Data Center Record.

Not yet verified Built from one source

Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center

St. Francisville, West Feliciana Parish, LADeveloper: Jacobs Project Management Co, Hut 8 DC CorpCensus GEOID 22125

Undisclosed in public filings
Power, Land, Buildings, Water

The EPA's facility registry lists Jacobs Project Management Co, Hut 8 DC Corp river Bend Data Center at 2545 La Hwy 964, Saint Francisville, LA 70000 in Saint Francisville, Louisiana, with a water permit. It is not yet verified: a public source shows this site exists and names no stage for it, such as a permit on file or an operator's list that calls it in consideration; its current status has not been confirmed from a record.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 1 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Not yet verified, ringed
  • data center
  • Smaller pins: 9 other published records in Louisiana
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Who leads it
Jacobs Project Management Co, Hut 8 DC Corp as stated by the source
[1] echo.epa.gov
Undisclosed in public filings
Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Jacobs Project Management Co, Hut 8 DC Corp as stated by the source [1] echo.epa.gov (opens in a new tab) October 20, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What happened

No dated entry is on the record yet.

1 correction to this record

Every correction, with its reason
  1. · the city of a projects row

    The EPA's registry spells the town "Saint Francisville"; the Census Bureau's name for the place in West Feliciana Parish is St. Francisville. Corrected under the record's rules (October 20, 2026). The old and new text.

Every correction on the record is on the corrections page.

What was said

What we're doing today is not just breaking ground on a new project; we're literally breaking ground on Louisiana's future. We're also breaking ground on America's future
Jeff Landry, Governor, State of Louisiana · October 6, 2026 · quoted · WBRZ (opens in a new tab) local outlet
We have the current Governor running around the state pitching data centers, pitching carbon capture, talking about artificial intelligence, as if big business and outside corporations are actually good for our economy. If they were, Louisiana would be one of the richest states in the whole country because we've heard this nonsense before
Ann Rolfes, Director, Louisiana Bucket Brigade · October 6, 2026 · quoted · WBRZ (opens in a new tab) local outlet

Every statement about data centers in Louisiana, by speaker

The site

The pin is the site's address.

The site map is at the top of the page.

Where
2545 La Hwy 964, Saint Francisville, LA 70000, St. Francisville, West Feliciana Parish, Louisiana [1] echo.epa.gov (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
By the straight line between two exact points.

USGS NAIP aerial view of Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center
LAT 30.78420 / LON -91.37640 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center?

Jacobs Project Management Co, Hut 8 DC Corp is the developer, echo.epa.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center stand today?

It is not yet verified: a public source shows this site exists and names no stage for it, such as a permit on file or an operator's list that calls it in consideration; its current status has not been confirmed from a record. No dated entry is on the record yet.

What has St. Francisville or West Feliciana Parish decided about it?

No decision by St. Francisville or West Feliciana Parish about data centers is on the record. The West Feliciana Parish page and the Louisiana scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO detailed facility report: Jacobs Project Management Co, Hut 8 DC Corp river Bend Data Center (opens in a new tab), U.S. Environmental Protection Agency

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center", https://datacenterrecord.org/projects/jacobs-project-management-co-hut-8-dc-corp-saint-francisville-la, last verified October 20, 2026. CSV · JSON
Cite this page

Data Center Record, "Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center", https://datacenterrecord.org/projects/jacobs-project-management-co-hut-8-dc-corp-saint-francisville-la. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Not yet verified
Tier
built from one source
Tags
Built from one source
Coordinates
30.7842, -91.3764
How the location is known
Location from the site's street address.
Location source
U.S. Census Bureau 2020 Gazetteer, the internal point of St. Francisville, public domain, placed at city level; the EPA facility record gives no site point (the registry placed its point by post office name centroid, which is not the site)
Coordinate source
census gazetteer place point
Location last verified
October 20, 2026
Published
October 20, 2026
Last verified
October 20, 2026
Undisclosed in public filings
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center · 1 source, 0 entries, 0 decisions nearby · basis and source tier on every row · verified October 20, 2026

Download CSV JSON