● Proposed Campus Recorded August 5, 2026

Yondr Group Manassas data center campus

Location Manassas, Manassas city, Virginia city centroid Town level, the center of the city

Overview, regulatory gates and specifications

Yondr Group and Cerberus Capital Management acquired a 40 acre site in Manassas for a planned 72 MW data center campus expected to enter service in 2029. [2]

Verified Site & Permit Summary
Verified address
Manassas, Manassas city, Virginia city centroid
Operator / developer
Yondr Group
Permit / registry ID
Data Center Frontier on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Yondr Group as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Yondr Group
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Yondr Group Manassas data center campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. Acquisition (content date)

    Yondr Group and Cerberus Capital Management acquired a 40 acre site in Manassas for a planned 72 MW data center campus expected to enter service in 2029.

    [2] datacenterfrontier.com

Every event in order

1 correction to this record

Every correction, with its reason
  1. · Event type

    The entry reports a purchase of land, a building or a company, a change of hands and not a stage; its kind was other and is acquisition (the record's rules, on the editor's word).

Every correction on the record is on the corrections page.

Nearest data centers in Virginia

Verified data center records in Virginia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
STACK Infrastructure Manassas Manassas, Manassas city Less than 1 mi Running STACK Infrastructure 2 buildings
Google Prince William County data center Bristow, Prince William County Less than 1 mi Running Google 2 buildings
Digital Third Second Manassas, LLC & Digital Carver Brickyard, LLC Manassas, Prince William County Less than 1 mi Proposed Digital Realty
CloudHQ - Cashvad Ventures LLC Manassas, Manassas City Less than 1 mi Proposed CloudHQ
Amazon Data Services (IAD-130, IAD-131, IAD-313 and DCA-072) Manassas, Prince William County Less than 1 mi Proposed Amazon Web Services
Amazon Data Services Inc IAD-45 Manassas, Prince William County Less than 1 mi Proposed Amazon Web Services

Blank cell: not disclosed by any source on file.

Common questions about Yondr Group Manassas data center campus

Answered directly from the verified filings and local actions on this page.

Who is building Yondr Group Manassas data center campus?

Yondr Group is the developer. No construction contractor is named on the record yet.

How much power and water does Yondr Group Manassas data center campus say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Yondr Group Manassas data center campus stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Yondr Group: Global data center locations (opens in a new tab), Yondr Group

Reporting

  1. Navigating Virginia’s Data Center Boom: Policy Shifts, Local Projects, and Future Challenges (opens in a new tab), Data Center Frontier, August 5, 2026, trade press

2 sources on file.

Regional grid context

This site is in the SERC Virginia and Carolina North (SRVC-N) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Yondr Group Manassas data center campus", https://datacenterrecord.org/projects/yondr-group-manassas-data-center-campus-va, last verified October 24, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Yondr Group Manassas data center campus", https://datacenterrecord.org/projects/yondr-group-manassas-data-center-campus-va. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
38.7478604, -77.4838217
How the location is known
Location is the city center; exact site not disclosed.
Location source
City centroid (Manassas), U.S. Census Bureau TIGERweb, public domain, placed at city level
Coordinate source
tigerweb city centroid
Location last verified
September 17, 2026
Published
September 4, 2026
Last verified
October 24, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Yondr Group Manassas data center campus · 2 sources, 1 entry · basis and source tier on every row · verified October 24, 2026