Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center
St. Francisville, West Feliciana Parish, LADeveloper: Jacobs Project Management Co, Hut 8 DC CorpCensus GEOID 22125
- Stage
- Not yet verified
- Undisclosed in public filings
- Power, Land, Buildings, Water
The EPA's facility registry lists Jacobs Project Management Co, Hut 8 DC Corp river Bend Data Center at 2545 La Hwy 964, Saint Francisville, LA 70000 in Saint Francisville, Louisiana, with a water permit. It is not yet verified: a public source shows this site exists and names no stage for it, such as a permit on file or an operator's list that calls it in consideration; its current status has not been confirmed from a record.
How much power it needs, how much water it would use and who would use it have not been disclosed.
Tap a pin for the data center, the parcel for its record
- This record: Not yet verified, ringed
- data center
- Smaller pins: 9 other published records in Louisiana
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Undisclosed in public filings
- Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | ||||
| How much water it would use | ||||
| How loud it would be | ||||
| Jobs once it runs | ||||
| Tax it would pay each year |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | Jacobs Project Management Co, Hut 8 DC Corp | as stated by the source | [1] echo.epa.gov (opens in a new tab) | October 20, 2026 |
| Who is constructing it | ||||
| How much land | ||||
| Buildings | ||||
| Where its power comes from | ||||
| Grid connection | ||||
| How it is cooled |
A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water use A state water right filing or a water supply agreement.
- Who would use it A lease announcement or a tenant named in a filing.
- Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.
What happened
No dated entry is on the record yet.
1 correction to this record
Every correction, with its reason
-
· the city of a projects row
The EPA's registry spells the town "Saint Francisville"; the Census Bureau's name for the place in West Feliciana Parish is St. Francisville. Corrected under the record's rules (October 20, 2026). The old and new text.
Every correction on the record is on the corrections page.
What was said
What we're doing today is not just breaking ground on a new project; we're literally breaking ground on Louisiana's future. We're also breaking ground on America's future
We have the current Governor running around the state pitching data centers, pitching carbon capture, talking about artificial intelligence, as if big business and outside corporations are actually good for our economy. If they were, Louisiana would be one of the richest states in the whole country because we've heard this nonsense before
The site
The pin is the site's address.
- Where
- 2545 La Hwy 964, Saint Francisville, LA 70000, St. Francisville, West Feliciana Parish, Louisiana [1] echo.epa.gov (opens in a new tab)
- How exactly it is located
- Exact, at the address
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- By the straight line between two exact points.
Keep going
Questions about this project
4 questions answered from the record
Who is building Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center?
-
Jacobs Project Management Co, Hut 8 DC Corp is the developer, echo.epa.gov (opens in a new tab). No construction contractor is named on the record yet.
How much power and water does Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center say it needs?
-
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Where does Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center stand today?
-
It is not yet verified: a public source shows this site exists and names no stage for it, such as a permit on file or an operator's list that calls it in consideration; its current status has not been confirmed from a record. No dated entry is on the record yet.
What has St. Francisville or West Feliciana Parish decided about it?
-
No decision by St. Francisville or West Feliciana Parish about data centers is on the record. The West Feliciana Parish page and the Louisiana scorecard list every rated row the day a person publishes one.
Sources
Primary documents
- EPA ECHO detailed facility report: Jacobs Project Management Co, Hut 8 DC Corp river Bend Data Center (opens in a new tab), U.S. Environmental Protection Agency
1 source on file.
About this data
Last verified and first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center
Cite this page
Data Center Record, "Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center", https://datacenterrecord.org/projects/jacobs-project-management-co-hut-8-dc-corp-saint-francisville-la. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Stage
- Not yet verified
- Tier
- built from one source
- Tags
- Built from one source
- Coordinates
- 30.7842, -91.3764
- How the location is known
- Location from the site's street address.
- Location source
- U.S. Census Bureau 2020 Gazetteer, the internal point of St. Francisville, public domain, placed at city level; the EPA facility record gives no site point (the registry placed its point by post office name centroid, which is not the site)
- Coordinate source
- census gazetteer place point
- Location last verified
- October 20, 2026
- Published
- October 20, 2026
- Last verified
- October 20, 2026
- Undisclosed in public filings
- Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows