Project Hazelnut
NorthPoint Development proposes 15 data center buildings, a substation, a switchyard and four ancillary buildings on a 1,282 acre campus north of Humboldt Industrial Park North in Hazle Township, Luzerne County. The township supervisors denied its land development plan. It is waiting on permits, since November 10, 2025.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened. An offer to the community is shown as its source states it, with its condition, and never added to another.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Land
- 1,282 acres
- the developer's figure [2]
- Power it would draw
- Not disclosed
- Water
- Not disclosed
- Who leads it
- NorthPoint Development
- as stated by the source [2]
- Who would use it
- Not disclosed
- Jobs once it runs
- Not disclosed
- Tax each year
- Not disclosed
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | NorthPoint Development | as stated by the source | [2] projecthazelnut.com | September 29, 2026 |
| Who is constructing it | Not disclosed | |||
| How much land | 1,282 acres | the developer's figure | [2] projecthazelnut.com | September 29, 2026 |
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
Jobs once it runs, also reported: 900 jobs, 2026 (NorthPoint Development: Project Hazelnut would create over 900 permanent operational jobs) .
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water useA state water right filing or a water supply agreement.
- Who would use itA lease announcement or a tenant named in a filing.
- Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.
What was decided
Acts of Luzerne County and Hazle Township about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Luzerne County | Plains Township to host hearing on AI data center zoning map changes to accommodate data centers on September 22 in Luzerne County | paenvironmentdaily.blogspot.com | |
| Salem Township | Planning Commission voted Thursday to recommend township supervisors approve expansion of data center overlay district for third project despite court stay order | thecentersquare.com | |
| Salem Township | Salem Township Board of Supervisors scheduled to meet Wednesday to decide on data center overlay zone expansion | timesleader.com |
What happened
-
· Status: permitting (content date)
NorthPoint Development's preliminary and final major land development plan for Project Hazelnut, 15 data center buildings with ancillary buildings, parking, utilities, landscaping and stormwater on a 1,282 acre industrial technology campus north of Humboldt Industrial Park North, was before the Hazle Township Board of Supervisors on November 10, 2025, which tabled it. [3]
The site
Where in Hazle Township is not in the public record. The pin marks the center of Hazle Township, not a building, and the outline is Luzerne County.
Tap a pin for the data center, the parcel for its record
- This record: Proposed, ringed
- data center
- Dashed edge: the exact site is not in the public record
- Smaller pins: 19 other published records in Pennsylvania
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
- Where
- Hazle Township, Luzerne County, Pennsylvania
- How exactly it is located
- Town level, the center of the city
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Nearest records are not computed for a record placed at the center of its town.
Comparisons
2 metrics with more than one figure
Construction jobs
1 figure, 1 sourceShow each source's words
- 1,300 construction jobs, NorthPoint Development: Project Hazelnut would create more than 1,300 construction jobs over a six year development period
Permanent jobs
1 figure, 1 sourceShow each source's words
- 900 jobs, NorthPoint Development: Project Hazelnut would create over 900 permanent operational jobs
What the developer has offered
3 offers, from NorthPoint Development
-
Payment to a government offered
NorthPoint Development offers Hazle Township $105 million over 15 years, $7 million a year, to support a township police force and lower the trash collection fees residents pay. [1]
- Offered by
- NorthPoint Development
- To
- “Hazle Township”
- Amount
- $7 million a year for 15 years, $105 million in all
- On what condition
- “as part of its revised proposal for Project Hazelnut”, in the source's words
- Date
- June 24, 2026
Kind government_payment, recipients municipality, condition other, status offered, date basis: content date; the amount in the source's words: “$105 Million Long-Term Township Investment: A 15-year commitment of $7 million per year in funding for Hazle Township”.
-
Community fund offered
NorthPoint Development offers a $15 million community support fund for workforce development, educational training, arts and recreation, and youth programs, to benefit local institutions such as the community college and the YMCA. [1]
- Offered by
- NorthPoint Development
- To
- “local institutions such as the community college, the YMCA, and other organizations that serve Township residents”
- Amount
- $15 million in all
- On what condition
- “as part of its revised proposal for Project Hazelnut”, in the source's words
- Date
- June 24, 2026
Kind community_fund, recipients other, condition other, status offered, date basis: content date; the amount in the source's words: “$15 Million Community Support Fund”.
-
Payment to each household offered
NorthPoint Development offers a $10,000 grant to every eligible household in Hazle Township from a $45 million resident grant fund, paid upon the issuance of the certificate of occupancy for the first Project Hazelnut building, which it anticipates in late 2027. [1]
- Offered by
- NorthPoint Development
- To
- “Every eligible household in Hazle Township”
- Amount
- $10,000 each, $45 million in all
- On what condition
- “paid upon the issuance of the certificate of occupancy for the first Project Hazelnut building”, in the source's words
- Date
- June 24, 2026
Kind household_payment, recipients households, condition certificate_of_occupancy, status offered, date basis: content date; the amount in the source's words: “$45 Million Resident Grant Fund: Every eligible household in Hazle Township will receive a $10,000 grant”.
