A proposed data center in west Louisville was placed on hold during a zoning review. It is reported; the record holds no sourced date for when it reached that stage.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 2 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Reported by others: 154 acres (Yahoo). Their figure, not the record's.
Water
Not disclosed
Who leads it
Not disclosed
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Not disclosed
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

How much power it needs, also reported: 154 acres, 2026 (Yahoo: Proposed hyperscale data center campus on Camp Ground Road, Louisville, by PowerHouse Data Centers and Poe Companies, approximately 154 acres, 1.8 million square feet, hundreds of megawatts capacity) .

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind itA land record, a zoning application or a company's own announcement.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Jefferson County and Louisville about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Louisville Louisville Planning Commission recommended rules prohibiting future hyperscale data centers yahoo.com
Louisville The Planning and Zoning Committee is scheduled to meet again in two weeks lpm.org
Louisville Planning Commission recommended requiring rezoning for most data center projects to allow scrutiny by Planning Commission and Metro Council with public comment opportunities lpm.org
Louisville Planning Commission recommended requiring data centers to use closed loop cooling systems that utilize less water lpm.org
Louisville Any new data centers would need to be at least a quarter mile from nearby schools, community centers and other data centers lpm.org
Louisville Planning Commission recommendations include a ban on data centers with more than 500,000 square feet of equipment lpm.org
5 earlier decisions on the county's rows
DateWhoDecisionSource
Louisville There is currently a moratorium on new data center approvals in Jefferson County until February or whenever Metro Council passes new regulations lpm.org
Louisville Louisville Metro Council debated proposed regulations for data center construction for the first time Tuesday during its Planning and Zoning Committee meeting lpm.org
Louisville Louisville Planning Commission recommended stricter data center regulations lpm.org
Louisville Louisville advanced stricter data center rules courier-journal.com
Louisville Louisville mayor signs 6 month moratorium on new data center projects on 2026-08-14 wdrb.com

What happened

No dated entry is on the record yet.

1 correction to this record

Every correction, with its reason
  1. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

Every correction on the record is on the corrections page.

What was said

District 3 Council Member Shameka Parrish Wright agreed with Hawkins in opposing data center development
Shameka Parrish-Wright, District 3 Council Member · September 15, 2026 · paraphrased · Louisville Public Media local outlet
District 1 Council Member Tammy Hawkins expressed concerns about the potential environmental and health impacts of data centers, particularly for her West End constituents where a hyperscale data center is already being built
Tammy Hawkins, District 1 Council Member · September 15, 2026 · paraphrased · Louisville Public Media local outlet

Every statement about data centers in Kentucky, by speaker

1 more statement on this page

Kentucky governor

Beshear said that any data center in Kentucky would have to pay for all of its own power

June 1, 2026, lexingtonky.news · lexingtonky.news local outlet · the record (Paraphrased; content date; reported from elsewhere)

The site

Where in Jefferson County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 5 other published records in Kentucky
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Louisville, Jefferson County, Kentucky
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.

Capacity at full buildout

1 figure, 1 source
154 acresReported

Yahoo, Sep 18, 2026

Show each source's words
  • 154 acres, Yahoo: Proposed hyperscale data center campus on Camp Ground Road, Louisville, by PowerHouse Data Centers and Poe Companies, approximately 154 acres, 1.8 million square feet, hundreds of megawatts capacity

Questions about this project

7 questions answered from the record

Answered from the rows on this page.

How big is West Louisville Data Center?

Not disclosed. No source on file gives its capacity, its acreage or a count of buildings. What the record holds instead is under Disclosed.

Who is building West Louisville Data Center?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

Who will use West Louisville Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does West Louisville Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does West Louisville Data Center stand today?

It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Louisville or Jefferson County decided about it?

Louisville: Louisville Planning Commission recommended rules prohibiting future hyperscale data centers (reported September 18, 2026, source); and Louisville: The Planning and Zoning Committee is scheduled to meet again in two weeks (reported September 15, 2026, source). 11 events are on the county's rows; a rule about the area is not a decision about this record.

What is still unknown about West Louisville Data Center?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is building it, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. PowerHouse and Poe target another 550-acre data center campus outside Louisville, Kentucky, www.datacenterdynamics.com, August 17, 2026, trade press
  2. Proposed west Louisville data center on hold during zoning review - Spectrum News, Spectrum News, August 14, 2026, local outlet

2 sources on file.

Cite this record

Data Center Record, "West Louisville Data Center", https://datacenterrecord.org/projects/west-louisville-data-center-ky, last verified September 17, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "West Louisville Data Center", https://datacenterrecord.org/projects/west-louisville-data-center-ky. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
west-louisville-data-center-ky
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/ky/jefferson-county/louisville
Coordinates
38.25611, -85.75139
Location precision
county
Location source
County seat (Louisville), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-05
Last verified
2026-09-17