CloudHQ Chaska Data Center Campus (MSP Campus)

Chaska, Carver County, MNDeveloper: CloudHQCensus GEOID 27019

Stage
Being built
Power
180 MW
the developer's figure
Buildings
3 buildings
operator page, verified October 27, 2026
Undisclosed in public filings
Land, Water

CloudHQ is constructing a 3 building, 180 MW hyperscale data center campus in the Southwest Chaska industrial corridor in Chaska, Carver County, Minnesota. It is being built; the record holds no sourced date for when it reached that stage.

How much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Being built, ringed
  • data center
  • Smaller pins: 26 other published records in Minnesota
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
3 buildings operator page, verified October 27, 2026
Power it would draw
180 MW the developer's figure About 2 percent of New York City's summer peak demand in 2024.
Who leads it
CloudHQ as stated by the source
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. CloudHQ Chaska Data Center Campus (MSP Campus), capacity: 180 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 180 ÷ 10,245 = 0.02 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 180 MW the developer's figure cloudhq.com (opens in a new tab) October 27, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it CloudHQ as stated by the source October 27, 2026
Who is constructing it
How much land
Buildings 3 buildings operator page, verified October 27, 2026 cloudhq.com (opens in a new tab) October 27, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Carver County and Chaska about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Carver County case by case During public sessions before the Carver County Board of Commissioners in MN, officials and residents recorded 1 public remarks (1 opposing and 0 supporting, classified in the Pushback forming sentiment band) regarding local data center zoning, water supply, and electric grid capacity. pushback.myhamlet.com (opens in a new tab)

What happened

  1. · Status: proposed (content date)

    CloudHQ plans a data center in Chaska with estimated water usage of about 1.5 million gallons per day at peak use.

    [1] govtech.com

The full CloudHQ Chaska Data Center Campus (MSP Campus) timeline, in order

The site

The pin is the site's address.

The site map is at the top of the page.

Where
US Highway 212 and Engler Boulevard, Chaska, MN 55318, Chaska, Carver County, Minnesota [source] (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of CloudHQ Chaska Data Center Campus (MSP Campus)
LAT 44.81240 / LON -93.63450 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is CloudHQ Chaska Data Center Campus (MSP Campus)?

The record has 2 measures of its size: 180 MW (the developer's figure, cloudhq.com (opens in a new tab)) and 3 buildings (operator page, verified October 27, 2026, cloudhq.com (opens in a new tab)). Its acreage is not disclosed.

Who is building CloudHQ Chaska Data Center Campus (MSP Campus)?

CloudHQ is the developer. No construction contractor is named on the record yet.

How much power and water does CloudHQ Chaska Data Center Campus (MSP Campus) say it needs?

Power: 180 MW (the developer's figure, cloudhq.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does CloudHQ Chaska Data Center Campus (MSP Campus) stand today?

It is being built; the date it reached that stage is not sourced, only the day a page was read. The newest entry, April 11, 2025: CloudHQ plans a data center in Chaska with estimated water usage of about 1.5 million gallons per day at peak use. [1]

What has Chaska or Carver County decided about it?

Carver County (rated case by case): During public sessions before the Carver County Board of Commissioners in MN, officials and residents recorded 1 public remarks (1 opposing and 0 supporting, classified in the Pushback forming sentiment band) regarding local data center zoning, water supply, and electric grid capacity (July 16, 2026, pushback.myhamlet.com (opens in a new tab)). 1 event is on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Minnesota Data Center Debate Turns to Water Consumption - GovTech (opens in a new tab), GovTech, April 11, 2025, query feed

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "CloudHQ Chaska Data Center Campus (MSP Campus)", https://datacenterrecord.org/projects/cloudhq-chaska-data-center-mn, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "CloudHQ Chaska Data Center Campus (MSP Campus)", https://datacenterrecord.org/projects/cloudhq-chaska-data-center-mn. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
44.8124, -93.6345
How the location is known
Location from the site's street address.
Location source
https://www.cloudhq.com/
Coordinate source
City of Chaska EAW and CloudHQ MSP Campus specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
180 MW, the developer's figure
Rating of the county's rows
Case by case
Published
October 21, 2026
Last verified
October 27, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection

Researcher view · CloudHQ Chaska Data Center Campus (MSP Campus) · 1 source, 1 entry, 1 decision nearby · basis and source tier on every row · verified October 27, 2026

Download CSV JSON