Dipper Ventures LLC CH3 Data Center

Elk Grove Village, Cook County, ILDeveloper: Dipper Ventures LLCCensus GEOID 17031

Undisclosed in public filings
Power, Land, Buildings, Water

The EPA's facility registry lists Dipper Ventures LLC CH3 Data Center at 1400 Devon Ave, Elk Grove Village, IL 60007 in Elk Grove Village, Illinois, with an air permit. It is not yet verified: a public source shows this site exists and names no stage for it, such as a permit on file or an operator's list that calls it in consideration; its current status has not been confirmed from a record.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 1 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Not yet verified, ringed
  • data center
  • Smaller pins: 38 other published records in Illinois
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Who leads it
Dipper Ventures LLC as stated by the source
[1] echo.epa.gov
Undisclosed in public filings
Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Dipper Ventures LLC as stated by the source [1] echo.epa.gov (opens in a new tab) October 20, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Cook County and Elk Grove Village about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Chicago case by case Alderman Bill Conway introduced an ordinance that would add additional regulations for data centers and ban them in some districts, though it stops short of a citywide moratorium. blockclubchicago.org (opens in a new tab)
Chicago case by case Mayor Brandon Johnson introduced an ordinance to Chicago City Council to pause construction of any new data center for 12 months and block material expansion of existing ones. blockclubchicago.org (opens in a new tab)
Chicago case by case Chicago Mayor Brandon Johnson proposed a one year moratorium on new data center construction to develop new regulations on zoning, water and power usage, and quality of life for residents. nbcchicago.com (opens in a new tab)
Chicago case by case Chicago Mayor Brandon Johnson announces a city wide temporary moratorium on data center development and expansion for 12 months while the city develops a comprehensive regulatory framework talkingpointsmemo.com (opens in a new tab)
Chicago case by case Mayor Johnson's executive order last month called for a moratorium while the city develops a regulatory framework for data centers yahoo.com (opens in a new tab)
Chicago case by case Chicago Mayor Brandon Johnson and aldermen Maria Hadden, Leni Manaa Hoppenworth and Lamont Robinson introduced an ordinance to pause data center development and material expansion for one year yahoo.com (opens in a new tab)
20 earlier decisions on the county's rows
DateWhoDecisionSource
Chicago case by case Chicago executive order provided for enhanced evaluation of air pollution control permits, data center specific noise rules, and cross departmental review process for planned developments including data centers thecentersquare.com (opens in a new tab)
Chicago case by case Mayor Brandon Johnson issued an executive order last month to regulate data centers and called on the city council to pass a moratorium on new data centers thecentersquare.com (opens in a new tab)
Cicero Chicagoland suburbs suing data center companies; Cicero mobilizing legal challenge to Digital Realty Hawthorne development therealdeal.com (opens in a new tab)
Chicago case by case Mayor Johnson called for a temporary moratorium on new data centers springfieldnewssun.com (opens in a new tab)
Chicago case by case Mayor Brandon Johnson signed an executive order creating stricter data center regulations and oversight springfieldnewssun.com (opens in a new tab)
Cook County case by case More than a dozen data centers near O'Hare airport received local property tax breaks in 2026. abc7chicago.com (opens in a new tab)
Cicero Cicero trustees passed a resolution opposing data center development at Hawthorne in neighboring Stickney chicago.suntimes.com (opens in a new tab)
Stickney restrictive Stickney board of trustees voted unanimously to block any data center proposals with a moratorium on zoning changes and approvals for data centers chicago.suntimes.com (opens in a new tab)
Cook County case by case Mayor Brandon Johnson was pressured by anti data center activists at a rally chicagotribune.com (opens in a new tab)
Chicago case by case The working group report recommended the city create a new program for issuing noise and air pollution permits and enhancing environmental review news.wttw.com (opens in a new tab)
Chicago case by case A city working group on sustainable data centers spent over a year and a half developing recommendations, with report released in July 2026 news.wttw.com (opens in a new tab)
Chicago case by case Mayor Brandon Johnson issued an executive order calling on Chicago City Council to pause new data center construction news.wttw.com (opens in a new tab)
Chicago case by case Chicago City Council voted near unanimously on an ordinance incentivizing data center development news.wttw.com (opens in a new tab)
Cook County case by case Mayor Brandon Johnson pushed new rules and moratorium on new data centers axios.com (opens in a new tab)
Chicago case by case Mayor Brandon Johnson called for a temporary moratorium on data centers cbsnews.com (opens in a new tab)
Chicago case by case Chicago Mayor Brandon Johnson signed an executive order for stricter data center regulations cbsnews.com (opens in a new tab)
Chicago case by case Johnson's executive order last month added some regulations surrounding noise and air pollution for data centers. blockclubchicago.org (opens in a new tab)
Chicago case by case Johnson created a task force in August via an executive order to establish a regulatory framework for data centers in Chicago. blockclubchicago.org (opens in a new tab)
Hoffman Estates Karis Critical withdrew rezoning request for data center in Hoffman Estates datacenterdynamics.com (opens in a new tab)
Hoffman Estates Developer withdrew rezoning request for data center in Hoffman Estates capitolnewsillinois.com (opens in a new tab)

