Data Center Record.

Being built Built from one source

TeraWulf Cayuga Lake High Performance Computing Data Center Campus

Lansing, Tompkins County, NYDeveloper: TeraWulfCensus GEOID 36109

Stage
Being built
Power
300 MW
the developer's figure
Buildings
3 buildings
operator page, verified October 27, 2026
Undisclosed in public filings
Land, Water

TeraWulf is constructing a 300 MW, 3 building high performance computing and AI data center campus at the former Cayuga Generating Station site on Cayuga Lake in Lansing, Tompkins County, New York. It is being built; the record holds no sourced date for when it reached that stage.

How much water it would use and who would use it have not been disclosed.

1 hearing on the record, 2025

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Being built, ringed
  • data center
  • Smaller pins: 31 other published records in New York
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
3 buildings operator page, verified October 27, 2026
Power it would draw
300 MW the developer's figure About 3 percent of New York City's summer peak demand in 2024.
Who leads it
TeraWulf as stated by the source
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. TeraWulf Cayuga Lake High Performance Computing Data Center Campus, capacity: 300 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 300 ÷ 10,245 = 0.03 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 300 MW the developer's figure terawulf.com (opens in a new tab) October 27, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it TeraWulf as stated by the source October 27, 2026
Who is constructing it
How much land
Buildings 3 buildings operator page, verified October 27, 2026 terawulf.com (opens in a new tab) October 27, 2026
Where its power comes from
Grid connection
How it is cooled

How much power it needs, also reported: 200 MW, 2026 (Ars Technica (opens in a new tab): TeraWulf owns and operates Lake Mariner; Fluidstack will run the center and has contracted for more than 200 megawatts, later expanded to 360 megawatts) .

Jobs once it runs, also reported: 35 to 40 jobs, 2026 (Ars Technica (opens in a new tab): TeraWulf's 2024 project manager stated full buildout would bring 35 to 40 permanent jobs at a facility drawing up to 500 megawatts) .

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Tompkins County and Lansing about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Dryden closed The town of Dryden in Tompkins County adopted zoning changes banning data centers and cryptocurrency mines over concerns about their energy use yahoo.com (opens in a new tab)
September 29, 2025 Lansing, NY Lansing Town Board TeraWulf Cayuga Lake AI Data Center Hearing Lansing Town Board 3clips

At a September 29, 2025 public hearing in Tompkins County, New York, Lansing Town Supervisor Ruth Groff and residents weighed public outcry against TeraWulf's proposed AI data center at the former Cayuga coal plant site on the shore of Cayuga Lake.

  1. Ruth Groff, Town Supervisor, Town of Lansing Elected Official transcribed from the official recording
    "Hanna Devanny reports. >> Neighbors in Lansing voicing their concerns over plans to build a 180 acre data center off the shore of Cayuga Lake. Ruth Groff, the Lansing town supervisor, says those concerns are being considered before a vote is made. >> There has been a lot of public outcry against it for environmental reasons and for"
  2. Resident public comment Resident Public Comment transcribed from the official recording
    "environment. >> The electricity use and water use are probably the biggest factors when it comes to environmental footprint of data centers. >> Tara Wolf CEO Sean Farrell, addressing concerns over water usage, saying the facility would use an enclosed loop cooling system, meaning no water will be taken out of Cayuga Lake or pushed out. >> It doesn't actually use"
  3. Lansing Town Board Member Elected Official transcribed from the official recording
    "two main primary loops. >> Water is used to cool the computers. It goes through a chiller before it's recycled and continues to loop again. The water initially comes from utility water. >> There's no environmental impacts. >> I data centers can cause problems with both water supply. >> Experts say this could make neighboring communities have unusable water, a claim Farrell denies. >> And that closed loop system"
Said and filed

Said and filed

Statements and filings, side by side

Statement and primary filing Lansing & Tompkins County, NY Hearing Record → Project Dossier: terawulf-lake-hawkeye-lansing-ny →
Water Power & Grid Zoning Noise
Column A · Dated Statement
TeraWulf Inc. Chief Operating Officer Nazar Khan Chief Operating Officer, TeraWulf Inc.
Venue: Cayuga Lake Former Coal Plant Site Redevelopment Announcement
"Represented that converting the former Cayuga coal plant site on Cayuga Lake into a high performance AI data center would reuse existing industrial infrastructure without adverse lake or neighborhood impacts."
Column B · Primary Government Record
Town of Lansing Board Review & Public Outcry Over Cayuga Lake Water and Noise Impacts
Lansing Town Board Hearing Record (Sept 29, 2025)
Agency or Venue: Lansing Town Board
"At the September 29, 2025 Lansing Town Board review, Town Supervisor Ruth Groff confirmed the board was weighing sustained public opposition over Cayuga Lake water intake, thermal discharge, and shoreline industrial zoning before any permit vote."
CNY Central

