Census GEOID: 12099 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary sources

● Running First recorded September 14, 2026 · 1 Building

Equinix MI3 Boca Raton Subsea Cable Landing Station Data Center

Street address 4680 Conference Way South, Boca Raton, FL 33431, Palm Beach County verified address Exact, at the address [2] Equinix: Equinix MI3

Overview, regulatory gates and specifications

Equinix operates its MI3 Category 5 hurricane rated International Business Exchange and subsea cable landing station at 4680 Conference Way South in Boca Raton, Palm Beach County, Florida. [1] Filings on the record specify disclosed capacity of 10 MW (the developer's figure), 1 planned or operational building. [2] Equinix lists Equinix MI3 at Boca Raton, Florida on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [2]
10 MW
the developer's figure

Equivalent to ~8,300 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.5% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 4680 Conference Way South, Boca Raton, FL 33431.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
10 MW developer figure Equivalent to the continuous electricity demand of about 8,300 average U.S. homes based on U.S. Energy Information Administration residential consumption data. Less than 0.1 percent (0.098 percent) of New York City's summer peak demand in 2024.
[2] equinix.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[2] equinix.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2014 (12 years)
Who leads it
Equinix as stated by the source
Official project website
equinix.com (opens in a new tab) verified October 28, 2026
equinix.com (opens in a new tab)
Archived promotional websites
equinix.com (offline) [Wayback snapshot] (opens in a new tab); equinix.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Equinix MI3 Boca Raton Subsea Cable Landing Station Data Center, capacity: 10 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 10 ÷ 10,245 = 0.00098 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Equinix
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Equinix MI3 Boca Raton Subsea Cable Landing Station Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 10 MW 10 MW the developer's figure [2] equinix.com
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [2] equinix.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

July 15, 2026 Wellington, FL Project Tango fuels debate over Florida’s first hyperscale AI data center Palm Beach County Board of County Commissioners 3 clips

WPLG Local 10 report on Palm Beach County Board of County Commissioners and community proceedings in Wellington, FL: Project Tango fuels debate over Florida’s first hyperscale AI data center (July 15, 2026).

  1. WPLG Local 10 Broadcast Report Broadcast Report transcribed from local broadcast report
    "We have a choice, use your voice. As data centers rise, No data centers. so does the backlash. NO DATA CENTERS, NOT TODAY. BIPARTISAN protests all over the country and now the fight has come to Florida. You'd have to be living under a rock to not realize how horrible these centers are. Project Tango, a proposed hyperscale data center, the first in the state, in western Palm Beach County."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "The site chosen because it's just a few hundred feet away from a major power plant. And so you have one of the most connected pieces of electrical infrastructure in Florida with the largest power plant in the state of Florida immediately next to a site that's been zoned and used for industrial uses for decades. But it's the location also generating fierce opposition. Project Tango"
  3. WPLG Local 10 Broadcast Report Broadcast Report transcribed from local broadcast report
    "and an elementary school, both just outside of Wellington. Project Tango's original master plan was approved 10 years ago, but now developers are seeking permission to expand that plan by 1.5 million square feet, mostly they say for warehouses but could also be used for more data center space. Dozens of data centers already exist in Miami Dade County like this one, Iron Mountain, set to open later this year,"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Equinix lists Equinix MI3 at Boca Raton, Florida on its own page of data center locations, read September 14, 2026.

    [2] equinix.com

Nearest data centers in Florida

Verified data center records in Florida within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
365 Data Centers Boca Raton (BC1) Boca Raton, Palm Beach County 1 mi Running 365 Data Centers 4 MW
Flexential Fort Lauderdale Data Center Campus (FLL01 and FLL02) Fort Lauderdale, Broward County 15 mi Running Flexential 12 MW
365 Data Centers Fort Lauderdale (FLL1) Broward County 15 mi Running 365 Data Centers 6 MW
Project Tango Loxahatchee AI Data Center Proposal Palm Beach County 24 mi Stalled or cancelled PBA Holdings 2 buildings
EdgeConneX Miami Gardens Data Center (EDCMIA02) Miami, Miami-Dade County 31 mi Running EdgeConneX 8 MW
iM Critical Miami Data Center Miami, Miami-Dade County 38 mi Running iM Critical 8 MW

Blank cell: not disclosed by any source on file.

Common questions about Equinix MI3 Boca Raton Subsea Cable Landing Station Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Equinix MI3 Boca Raton Subsea Cable Landing Station Data Center?

Equinix is the developer. No construction contractor is named on the record yet.

How much power and water does Equinix MI3 Boca Raton Subsea Cable Landing Station Data Center say it needs?

Power: 10 MW (the developer's figure, equinix.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Equinix MI3 Boca Raton Subsea Cable Landing Station Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Equinix: United States and Canada colocation data centers (opens in a new tab), Equinix, September 14, 2026
  2. Equinix: Equinix MI3 (opens in a new tab), Equinix, September 14, 2026

2 sources on file.

Regional grid context

This site is in the FRCC All (FRCC) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Equinix MI3 Boca Raton Subsea Cable Landing Station Data Center", https://datacenterrecord.org/projects/equinix-mi3-boca-raton-fl, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Equinix MI3 Boca Raton Subsea Cable Landing Station Data Center", https://datacenterrecord.org/projects/equinix-mi3-boca-raton-fl. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
26.387989, -80.108267
How the location is known
Location from the site's street address.
Location source
https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/miami-data-centers/mi3
Coordinate source
Palm Beach County Property Appraiser / Equinix
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
10 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Equinix MI3 Boca Raton Subsea Cable Landing Station Data Center · 2 sources, 1 entry · basis and source tier on every row · verified October 27, 2026

Download CSV JSON