What happened

No dated entry is on the record yet.

The site

The pin is the site, as the EPA's facility record places it. Location from an EPA air permit.

The site map is at the top of the page.

Where
1400 Devon Ave, Elk Grove Village, IL 60007, Elk Grove Village, Cook County, Illinois [1] echo.epa.gov (opens in a new tab)
How exactly it is located
Exact, the point of the EPA's facility record
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
By the straight line between two exact points.

USGS NAIP aerial view of Dipper Ventures LLC CH3 Data Center
LAT 41.99395 / LON -87.96469 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Dipper Ventures LLC CH3 Data Center?

Dipper Ventures LLC is the developer, echo.epa.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Dipper Ventures LLC CH3 Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Dipper Ventures LLC CH3 Data Center stand today?

It is not yet verified: a public source shows this site exists and names no stage for it, such as a permit on file or an operator's list that calls it in consideration; its current status has not been confirmed from a record. No dated entry is on the record yet.

What has Elk Grove Village or Cook County decided about it?

Chicago (rated case by case): Alderman Bill Conway introduced an ordinance that would add additional regulations for data centers and ban them in some districts, though it stops short of a citywide moratorium (September 23, 2026, blockclubchicago.org (opens in a new tab)); and Chicago: Mayor Brandon Johnson introduced an ordinance to Chicago City Council to pause construction of any new data center for 12 months and block material expansion of existing ones (September 23, 2026, blockclubchicago.org (opens in a new tab)). 26 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO detailed facility report: Dipper Ventures LLC CH3 Data Center (opens in a new tab), U.S. Environmental Protection Agency

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Dipper Ventures LLC CH3 Data Center", https://datacenterrecord.org/projects/dipper-ventures-llc-ch3-data-center-elk-grove-village-il, last verified October 20, 2026. CSV · JSON
Cite this page

Data Center Record, "Dipper Ventures LLC CH3 Data Center", https://datacenterrecord.org/projects/dipper-ventures-llc-ch3-data-center-elk-grove-village-il. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Not yet verified
Tier
built from one source
Tags
Built from one source
Coordinates
41.993947, -87.964693
How the location is known
Location from an EPA facility record.
Location source
EPA ECHO facility record 110070005143: the registry placed its point by interpolation photo, accurate to 5 m
Coordinate source
epa frs point
Location source number
[1]
Location last verified
October 20, 2026
EPA registry id
110070005143
Rating of the county's rows
Case by case
Published
October 20, 2026
Last verified
October 20, 2026
Undisclosed in public filings
Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed

Researcher view · Dipper Ventures LLC CH3 Data Center · 1 source, 0 entries, 26 decisions nearby · basis and source tier on every row · verified October 20, 2026