Google Clarksville Montgomery County Data Center Campus

Street address 1950 Dunlop Lane, Clarksville, TN 37040, Montgomery County verified address Exact, at the address datacenters.google (opens in a new tab)

Overview, regulatory gates and specifications

Google operates its three building, 150 MW hyperscale data center campus on the former Hemlock Semiconductor industrial site at 1950 Dunlop Lane in Clarksville, Montgomery County, Tennessee. [1] Google lists Google Montgomery County data center at Montgomery County, Tennessee on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
150 MW
the developer's figure

Equivalent to ~124,500 U.S. homes (U.S. EIA 830 homes/MW baseline) · 7.2% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
3 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 1950 Dunlop Lane, Clarksville, TN 37040.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
150 MW developer figure Equivalent to the continuous electricity demand of about 124,500 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 1 percent of New York City's summer peak demand in 2024.
datacenters.google (opens in a new tab)
Water usage
Not disclosed
Land area
Not disclosed
Buildings
3 buildings operator page
datacenters.google (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2019 (7 years)
Who leads it
Google as stated by the source
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Google Clarksville Montgomery County Data Center Campus, capacity: 150 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 150 ÷ 10,245 = 0.01 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Jeff Tyndall

RPC Director

DID Recorded statement at Clarksville Now (September 16, 2026)
SAID RPC Director Jeff Tyndall said data centers would only be allowed in M-1 or M-2 zones and must have approved resource plans for electric, water and sewer (September 16, 2026) clarksvillenow.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Google · Parent: Alphabet
UTILITIES
Electric utility: Not disclosed

View all 2 statements on the record in Tennessee →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Clarksville Montgomery County Data Center Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 150 MW 150 MW the developer's figure
Site Footprint (Acres)
Data Hall Buildings 3 buildings 3 operator page
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Google lists Google Montgomery County data center at Montgomery County, Tennessee on its own page of data center locations, read September 14, 2026.

    [1] datacenters.google

Nearest data centers in Tennessee

Verified data center records in Tennessee within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
RadiusDC Nashville I Data Center Nashville, Davidson County 36 mi Being built RadiusDC 12 MW
H5 Data Centers Nashville Carrier Hotel (TN01) Nashville, Davidson County 39 mi Running H5 Data Centers 6 MW
TierPoint Downtown Nashville Data Center Nashville, Davidson County 40 mi Running TierPoint 4 MW
EdgeConneX Nashville Data Center (EDCNAS01) Nashville, Davidson County 43 mi Running EdgeConneX 8 MW
DC BLOX Grassmere Nashville Zoo Parcel Data Center Proposal Nashville, Davidson County 45 mi Stalled or cancelled DC Blox 1 building
Meta Gallatin Hyperscale Data Center Campus Gallatin, Sumner County 47 mi Running Meta 4 buildings

Blank cell: not disclosed by any source on file.

Common questions about Google Clarksville Montgomery County Data Center Campus

Answered directly from the verified filings and local actions on this page.

Who is building Google Clarksville Montgomery County Data Center Campus?

Google is the developer. No construction contractor is named on the record yet.

How much power and water does Google Clarksville Montgomery County Data Center Campus say it needs?

Power: 150 MW (the developer's figure, datacenters.google (opens in a new tab)). Water: not disclosed by any source on file.

Where does Google Clarksville Montgomery County Data Center Campus stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google: Data center locations (opens in a new tab), Google, September 14, 2026

1 source on file.

Regional grid context

This site is in the SERC Tennessee Valley (SRTV) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google Clarksville Montgomery County Data Center Campus", https://datacenterrecord.org/projects/google-montgomery-county-data-center-tn, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google Clarksville Montgomery County Data Center Campus", https://datacenterrecord.org/projects/google-montgomery-county-data-center-tn. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
36.5742, -87.2685
How the location is known
Location from the site's street address.
Location source
https://datacenters.google/locations/montgomery-county-tennessee/
Coordinate source
Montgomery County Assessor / Google
Location last verified
September 16, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
150 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Google Clarksville Montgomery County Data Center Campus · 1 source, 1 entry · basis and source tier on every row · verified October 27, 2026

Download CSV JSON