Project Hazelnut

NorthPoint Development proposes 15 data center buildings, a substation, a switchyard and four ancillary buildings on a 1,282 acre campus north of Humboldt Industrial Park North in Hazle Township, Luzerne County. The township supervisors denied its land development plan. It is waiting on permits, since November 10, 2025.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 8 sources, 4 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened. An offer to the community is shown as its source states it, with its condition, and never added to another.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
1,282 acres
the developer's figure [2]
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
NorthPoint Development
as stated by the source [2]
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it NorthPoint Development as stated by the source [2] projecthazelnut.com September 29, 2026
Who is constructing it Not disclosed
How much land 1,282 acres the developer's figure [2] projecthazelnut.com September 29, 2026
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

Jobs once it runs, also reported: 900 jobs, 2026 (NorthPoint Development: Project Hazelnut would create over 900 permanent operational jobs) .

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Luzerne County and Hazle Township about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Luzerne County Plains Township to host hearing on AI data center zoning map changes to accommodate data centers on September 22 in Luzerne County paenvironmentdaily.blogspot.com
Salem Township closed Planning Commission voted Thursday to recommend township supervisors approve expansion of data center overlay district for third project despite court stay order thecentersquare.com
Salem Township closed Salem Township Board of Supervisors scheduled to meet Wednesday to decide on data center overlay zone expansion timesleader.com

What happened

  1. · Status: permitting (content date)

    NorthPoint Development's preliminary and final major land development plan for Project Hazelnut, 15 data center buildings with ancillary buildings, parking, utilities, landscaping and stormwater on a 1,282 acre industrial technology campus north of Humboldt Industrial Park North, was before the Hazle Township Board of Supervisors on November 10, 2025, which tabled it. [3]

The full Project Hazelnut timeline, in order

The site

Where in Hazle Township is not in the public record. The pin marks the center of Hazle Township, not a building, and the outline is Luzerne County.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 19 other published records in Pennsylvania
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Hazle Township, Luzerne County, Pennsylvania
How exactly it is located
Town level, the center of the city
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at the center of its town.

Comparisons

2 metrics with more than one figure

Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.

Construction jobs

1 figure, 1 source
1,300 construction jobsDocument's figure

NorthPoint Development, Jun 24, 2026

Show each source's words
  • 1,300 construction jobs, NorthPoint Development: Project Hazelnut would create more than 1,300 construction jobs over a six year development period

Permanent jobs

1 figure, 1 source
Show each source's words
  • 900 jobs, NorthPoint Development: Project Hazelnut would create over 900 permanent operational jobs

What the developer has offered

3 offers, from NorthPoint Development

What the companies behind this project have offered or agreed to give the people and governments around the site, newest first. How offers are recorded.

  1. Payment to a government offered

    NorthPoint Development offers Hazle Township $105 million over 15 years, $7 million a year, to support a township police force and lower the trash collection fees residents pay. [1]

    Offered by
    NorthPoint Development
    To
    “Hazle Township”
    Amount
    $7 million a year for 15 years, $105 million in all
    On what condition
    “as part of its revised proposal for Project Hazelnut”, in the source's words
    Date
    June 24, 2026

    Kind government_payment, recipients municipality, condition other, status offered, date basis: content date; the amount in the source's words: “$105 Million Long-Term Township Investment: A 15-year commitment of $7 million per year in funding for Hazle Township”.

  2. Community fund offered

    NorthPoint Development offers a $15 million community support fund for workforce development, educational training, arts and recreation, and youth programs, to benefit local institutions such as the community college and the YMCA. [1]

    Offered by
    NorthPoint Development
    To
    “local institutions such as the community college, the YMCA, and other organizations that serve Township residents”
    Amount
    $15 million in all
    On what condition
    “as part of its revised proposal for Project Hazelnut”, in the source's words
    Date
    June 24, 2026

    Kind community_fund, recipients other, condition other, status offered, date basis: content date; the amount in the source's words: “$15 Million Community Support Fund”.

  3. Payment to each household offered

    NorthPoint Development offers a $10,000 grant to every eligible household in Hazle Township from a $45 million resident grant fund, paid upon the issuance of the certificate of occupancy for the first Project Hazelnut building, which it anticipates in late 2027. [1]

    Offered by
    NorthPoint Development
    To
    “Every eligible household in Hazle Township”
    Amount
    $10,000 each, $45 million in all
    On what condition
    “paid upon the issuance of the certificate of occupancy for the first Project Hazelnut building”, in the source's words
    Date
    June 24, 2026

    Kind household_payment, recipients households, condition certificate_of_occupancy, status offered, date basis: content date; the amount in the source's words: “$45 Million Resident Grant Fund: Every eligible household in Hazle Township will receive a $10,000 grant”.

Questions about this project

8 questions answered from the record

Answered from the rows on this page.

How big is Project Hazelnut?

The record has one measure of its size: 1,282 acres (the developer's figure, source). Its power capacity is not disclosed.

Who is building Project Hazelnut?

NorthPoint Development is the developer, source. No construction contractor is named on the record yet.

Who will use Project Hazelnut?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Project Hazelnut say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

What has Hazle Township or Luzerne County decided about it?

Luzerne County: Plains Township to host hearing on AI data center zoning map changes to accommodate data centers on September 22 in Luzerne County (reported September 17, 2026, source); and Salem Township (rated closed): Planning Commission voted Thursday to recommend township supervisors approve expansion of data center overlay district for third project despite court stay order (reported September 1, 2026, source). 3 events are on the county's rows; a rule about the area is not a decision about this record.

What is still unknown about Project Hazelnut?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Cite this record

Data Center Record, "Project Hazelnut", https://datacenterrecord.org/projects/project-hazelnut-hazle-township-pa, last verified September 29, 2026.

Last verified , first recorded . Every correction is logged on the corrections page.

Cite this page

Data Center Record, "Project Hazelnut", https://datacenterrecord.org/projects/project-hazelnut-hazle-township-pa. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
project-hazelnut-hazle-township-pa
Status value
permitting
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/pa/luzerne-county/hazle-township
Coordinates
40.9584859, -76.0140621
Location precision
city
Location source
Census Bureau TIGERweb, the internal point of Hazle township (county subdivision 4207933376); no source gives the site
Coordinate source
census tigerweb county subdivision internal point
Location source number
Not disclosed
Location last verified
September 28, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
developer_estimate
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Closed
Published
2026-09-28
Last verified
2026-09-29