Intel Corporation Data Center

Santa Clara, Santa Clara County, CADeveloper: Intel CorporationCensus GEOID 06085

Undisclosed in public filings
Power, Land, Buildings, Water

The EPA's facility registry lists Intel Corporation Data Center at 2151 Mission College Blvd., Santa Clara, CA 95054 in Santa Clara, California, with a hazardous waste record. It is not yet verified: a public source shows this site exists and names no stage for it, such as a permit on file or an operator's list that calls it in consideration; its current status has not been confirmed from a record.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 1 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Not yet verified, ringed
  • data center
  • Smaller pins: 36 other published records in California
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Who leads it
Intel Corporation as stated by the source
[1] echo.epa.gov
Undisclosed in public filings
Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Intel Corporation as stated by the source [1] echo.epa.gov (opens in a new tab) October 20, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Santa Clara County and Santa Clara about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
San Jose Santa Clara City is pushing for a plan to require large customers such as data centers to reduce power use when power is scarce mk.co.kr (opens in a new tab)
Santa Clara County Santa Clara County Sustainability Committee discussed moratorium suspending permits for new data centers for a certain period, strengthening disclosure of resource use, and gap analysis mk.co.kr (opens in a new tab)
Gilroy restrictive Gilroy approved 45 day moratorium on data center applications kalw.org (opens in a new tab)
Gilroy restrictive The moratorium could potentially be extended for up to two years. mercurynews.com (opens in a new tab)
Gilroy restrictive Gilroy City Council approved a temporary moratorium on new data center applications effective immediately for at least 45 days. mercurynews.com (opens in a new tab)
Morgan Hill restrictive Morgan Hill City Council adopted a temporary moratorium on data centers and battery storage facilities while staff develops possibly permanent guidelines gilroydispatch.com (opens in a new tab)
6 earlier decisions on the county's rows
DateWhoDecisionSource
Gilroy restrictive The moratorium would not affect the Amazon data center already approved and under construction on Camino Arroyo gilroydispatch.com (opens in a new tab)
Gilroy restrictive Approved interim urgency ordinances remain in place for 45 days unless renewed by the council, then can be renewed for an additional 10 months and 15 days, and again for another 12 months if needed gilroydispatch.com (opens in a new tab)
Gilroy restrictive The moratorium would allow the city to review and update design and development standards that would apply to data centers and other industrial developments gilroydispatch.com (opens in a new tab)
Gilroy restrictive Gilroy City Council will consider adopting a temporary moratorium on new data centers at its Sept. 14 meeting gilroydispatch.com (opens in a new tab)
San Jose San Jose residents push for data center moratorium sanjosespotlight.com (opens in a new tab)
San Jose San Jose is considering data center development amid resident environmental concerns kqed.org (opens in a new tab)

What happened

No dated entry is on the record yet.

The site

The pin is the site, as the EPA's facility record places it. Location from an EPA hazardous waste record.

The site map is at the top of the page.

Where
2151 Mission College Blvd., Santa Clara, CA 95054, Santa Clara, Santa Clara County, California [1] echo.epa.gov (opens in a new tab)
How exactly it is located
Exact, the point of the EPA's facility record
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
By the straight line between two exact points.

USGS NAIP aerial view of Intel Corporation Data Center
LAT 37.38852 / LON -121.96240 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Intel Corporation Data Center?

Intel Corporation is the developer, echo.epa.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Intel Corporation Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Intel Corporation Data Center stand today?

It is not yet verified: a public source shows this site exists and names no stage for it, such as a permit on file or an operator's list that calls it in consideration; its current status has not been confirmed from a record. No dated entry is on the record yet.

What has Santa Clara or Santa Clara County decided about it?

San Jose: Santa Clara City is pushing for a plan to require large customers such as data centers to reduce power use when power is scarce (reported September 17, 2026, mk.co.kr (opens in a new tab)); and Santa Clara County: Santa Clara County Sustainability Committee discussed moratorium suspending permits for new data centers for a certain period, strengthening disclosure of resource use, and gap analysis (reported September 17, 2026, mk.co.kr (opens in a new tab)). 12 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO detailed facility report: Intel Corporation Data Center (opens in a new tab), U.S. Environmental Protection Agency

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Intel Corporation Data Center", https://datacenterrecord.org/projects/intel-corporation-data-center-santa-clara-ca, last verified October 20, 2026. CSV · JSON
Cite this page

Data Center Record, "Intel Corporation Data Center", https://datacenterrecord.org/projects/intel-corporation-data-center-santa-clara-ca. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Not yet verified
Tier
built from one source
Tags
Built from one source
Coordinates
37.38852, -121.9624
How the location is known
Location from an EPA facility record.
Location source
EPA ECHO facility record 110042154539: the registry placed its point by address matching house number, accurate to 30 m
Coordinate source
epa frs point
Location source number
[1]
Location last verified
October 20, 2026
EPA registry id
110042154539
Rating of the county's rows
Restrictive
Published
October 20, 2026
Last verified
October 20, 2026
Undisclosed in public filings
Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed

Researcher view · Intel Corporation Data Center · 1 source, 0 entries, 12 decisions nearby · basis and source tier on every row · verified October 20, 2026