Turner Construction Wlo SN1 Data Center Project

San Antonio, Bexar County, TXDeveloper: MicrosoftCensus GEOID 48029

Stage
Running
Buildings
1 building
air permit generator list
Undisclosed in public filings
Power, Land, Water

The EPA's facility registry lists Turner Construction Wlo SN1 Data Center Project at 5150 Rogers RD, San Antonio, TX 78251 in San Antonio, Texas, with no permit program listed. It is running; the record holds no sourced date for when it reached that stage.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 1 primary · Reviewed by a person, every entry sourced. · How to read this page

  • This record: Running, ringed
  • data center
  • Smaller pins: 66 other published records in Texas
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
1 building air permit generator list
[1] echo.epa.gov
Who leads it
Microsoft as stated by the source
Undisclosed in public filings
Land, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Microsoft as stated by the source October 24, 2026
Who is constructing it
How much land
Buildings 1 building air permit generator list [1] echo.epa.gov (opens in a new tab) October 24, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Bexar County and San Antonio about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
San Antonio Development Services Department hosted three stakeholder input sessions and prepared draft UDC amendments for data centers pending PCDC Committee review. sa.gov (opens in a new tab)
San Antonio Texas law requires cities to follow a strict process to establish a building permit moratorium lasting approximately three months for initial adoption and up to 180 days for extension. sa.gov (opens in a new tab)
San Antonio City Council discussed a possible moratorium on data center construction following a Council Consideration Request and memo calling for temporary moratorium. sa.gov (opens in a new tab)

What happened

No dated entry is on the record yet.

  • Read on October 24, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from primary EPA ECHO or operator record.

    [1] echo.epa.gov

The site

The pin is the site, as the EPA's facility record places it. Location from an EPA facility record.

The site map is at the top of the page.

Where
5150 Rogers RD, San Antonio, TX 78251, San Antonio, Bexar County, Texas [1] echo.epa.gov (opens in a new tab)
How exactly it is located
Exact, the point of the EPA's facility record
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
By the straight line between two exact points.

USGS NAIP aerial view of Turner Construction Wlo SN1 Data Center Project
LAT 29.47897 / LON -98.69541 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Turner Construction Wlo SN1 Data Center Project?

The record has one measure of its size: 1 building (air permit generator list, echo.epa.gov (opens in a new tab)). Its power capacity is not disclosed.

Who is building Turner Construction Wlo SN1 Data Center Project?

Microsoft is the developer. No construction contractor is named on the record yet.

How much power and water does Turner Construction Wlo SN1 Data Center Project say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Turner Construction Wlo SN1 Data Center Project stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has San Antonio or Bexar County decided about it?

San Antonio: Development Services Department hosted three stakeholder input sessions and prepared draft UDC amendments for data centers pending PCDC Committee review (reported August 25, 2026, sa.gov (opens in a new tab)); and San Antonio: Texas law requires cities to follow a strict process to establish a building permit moratorium lasting approximately three months for initial adoption and up to 180 days for extension (reported August 25, 2026, sa.gov (opens in a new tab)). 3 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO detailed facility report: Turner Construction Wlo SN1 Data Center Project (opens in a new tab), U.S. Environmental Protection Agency

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Turner Construction Wlo SN1 Data Center Project", https://datacenterrecord.org/projects/turner-construction-wlo-sn1-data-center-project-san-antonio-tx, last verified October 24, 2026. CSV · JSON
Cite this page

Data Center Record, "Turner Construction Wlo SN1 Data Center Project", https://datacenterrecord.org/projects/turner-construction-wlo-sn1-data-center-project-san-antonio-tx. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
29.47897, -98.69541
How the location is known
Location from an EPA facility record.
Location source
EPA ECHO facility record 110035156041: the registry placed its point by address matching house number, accurate to 30 m
Coordinate source
epa frs point
Location source number
[1]
Location last verified
October 20, 2026
EPA registry id
110035156041
Published
October 20, 2026
Last verified
October 24, 2026
Undisclosed in public filings
Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Turner Construction Wlo SN1 Data Center Project · 1 source, 1 entry, 3 decisions nearby · basis and source tier on every row · verified October 24, 2026