Census GEOID: 32003 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary source

● Running First recorded September 14, 2026 · 3 Buildings

Google Henderson Data Center

Street address 301 Conestoga Way, Henderson, NV 89002, Clark County verified address Exact, at the address google.com (opens in a new tab)

Overview, regulatory gates and specifications

Google lists a data center at Henderson, Nevada among the sites it operates. [1] Filings on the record specify disclosed capacity of 150 MW (the developer's figure), 3 planned or operational buildings. [1] Google lists Google Henderson data center at Henderson, Nevada on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
150 MW
the developer's figure

Equivalent to ~124,500 U.S. homes (U.S. EIA 830 homes/MW baseline) · 7.2% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
3 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 301 Conestoga Way, Henderson, NV 89002.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
150 MW developer figure Equivalent to the continuous electricity demand of about 124,500 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 1 percent of New York City's summer peak demand in 2024.
google.com (opens in a new tab)
Water usage
Not disclosed Reported by others: 404,000,000 gallons per year (ktnv.com (opens in a new tab)). Their figure, not the record's.
Land area
Not disclosed
Buildings
3 buildings operator page
google.com (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2020 (6 years)
Who leads it
Google as stated by the source
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Google Henderson Data Center, capacity: 150 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 150 ÷ 10,245 = 0.01 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Google · Parent: Alphabet
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Henderson Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 150 MW 150 MW the developer's figure
Site Footprint (Acres)
Data Hall Buildings 3 buildings 3 operator page
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

2025 to 2026 hearings
May 20, 2026 Boulder City, NV Boulder City Planning Commission Denial of Eldorado Valley AI Data Center Boulder City Planning Commission 3 clips

On May 20, 2026, the Boulder City Planning Commission voted unanimously to deny an application for a controversial AI data center in Eldorado Valley after residents packed the chamber opposing desert conservation land use and Colorado River water draw.

  1. FOX5 Las Vegas Broadcast Report Broadcast Report transcribed from local broadcast report
    "Agenda that brought them there, whether or not to move plans on a controversial AI data center forward, something many residents have said they don't want. Fox five's kim passoth has been following this story. She's back with us right now with more developments from tonight. Kim yeah. Tom. At tonight's meeting, the planning commission heard all of that opposition, though the vote was not unanimous. After a presentation from the developer and much public debate, they decided to deny the developer's application. I asked you guys to really"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "To the mic during public comment, speaking to the Boulder City Planning Commission. So let's set down the hammer, because absolutely everyone has said they don't want this. We'd like you to just deny it before the meeting. Those opposed also wanted to make their voices heard, taking to the streets. I think history has taught us that a lot of corporations will always put profit over people here in this community. I want to put the people first. Even this dog was dressed in a no data center shirt. When we"
  3. FOX5 Las Vegas Broadcast Report Broadcast Report transcribed from local broadcast report
    "Light and that's not accurate. Our wind mostly blows from where the data center will be. Nobody wants to sit through a city council meeting. No one knows what's going on. The developer of the town site, solar two project, did make a presentation on their amended plans. After rounds of community feedback, but ultimately the commission shared their thoughts and voted against the developer's proposal. This is the hottest topic, one of the hottest topics in the country. On top of our lack of water. Regardless of how I"
2019 to 2024 hearings
July 1, 2019 Henderson, NV Google announces new data center in Henderson Henderson City Council 2 clips

Henderson City Council and state economic development approval of property and sales tax abatements for the $600 million Google Henderson data center campus in Clark County (July 1, 2019).

  1. Las Vegas Economic Development and Applicant Presentation Developer Representative transcribed from local broadcast report
    "of them here in the United States. It's Google's first ever data center in the state of Nevada. The facility will serve billions of internet users around the world. You're looking at what will be the foundation for Google's future location in Henderson. Once the $600 million facility opens, there will be at least 50 full time jobs from high tech personnel with PhDs to people with"
  2. 8 News Now, Las Vegas Broadcast Report Broadcast Report transcribed from local broadcast report
    "Data centers are really the engine of the internet. they are the backbone of the infrastructure that allows us to bring the products and services that so many people love and use, whether it's YouTube, Google Play, Google Search, Google Cloud, those are being processed in our data centers right here. I think it's the beginning of a big turning point for Henderson in terms of this city becoming the city of the future in terms of"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Google lists Google Henderson data center at Henderson, Nevada on its own page of data center locations, read September 14, 2026.

    [1] datacenters.google

Nearest data centers in Nevada

Verified data center records in Nevada within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Boulder City Eldorado Valley BLM Data Center Proposal Boulder City, Clark County 8 mi Stalled or cancelled Switch Inc. 1 building
Flexential Las Vegas Pollock Data Center (LAS01 / LAS03) Las Vegas, Clark County 13 mi Running Flexential 7.4 MW
EdgeConneX Las Vegas Data Center (LAS01) Las Vegas, Clark County 15 mi Running EdgeConneX 6 MW
Switch The CORE Campus (Las Vegas) Las Vegas, Clark County 17 mi Running Switch Inc. 500 MW
DataBank Las Vegas Data Center (LAS1) Las Vegas, Clark County 19 mi Running DataBank 6 MW
Flexential North Las Vegas Data Center (LAS02) North Las Vegas, Clark County 20 mi Running Flexential 6 MW

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Water a year

1 figure, 1 source
404,000,000 gallons per year Reported

ktnv.com, Sep 8, 2026 (opens in a new tab)

Show each source's words
  • 404,000,000 gallons per year, ktnv.com: Google's Henderson data center at 560 W. Warm Springs Road used more than 404 million gallons of water in 2025

Common questions about Google Henderson Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Google Henderson Data Center?

Google is the developer. No construction contractor is named on the record yet.

Who will use Google Henderson Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Google Henderson Data Center say it needs?

Power: 150 MW (the developer's figure, google.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Google Henderson Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What is still unknown about Google Henderson Data Center?

Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google: Data center locations (opens in a new tab), Google, September 14, 2026

1 source on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google Henderson Data Center", https://datacenterrecord.org/projects/google-henderson-data-center-nv, last verified October 26, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google Henderson Data Center", https://datacenterrecord.org/projects/google-henderson-data-center-nv. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
35.9845, -114.9185
How the location is known
Location from the site's street address.
Location source
https://www.google.com/about/datacenters/locations/nevada/
Coordinate source
City of Henderson building permit and Google Nevada data center specification
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
150 MW, the developer's figure
Published
September 14, 2026
Last verified
October 26, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Google Henderson Data Center · 1 source, 1 entry · basis and source tier on every row · verified October 26, 2026

Download CSV JSON