What happened

  1. · Status: proposed (content date)

    TeraWulf proposes to convert an abandoned coal fired power plant near Cayuga Lake in Lansing into a 300 MW data center, facing lawsuits over environmental concerns.

    [1] spectrumlocalnews.com

The full TeraWulf Cayuga Lake High Performance Computing Data Center Campus timeline, in order

The site

The pin is the site's address.

The site map is at the top of the page.

Where
2282 Fire Lane 1 (2282 Ridge Road), Lansing, NY 14882, Lansing, Tompkins County, New York [source] (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of TeraWulf Cayuga Lake High Performance Computing Data Center Campus
LAT 42.60250 / LON -76.63420 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Comparisons

2 metrics with more than one figure

Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.

Capacity at full buildout

2 figures, 2 sources
Show each source's words
  • 200 MW, Ars Technica: TeraWulf owns and operates Lake Mariner; Fluidstack will run the center and has contracted for more than 200 megawatts, later expanded to 360 megawatts

Permanent jobs

1 figure, 1 source
Show each source's words
  • 35 to 40 jobs, Ars Technica: TeraWulf's 2024 project manager stated full buildout would bring 35 to 40 permanent jobs at a facility drawing up to 500 megawatts

Questions about this project

7 questions answered from the record

Answered from the rows on this page.

How big is TeraWulf Cayuga Lake High Performance Computing Data Center Campus?

The record has 2 measures of its size: 300 MW (the developer's figure, terawulf.com (opens in a new tab)) and 3 buildings (operator page, verified October 27, 2026, terawulf.com (opens in a new tab)). Its acreage is not disclosed.

Who is building TeraWulf Cayuga Lake High Performance Computing Data Center Campus?

TeraWulf is the developer. No construction contractor is named on the record yet.

Who will use TeraWulf Cayuga Lake High Performance Computing Data Center Campus?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does TeraWulf Cayuga Lake High Performance Computing Data Center Campus say it needs?

Power: 300 MW (the developer's figure, terawulf.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does TeraWulf Cayuga Lake High Performance Computing Data Center Campus stand today?

It is being built; the date it reached that stage is not sourced, only the day a page was read. The newest entry, August 4, 2026: TeraWulf proposes to convert an abandoned coal fired power plant near Cayuga Lake in Lansing into a 300 MW data center, facing lawsuits over environmental concerns. [1]

What has Lansing or Tompkins County decided about it?

Dryden (rated closed): The town of Dryden in Tompkins County adopted zoning changes banning data centers and cryptocurrency mines over concerns about their energy use (reported September 17, 2026, yahoo.com (opens in a new tab)). 1 event is on the county's rows; a rule about the area is not a decision about this record.

What is still unknown about TeraWulf Cayuga Lake High Performance Computing Data Center Campus?

Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Proposed data centers dividing New Yorkers - Spectrum News (opens in a new tab), Spectrum News, August 4, 2026, query feed

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "TeraWulf Cayuga Lake High Performance Computing Data Center Campus", https://datacenterrecord.org/projects/terawulf-lake-hawkeye-lansing-ny, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "TeraWulf Cayuga Lake High Performance Computing Data Center Campus", https://datacenterrecord.org/projects/terawulf-lake-hawkeye-lansing-ny. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
42.6025, -76.6342
How the location is known
Location from the site's street address.
Location source
https://www.terawulf.com/
Coordinate source
Tompkins County Parcel Viewer / TeraWulf Cayuga SEC Filing
How capacity was disclosed
the developer's figure
Capacity, if disclosed
300 MW, the developer's figure
Rating of the county's rows
Closed
Published
September 28, 2026
Last verified
October 27, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection

Researcher view · TeraWulf Cayuga Lake High Performance Computing Data Center Campus · 1 source, 1 entry, 1 decision nearby · basis and source tier on every row · verified October 27, 2026

Download CSV JSON