Data Center Record.

Reported Built from one source

Burgin Data Center

Residents of Burgin spoke out on a proposed data center development. It is reported, as reported September 7, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 4 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
Not disclosed
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Not disclosed
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind itA land record, a zoning application or a company's own announcement.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Mercer County and Burgin about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Mercer County Public comment hearing on data center ordinance drew vocal opposition from residents concerned about farmland, water supply, and emergency response capacity. spectrumnews1.com
Mercer County Commission will meet again July 30 at 5 p.m. at Campbellsville University Harrodsburg Athletic Center to respond to community comments. spectrumnews1.com
Mercer County Mercer County Joint Planning and Zoning Commission considers ordinance requiring data centers outside Harrodsburg city limits be built near E.W. Brown power plant and placing 1,500 acre cap on data center zoning across county. spectrumnews1.com
Mercer County Mercer County data center ordinance advances fox56news.com

What happened

  1. (source date; the content gives no date of its own)

    City attempted to annex more than 1,000 acres in July, which was declared null and void [1]

  2. (source date; the content gives no date of its own)

    Adjusted boundary lines mean the process restarts Tuesday [3]

  3. (source date; the content gives no date of its own)

    Last month, the city's attempt to annex more than 1,000 acres was declared null and void [3]

  4. · Status: rumored (source date; the content gives no date of its own)

    City of Burgin attempted to annex more than 1,000 acres for developer Panattoni Data Centers [3]

The full Burgin Data Center timeline, in order

1 correction to this record

Every correction, with its reason
  1. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

Every correction on the record is on the corrections page.

What was said

More than 100 residents attended Burgin city council meeting with concerns about noise, water contamination, road deterioration, and tax increases related to data center project.
Burgin residents · September 9, 2026 · paraphrased · WKYT local outlet
Governor Andy Beshear said that if data centers are going to locate in Kentucky, the area is going to choose to want them
Andy Beshear, Governor of Kentucky · September 7, 2026 · paraphrased · WKYT local outlet

Every statement about data centers in Kentucky, by speaker

The site

Where in Mercer County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 5 other published records in Kentucky
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Burgin, Mercer County, Kentucky
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Burgin Data Center?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does Burgin Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Burgin Data Center stand today?

It is reported, as reported September 7, 2026. The newest entry, reported September 9, 2026: City attempted to annex more than 1,000 acres in July, which was declared null and void [1].

What has Burgin or Mercer County decided about it?

Mercer County: Public comment hearing on data center ordinance drew vocal opposition from residents concerned about farmland, water supply, and emergency response capacity. (reported August 17, 2026, source); and Mercer County: Commission will meet again July 30 at 5 p.m. at Campbellsville University Harrodsburg Athletic Center to respond to community comments. (reported August 17, 2026, source). 4 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Burgin City Council votes to take next step on joining planning commission amid data center debate - LEX 18 News, LEX 18 News, September 9, 2026, local outlet
  2. Burgin residents speak out on proposed data center development - spectrumnews1.com, spectrumnews1.com, August 13, 2026, local outlet
  3. Tension builds over data center project in Burgin - WKYT, WKYT, September 7, 2026, local outlet
  4. A Mercer County city wants to annex land for a potential data center. Another city has concerns. - Kentucky Lantern, Kentucky Lantern, July 20, 2026, local outlet

4 sources on file.

Cite this record

Data Center Record, "Burgin Data Center", https://datacenterrecord.org/projects/burgin-data-center-ky, last verified September 17, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "Burgin Data Center", https://datacenterrecord.org/projects/burgin-data-center-ky. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
burgin-data-center-ky
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/ky/mercer-county/burgin
Coordinates
37.7639, -84.8461
Location precision
county
Location source
County seat (Harrodsburg), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-05
Last verified
2026-09-17