position
Frederick County Council Adoption of Critical Digital Infrastructure Zoning Overlay
Frederick County CDI Zoning Ordinance (Adopted Dec 23, 2025)
Agency or Venue: Frederick County Council
"On December 23, 2025, the Frederick County Council voted to adopt the Critical Digital Infrastructure overlay ordinance creating a mechanism to expand data center zoning onto additional acreage over resident objections."
ABC 7 WJLA Washington

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Aligned Data Centers lists Aligned IAD-04 at Frederick, Maryland on its own page of data center locations, read September 14, 2026.

    [2] aligneddc.com

Nearest data centers in Maryland

Verified data center records in Maryland within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Catellus and Quantum Loophole Frederick Eastalco Master Data Center Campus Frederick, Frederick County Less than 1 mi Proposed Catellus Development / Quantum Loophole 500 MW
Rowan Digital Infrastructure Frederick Buckyestown Data Center Campus Frederick, Frederick County Less than 1 mi Proposed Rowan Digital Infrastructure 300 MW
Atmosphere Data Centers Dickerson Generating Station Campus Dickerson, Montgomery County 8 mi Proposed Atmosphere Data Centers 300 MW
Atlantech Online Rockville Data Center Rockville, Montgomery County 24 mi Running Atlantech Online 4 MW
Centersquare Silver Spring Data Center (DCA1 / Prosperity Drive) Silver Spring, Montgomery County 33 mi Running Centersquare 16 MW
Atlantech Online Silver Spring Data Center Silver Spring, Montgomery County 33 mi Running Atlantech Online 3 MW

Blank cell: not disclosed by any source on file.

Common questions about Aligned Data Centers Frederick Campus (IAD-04)

Answered directly from the verified filings and local actions on this page.

Who is building Aligned Data Centers Frederick Campus (IAD-04)?

Aligned Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does Aligned Data Centers Frederick Campus (IAD-04) say it needs?

Power: 108 MW (the developer's figure, aligneddc.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Aligned Data Centers Frederick Campus (IAD-04) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Aligned Data Centers: Data center locations (opens in a new tab), Aligned Data Centers, September 14, 2026
  2. Aligned Data Centers: Aligned IAD-04 (opens in a new tab), Aligned Data Centers, September 14, 2026
  3. EPA ECHO detailed facility report: Aligned Data Centers (MD) Propco, LLC, Frederick MD Data Center Campus (opens in a new tab), U.S. Environmental Protection Agency

3 sources on file.

Regional grid context

This site is in the RFC East (RFCE) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Aligned Data Centers Frederick Campus (IAD-04)", https://datacenterrecord.org/projects/aligned-iad-04-frederick-md, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Aligned Data Centers Frederick Campus (IAD-04)", https://datacenterrecord.org/projects/aligned-iad-04-frederick-md. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
39.3285, -77.4692
How the location is known
Location from the site's street address.
Location source
https://aligneddc.com/maryland-data-centers/
Coordinate source
EPA FRS 3601815368 / Aligned IAD-04 specification
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
108 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Aligned Data Centers Frederick Campus (IAD-04) · 3 sources, 1 entry · basis and source tier on every row · verified October 27, 2026