Data Center Record.
Census GEOID: 22079 Location Precision: parish centroid Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and 7 reporting sources

● Proposed Campus Announced May 27, 2026 · Applied Digital

Delta Forge 1

Street address 5941 La Hwy 121, Boyce, LA 70000, Rapides Parish parish centroid Parish level, the parish seat [1] County seat (Alexandria), Wikidata, placed at county level

Overview, regulatory gates and specifications

Applied Digital is constructing a 300 acre, $3.6 billion data center campus called Delta Forge 1 in Boyce, Louisiana, with 300 MW in its first phase and initial operations expected as soon as mid 2027. [5] Applied Digital building $3.6 billion Data Forge 1 data center near Boyce [5]

Verified Site & Permit Summary
Verified address
5941 La Hwy 121, Boyce, LA 70000, Rapides Parish parish centroid
Operator / developer
Applied Digital
Permit / registry ID
thetowntalk.com on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Applied Digital as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Humans First

activist group

DID Recorded statement at KALB | News Channel 5 (September 14, 2026)
SAID Humans First is conducting a cross country bus tour with 34 stops across the nation demanding stronger guardrails on data center development. (September 14, 2026) kalb.com (opens in a new tab)

Gary Musgrove

Save My Louisiana representative

DID Recorded statement at KALB | News Channel 5 (September 14, 2026)
SAID Gary Musgrove, a Save My Louisiana representative, stated that community concerns about data centers remain unanswered by politicians and local officials. (September 14, 2026) kalb.com (opens in a new tab)

Amy Kremer

Chair of Humans First

DID Recorded statement at thetowntalk.com (September 13, 2026) [5]
SAID Humans First, conservative group, touring nation to advocate for local control over AI data center construction (September 13, 2026) [5]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Applied Digital
UTILITIES
Electric utility: Not disclosed

View all 4 statements on the record in Louisiana →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Delta Forge 1.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 300 MW Disclosed filing [5] thetowntalk.com
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Meta building Hyperion data center approximately 30 miles east of Monroe in Richland Parish

    [5] thetowntalk.com

  2. (source date; the content gives no date of its own)

    Applied Digital building $3.6 billion Data Forge 1 data center near Boyce

    [5] thetowntalk.com

  3. · Status: proposed (content date)

    Cleco Power announced an agreement to supply electricity to the proposed Delta Forge 1 data center in Boyce, Rapides Parish, Louisiana.

    [2] rapidesparishjournal.com

Every event in order

10 corrections to this record

Every correction, with its reason
  1. · Timeline entry

    Normalize vote tallies ('X to Y') and dollar figures ('$X million/billion') to house style.

  2. · County (Rapides to Rapides Parish)

    Louisiana's county equivalents are parishes, as the Census Bureau names them; the record stored Rapides, which the pages printed as Rapides County, and its page sat apart from the parish's own.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Louisiana

Nearest records are not computed for a record placed at a parish seat. Browse all data centers in Louisiana.

Common questions about Delta Forge 1

Answered directly from the verified filings and local actions on this page.

Who is building Delta Forge 1?

Applied Digital is the developer. No construction contractor is named on the record yet.

How much power and water does Delta Forge 1 say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Delta Forge 1 stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO detailed facility report: Beard Construction Group LLC, Applied Digital (opens in a new tab), U.S. Environmental Protection Agency

Reporting

  1. Cleco to power planned Rapides Parish data center - Rapides Parish Journal (opens in a new tab), Rapides Parish Journal, May 27, 2026, news outlet
  2. Applied Digital secures customer for new 210MW data center campus - Data Center Dynamics (opens in a new tab), Data Center Dynamics, June 9, 2026, news outlet
  3. Cleco to power data center coming to Rapides Parish - KALB | News Channel 5 (opens in a new tab), KALB | News Channel 5, May 27, 2026, local outlet
  4. Citizens 'have no seat at the table' on data centers, says organizer - thetowntalk.com (opens in a new tab), thetowntalk.com, September 13, 2026, news outlet
  5. NDAs are hiding data center deals, drawing ire from locals — and attention from lawmakers - Oregon Public Broadcasting - OPB (opens in a new tab), OPB (via Google News), August 27, 2026, local outlet
  6. NDAs are hiding data center deals, drawing ire from locals — and attention from lawmakers - NPR (opens in a new tab), NPR, August 27, 2026, national outlet
  7. Developer of Delta data center announces ‘revolutionary’ tech to turn natural gas into water - News From The States (opens in a new tab), News From The States, September 9, 2026, national outlet

8 sources on file.

Regional grid context

This site is in the SERC Mississippi Valley (SRMV) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Delta Forge 1", https://datacenterrecord.org/projects/delta-forge-1-boyce-la, last verified October 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Delta Forge 1", https://datacenterrecord.org/projects/delta-forge-1-boyce-la. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
31.31125, -92.44519
How the location is known
Location is the parish seat; exact site not disclosed.
Location source
Parish seat (Alexandria), Wikidata, placed at parish level
Coordinate source
wikidata parish seat
Location last verified
September 16, 2026
Capacity, if disclosed
300 MW, not disclosed
Published
September 5, 2026
Last verified
October 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the parish's rows

Researcher view · Delta Forge 1 · 8 sources, 3 entries · basis and source tier on every row · verified October 6, 2026

Download CSV JSON