Yondr Group Manassas data center campus

Yondr Group and Cerberus Capital Management acquired a 40 acre site in Manassas for a planned 72 MW data center campus expected to enter service in 2029. It is proposed, since August 5, 2026.

How much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
72 MW
not disclosed
Water
Not disclosed
Who leads it
Yondr Group
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 72 MW not disclosed September 20, 2026
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Yondr Group as stated by the source September 20, 2026
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. · Status: proposed (content date)

    Yondr Group and Cerberus Capital Management acquired a 40 acre site in Manassas for a planned 72 MW data center campus expected to enter service in 2029. [1]

The full Yondr Group Manassas data center campus timeline, in order

The site

Where in Manassas is not in the public record. The pin marks the center of Manassas, not a building, and the outline is Manassas city.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 35 other published records in Virginia
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Manassas, Manassas city, Virginia
How exactly it is located
Town level, the center of the city
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at the center of its town.

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Yondr Group Manassas data center campus?

The record has one measure of its size: 72 MW (not disclosed). Its acreage is not disclosed.

Who is building Yondr Group Manassas data center campus?

Yondr Group is the developer. No construction contractor is named on the record yet.

How much power and water does Yondr Group Manassas data center campus say it needs?

Power: 72 MW (not disclosed). Water: not disclosed by any source on file.

Where does Yondr Group Manassas data center campus stand today?

It is proposed, since August 5, 2026. The newest entry, August 5, 2026: Yondr Group and Cerberus Capital Management acquired a 40 acre site in Manassas for a planned 72 MW data center campus expected to enter service in 2029. [1]

What has Manassas or Manassas city decided about it?

No decision by Manassas or Manassas city about data centers is on the record. The Manassas city page and the Virginia scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Navigating Virginia’s Data Center Boom: Policy Shifts, Local Projects, and Future Challenges, Data Center Frontier, August 5, 2026, trade press

1 source on file.

Cite this record

Data Center Record, "Yondr Group Manassas data center campus", https://datacenterrecord.org/projects/yondr-group-manassas-data-center-campus-va, last verified September 20, 2026.

Last verified , first recorded . Every correction is logged on the corrections page.

Cite this page

Data Center Record, "Yondr Group Manassas data center campus", https://datacenterrecord.org/projects/yondr-group-manassas-data-center-campus-va. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
yondr-group-manassas-data-center-campus-va
Status value
proposed
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/va/manassas-city/manassas
Coordinates
38.7478604, -77.4838217
Location precision
city
Location source
City centroid (Manassas), U.S. Census Bureau TIGERweb, public domain, placed at city level
Coordinate source
tigerweb city centroid
Location source number
Not disclosed
Location last verified
September 17, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
72 MW, not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-04
Last verified
2026-09-20