Questions about this project
8 questions answered from the record
How big is Project Hazelnut?
-
The record has one measure of its size: 1,282 acres (the developer's figure, source). Its power capacity is not disclosed.
Who is building Project Hazelnut?
-
NorthPoint Development is the developer, source. No construction contractor is named on the record yet.
Who will use Project Hazelnut?
-
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
What has been offered to the community around Project Hazelnut?
-
Payment to a government from NorthPoint Development: $7 million a year for 15 years, $105 million in all, to “Hazle Township”, on the condition “as part of its revised proposal for Project Hazelnut” (offered), source; Community fund from NorthPoint Development: $15 million in all, to “local institutions such as the community college, the YMCA, and other organizations that serve Township residents”, on the condition “as part of its revised proposal for Project Hazelnut” (offered), source; and Payment to each household from NorthPoint Development: $10,000 each, $45 million in all, to “Every eligible household in Hazle Township”, on the condition “paid upon the issuance of the certificate of occupancy for the first Project Hazelnut building” (offered), source. Each is shown with its condition under What the developer has offered.
How much power and water does Project Hazelnut say it needs?
-
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Where does Project Hazelnut stand today?
-
It is waiting on permits, since November 10, 2025. The newest entry, November 10, 2025: NorthPoint Development's preliminary and final major land development plan for Project Hazelnut, 15 data center buildings with ancillary buildings, parking, utilities, landscaping and stormwater on a 1,282 acre industrial technology campus north of Humboldt Industrial Park North, was before the Hazle Township Board of Supervisors on November 10, 2025, which tabled it. [3]
What has Hazle Township or Luzerne County decided about it?
-
Luzerne County: Plains Township to host hearing on AI data center zoning map changes to accommodate data centers on September 22 in Luzerne County (reported September 17, 2026, source); and Salem Township (rated closed): Planning Commission voted Thursday to recommend township supervisors approve expansion of data center overlay district for third project despite court stay order (reported September 1, 2026, source). 3 events are on the county's rows; a rule about the area is not a decision about this record.
What is still unknown about Project Hazelnut?
-
Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
Sources
Primary documents
- NorthPoint Development Enhances Historic $165 Million Community Benefits Commitment for Project Hazelnut, Aligning with GRID Standards, NorthPoint Development, June 24, 2026
- Project Hazelnut, NorthPoint Development
- Hazle Township Board of Supervisors, meeting minutes, October to December 2025, Hazle Township
- Hazle Township Board of Supervisors, meeting minutes, June to August 2026, Hazle Township
Reporting
- A developer offered every household in a Pennsylvania town $10,000 for a data center, and many still said no, TechSpot, September 28, 2026, local outlet
- AI Data Center Developer Promises $10K Checks To Residents, Locals Call It A Bribe, HotHardware, September 28, 2026, local outlet
- Data center developer offers $10,000 checks to 4,500 households if the 1,300-acre facility is approved — locals push back over noise and 'bribe' concerns, Tom's Hardware, September 28, 2026, local outlet
- Everyone in a Pennsylvania town gets $10K if data center is built – but they’re still pushing back: report, New York Post, September 28, 2026, local outlet
8 sources on file.
Cite this record
Data Center Record, "Project Hazelnut", https://datacenterrecord.org/projects/project-hazelnut-hazle-township-pa, last verified September 29, 2026.
Cite this page
Data Center Record, "Project Hazelnut", https://datacenterrecord.org/projects/project-hazelnut-hazle-township-pa. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Slug
- project-hazelnut-hazle-township-pa
- Status value
- permitting
- Stage
- Proposed
- Tier
- skeleton
- Tags
- skeleton
- Place id
- us/pa/luzerne-county/hazle-township
- Coordinates
- 40.9584859, -76.0140621
- Location precision
- city
- Location source
- Census Bureau TIGERweb, the internal point of Hazle township (county subdivision 4207933376); no source gives the site
- Coordinate source
- census tigerweb county subdivision internal point
- Location source number
- Not disclosed
- Location last verified
- September 28, 2026
- EPA registry id
- Not disclosed
- Use type values
- not_disclosed
- Tenancy value
- not_disclosed
- Cooling type value
- not_disclosed
- Capacity basis
- not_disclosed
- Water basis
- not_disclosed, gallons_per_day
- Acreage basis
- developer_estimate
- Interconnection value
- not_disclosed
- Capacity, if disclosed
- Not disclosed
- Rating of the county's rows
- Closed
- Published
- 2026-09-28
- Last verified
- 2026-09-29