A developer withdrew a data center project in Boulder City and signaled plans to move the project to federal land. [3] Filings on the record specify 1 planned or operational building. [3] The Center for Biological Diversity and local residents successfully halted the development of the proposed data center on public land near Boulder City [23]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: U.S. Route 95 and Eldorado Valley Dr, Boulder City, NV 89005.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Connected government officials, corporate entities, utilities and local rules on the public record.
Tom Gaitens, senior adviser at Humans First, calls data center development an apolitical issue where everyone drinks water, uses electricity and wants their voice heard(October 7, 2026) knpr.org (opens in a new tab)
View all 5 statements on the record in Nevada →
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Boulder City Eldorado Valley BLM Data Center Proposal.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 1 building | zoning application | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
On May 20, 2026, the Boulder City Planning Commission voted unanimously to deny an application for a controversial AI data center in Eldorado Valley after residents packed the chamber opposing desert conservation land use and Colorado River water draw.
"Agenda that brought them there, whether or not to move plans on a controversial AI data center forward, something many residents have said they don't want. Fox five's kim passoth has been following this story. She's back with us right now with more developments from tonight. Kim yeah. Tom. At tonight's meeting, the planning commission heard all of that opposition, though the vote was not unanimous. After a presentation from the developer and much public debate, they decided to deny the developer's application. I asked you guys to really"
"To the mic during public comment, speaking to the Boulder City Planning Commission. So let's set down the hammer, because absolutely everyone has said they don't want this. We'd like you to just deny it before the meeting. Those opposed also wanted to make their voices heard, taking to the streets. I think history has taught us that a lot of corporations will always put profit over people here in this community. I want to put the people first. Even this dog was dressed in a no data center shirt. When we"
"Light and that's not accurate. Our wind mostly blows from where the data center will be. Nobody wants to sit through a city council meeting. No one knows what's going on. The developer of the town site, solar two project, did make a presentation on their amended plans. After rounds of community feedback, but ultimately the commission shared their thoughts and voted against the developer's proposal. This is the hottest topic, one of the hottest topics in the country. On top of our lack of water. Regardless of how I"
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
(source date; the content gives no date of its own)
The Center for Biological Diversity and local residents successfully halted the development of the proposed data center on public land near Boulder City
(source date; the content gives no date of its own)
Skylar Opportunities LLC withdrew application for 1000 megawatt data center on 680 acres of federal land near Henderson due to city planned urban development efforts in same area
(source date; the content gives no date of its own)
The Boulder City data center permit was approved by the Bureau of Land Management after determining a previous environmental review for a solar project was sufficient, and is now on hold after an administrative judge granted a stay
(source date; the content gives no date of its own)
Townsite Solar 2 LLC asked BLM in 2025 to amend right of way grant to build data center instead of solar
· Status: stalled or cancelled (source date; the content gives no date of its own)
Townsite Solar 2 LLC received BLM approval in 2023 for solar power and battery storage facility on 88.5 acre parcel 25 miles southeast of Las Vegas
(source date; the content gives no date of its own)
Townsite Solar project, owned by Skylar Capital Management hedge fund based in Houston, originally applied for solar project but changed plans to data center
· In court (source date; the content gives no date of its own)
Townsite Solar data center project on 80 acre BLM public land in Nevada received temporary halt from Interior Board of Land Appeals stay pending environmental review and public input
(source date; the content gives no date of its own)
Planned commercial operation of Townsite Data Center in second quarter of 2028
(source date; the content gives no date of its own)
Planned Townsite Data Center construction scheduled for first quarter of 2027
· cancelled (source date; the content gives no date of its own)
Townsite Data Center has planned capacity of 167 MW backup generation
· stalled (content date)
A 167 MW data center approved on BLM public land near Boulder City was put on hold after an appeal and a stay issued by the Interior Board before construction began.
blm.gov (opens in a new tab) primary source
(source date; the content gives no date of its own)
Developer is now proposing to add a massive data center capable of demanding as much as 167 megawatts of electricity to the project
(source date; the content gives no date of its own)
BLM authorized Townsite Solar 2 to use approximately 80 acres of federal land for a 19 megawatt solar generating facility and 35 megawatt battery storage system in 2023
· cancelled (content date)
A developer withdrew a data center project in Boulder City and signaled plans to move the project to federal land.
blm.gov (opens in a new tab) primary source
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
Every correction on the record is on the corrections page.
Verified data center records in Nevada within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Google Henderson Data Center Henderson, Clark County | 8 mi | Running | 150 MW | |
| Flexential Las Vegas Pollock Data Center (LAS01 / LAS03) Las Vegas, Clark County | 16 mi | Running | Flexential | 7.4 MW |
| Switch The CORE Campus (Las Vegas) Las Vegas, Clark County | 19 mi | Running | Switch Inc. | 500 MW |
| EdgeConneX Las Vegas Data Center (LAS01) Las Vegas, Clark County | 19 mi | Running | EdgeConneX | 6 MW |
| DataBank Las Vegas Data Center (LAS1) Las Vegas, Clark County | 21 mi | Running | DataBank | 6 MW |
| Flexential North Las Vegas Data Center (LAS02) North Las Vegas, Clark County | 25 mi | Running | Flexential | 6 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Switch Inc. is the developer. No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is cancelled, as reported September 9, 2026. The newest entry, reported October 6, 2026: The Center for Biological Diversity and local residents successfully halted the development of the proposed data center on public land near Boulder City [23].
Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
23 sources on file.
This site is in the Northwest Power Pool (NWPP) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Boulder City Eldorado Valley BLM Data Center Proposal. Last verified October 26, 2026. https://datacenterrecord.org/projects/boulder-city-blm-land-data-center-nv. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Boulder City Eldorado Valley BLM Data Center Proposal
Data Center Record, "Boulder City Eldorado Valley BLM Data Center Proposal", https://datacenterrecord.org/projects/boulder-city-blm-land-data-center-nv. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.