Data Center Record.

Proposed Built from one source

Atmosphere Dickerson data center

Montgomery County, MDDeveloper: Atmosphere Data CentersCensus GEOID 24031

Stage
Proposed
Undisclosed in public filings
Power, Land, Buildings, Water

A 300 megawatt data center campus proposed by Atmosphere Data Centers at the former Dickerson coal plant in Montgomery County, Maryland. It is reported, since July 21, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 2 sources, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 10 other published records in Maryland
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Who leads it
Atmosphere Data Centers as stated by the source
Undisclosed in public filings
Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Atmosphere Data Centers as stated by the source September 8, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Montgomery County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Montgomery County closed Montgomery County, Maryland approved 18 month pause on data center reviews in July 2026 commercialobserver.com (opens in a new tab)
Montgomery County closed Judge ruled that Preserve Montgomery County can continue to pursue claims that the county did not adequately inform the community about data centers komu.com (opens in a new tab)
Montgomery County closed Montgomery County Council extended its data center pause from six months to 18 months marylandmatters.org (opens in a new tab)
Montgomery County closed The vote passed unanimously nbcwashington.com (opens in a new tab)
Montgomery County closed Montgomery County Council voted unanimously on July 28, 2026 for an 18 month moratorium on new data centers of 25 megawatts or more, the threshold as reported by Bisnow nbcwashington.com (opens in a new tab)

What happened

  1. Moratorium (content date)

    Atmosphere Data Centers withdrew its appeal of zoning interpretation related to the moratorium

    [2] wtop.com

  2. · Status: rumored Moratorium (content date)

    Atmosphere Data Centers challenged the six month data center moratorium in Montgomery County

    [1] datacenterdynamics.com

The full Atmosphere Dickerson data center timeline, in order

6 corrections to this record

Every correction, with its reason
  1. · the city of a projects row

    Dickerson is an unincorporated community and not a Census place, so the record files at the county level in Montgomery County. On the editor's word of October 16, 2026. The old and new text.

  2. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change. The day's label corrections.

  3. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change. The day's label corrections.

  4. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives datacenterdynamics.com. The link did not change. The day's label corrections.

  5. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives wtop.com. The link did not change. The day's label corrections.

  6. · the summary of a status history row

    The writing rule (DECISIONS section 12): no hyphenated compound in record prose. The compound is written as separate words; the fact is unchanged (September 14, 2026). The old and new text.

Every correction on the record is on the corrections page.

The site

Where in Montgomery County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

The site map is at the top of the page.

Where
Montgomery County, Maryland
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Atmosphere Dickerson data center?

Atmosphere Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does Atmosphere Dickerson data center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Atmosphere Dickerson data center stand today?

It is reported, since July 21, 2026. The newest entry, August 30, 2026: Atmosphere Data Centers withdrew its appeal of zoning interpretation related to the moratorium [2].

What has Montgomery County decided about it?

Montgomery County (rated closed): Montgomery County, Maryland approved 18 month pause on data center reviews in July 2026 (reported September 23, 2026, commercialobserver.com (opens in a new tab)); and Montgomery County: Judge ruled that Preserve Montgomery County can continue to pursue claims that the county did not adequately inform the community about data centers (reported September 20, 2026, komu.com (opens in a new tab)). 5 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Atmosphere Data Centers challenges six-month data center moratorium in Montgomery, Maryland (opens in a new tab), Data Center Dynamics, July 21, 2026, trade press
  2. Atmosphere Data Centers scraps challenge to Montgomery Co. executive’s permitting moratorium (opens in a new tab), WTOP News, August 30, 2026, local outlet

2 sources on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Atmosphere Dickerson data center", https://datacenterrecord.org/projects/atmosphere-dickerson-data-center-md, last verified September 8, 2026. CSV · JSON
Cite this page

Data Center Record, "Atmosphere Dickerson data center", https://datacenterrecord.org/projects/atmosphere-dickerson-data-center-md. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
39.084, -77.15276
How the location is known
Location is the county seat; exact site not disclosed.
Location source
County seat (Rockville), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location last verified
September 23, 2026
Rating of the county's rows
Closed
Published
September 8, 2026
Last verified
September 8, 2026
Undisclosed in public filings
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed

Researcher view · Atmosphere Dickerson data center · 2 sources, 2 entries, 5 decisions nearby · basis and source tier on every row · verified September 8, 2026

Download CSV JSON