      "slug": "jacobs-project-management-co-hut-8-dc-corp-saint-francisville-la",
      "name": "Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center",
      "summary": "The EPA's facility registry lists Jacobs Project Management Co, Hut 8 DC Corp river Bend Data Center at 2545 La Hwy 964, Saint Francisville, LA 70000 in Saint Francisville, Louisiana, with a water permit.",
      "state": "LA",
      "city": "St. Francisville",
      "county": "West Feliciana Parish",
      "status": "not_verified",
      "developer": "Jacobs Project Management Co, Hut 8 DC Corp",
      "capacity_mw": null,
      "latitude": 30.7842,
      "longitude": -91.3764,
      "location_precision": "address",
      "location_source": "U.S. Census Bureau 2020 Gazetteer, the internal point of St. Francisville, public domain, placed at city level; the EPA facility record gives no site point (the registry placed its point by post office name centroid, which is not the site)",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "census gazetteer place point",
      "location_last_verified": "2026-10-20",
      "site_address": "2545 La Hwy 964, Saint Francisville, LA 70000",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072156341",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072156341",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/jacobs-project-management-co-hut-8-dc-corp-saint-francisville-la",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Jacobs Project Management Co, Hut 8 DC Corp river Bend Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072156341",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    }
  ]
}