● Proposed Campus Recorded July 21, 2026 · 2 Buildings

Amentum / DC Blox Savannah River AI Data Center

Street address Savannah River Site, Highway 278, Aiken, SC 29808, Aiken County assessor parcel Exact, on the parcel [2] neimagazine.com

Overview, regulatory gates and specifications

The United States Department of Energy selected Amentum and DC Blox to develop a 1,000 megawatt AI data center campus at the federal Savannah River Site in Aiken County, South Carolina. [2] Filings on the record specify disclosed capacity of 1 GW (the developer's figure), 2 planned or operational buildings. [2] The Department of Energy selected Amentum and DC Blox to develop a behind the meter AI data center at the Savannah River site in Aiken County, South Carolina. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
1 GW disclosed
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand [2]
1 GW
the developer's figure

Equivalent to ~830,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 48% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
2 buildings
zoning application

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: Savannah River Site, Highway 278, Aiken, SC 29808.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
1 GW developer figure Equivalent to the continuous electricity demand of about 830,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data, or about 0.5 times the 2,080 MW generating capacity of Hoover Dam. About 10 percent of New York City's summer peak demand in 2024.
[2] neimagazine.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[2] neimagazine.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Amentum / DC Blox as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Amentum / DC Blox Savannah River AI Data Center, capacity: 1,000 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 1,000 ÷ 10,245 = 0.1 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Amentum / DC Blox
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Amentum / DC Blox Savannah River AI Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 1 GW the developer's figure [2] neimagazine.com
Site Footprint (Acres)
Data Hall Buildings 2 buildings zoning application [2] neimagazine.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: approved (content date)

    The Department of Energy selected Amentum and DC Blox to develop a behind the meter AI data center at the Savannah River site in Aiken County, South Carolina.

    [2] neimagazine.com

Every event in order

1 correction to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in South Carolina

Verified data center records in South Carolina within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Meta Aiken Data Center Aiken, Aiken County 1 mi Running Meta 150 MW
Aiken 5 MW Data Center Aiken, Aiken County 1 mi Running Aiken Electric Cooperative / Sage Mill Data Center 5 MW
DartPoints Columbia Data Center (CAE1) Columbia, Richland County 50 mi Running DartPoints 4 MW

Blank cell: not disclosed by any source on file.

Common questions about Amentum / DC Blox Savannah River AI Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Amentum / DC Blox Savannah River AI Data Center?

Amentum / DC Blox is the developer. No construction contractor is named on the record yet.

How much power and water does Amentum / DC Blox Savannah River AI Data Center say it needs?

Power: 1 GW (the developer's figure, neimagazine.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Amentum / DC Blox Savannah River AI Data Center stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. DOE selects Amentum, DC Blox to develop behind-the-meter AI data center at Savannah River site in South Carolina - Data Center Dynamics (opens in a new tab), Data Center Dynamics, July 21, 2026, trade press
  2. Amentum to develop SRS AI campus (opens in a new tab), www.neimagazine.com, August 17, 2026, news outlet

2 sources on file.

Regional grid context

This site is in the SERC Virginia and Carolina South (SRVC-S) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Amentum / DC Blox Savannah River AI Data Center", https://datacenterrecord.org/projects/amentum-dc-blox-savannah-river-ai-data-center-aiken-sc, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Amentum / DC Blox Savannah River AI Data Center", https://datacenterrecord.org/projects/amentum-dc-blox-savannah-river-ai-data-center-aiken-sc. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
33.54944, -81.72056
How the location is known
Location from the county parcel record.
Location source
https://www.energy.gov/
Coordinate source
US Department of Energy Savannah River Site AI campus selection announcement
Location last verified
September 16, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
1 GW, the developer's figure
Published
September 5, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Amentum / DC Blox Savannah River AI Data Center · 2 sources, 1 entry · basis and source tier on every row · verified November 6, 2026