Data Center Record.

Running Built from one source

Digital Fortress Portland (PTL2 Beaverton)

Beaverton, Washington County, ORDeveloper: Digital FortressCensus GEOID 41067

Stage
Running
Buildings
1 building
operator page, verified October 26, 2026
Undisclosed in public filings
Power, Land, Water

Digital Fortress lists Digital Fortress (PTL2) at 9705 SW Sunshine Court, Beaverton, OR on its interconnection and facility directory. Co located facilities include: Digital Fortress (Digital Fortress (PTL2)), Digital Fortress (Digital Fortress (PTL3)). It is running, as reported October 26, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Running, ringed
  • data center
  • Smaller pins: 23 other published records in Oregon
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
1 building operator page, verified October 26, 2026
[1] dfcolo.com
Who leads it
Digital Fortress as stated by the source
Undisclosed in public filings
Land, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Digital Fortress as stated by the source October 26, 2026
Who is constructing it
How much land
Buildings 1 building operator page, verified October 26, 2026 [1] dfcolo.com (opens in a new tab) October 26, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Washington County and Beaverton about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Hillsboro restrictive Hillsboro enacted a 120 day moratorium on new data center and battery storage applications in late July 2026 kptv.com (opens in a new tab)
Hillsboro restrictive Hillsboro City Council enacted a 120 day moratorium on new data center developments. kptv.com (opens in a new tab)
Hillsboro restrictive Hillsboro pushing back against data center expansion katu.com (opens in a new tab)
Hillsboro restrictive Hillsboro put 120 day moratorium on data center projects at end of July 2026 datacenterdynamics.com (opens in a new tab)
Washington County Washington County Commissioner Nafisa Fai announced her intention to bring forward a proposal that would temporarily pause new data center and AI computing facility development and permitting countywide katu.com (opens in a new tab)
Hillsboro restrictive Hillsboro's 120 day moratorium on data centers went into effect katu.com (opens in a new tab)
6 earlier decisions on the county's rows
DateWhoDecisionSource
Hillsboro restrictive Hillsboro City Council unanimously approved a 120 day moratorium on new data center and battery energy storage system proposals, effective July 27, 2026, through at least November 24, 2026. hillsboronewstimes.com (opens in a new tab)
Hillsboro restrictive Hillsboro City Council voted for a moratorium on all new data center construction. klcc.org (opens in a new tab)
Hillsboro restrictive Hillsboro City Council adopted a 120 day moratorium on accepting new data center applications katu.com (opens in a new tab)
Hillsboro restrictive Hillsboro City Council unanimously adopted 120 day moratorium on data center and battery energy storage land use applications on July 28 2026 opb.org (opens in a new tab)
Hillsboro restrictive Hillsboro, Oregon also approved its own pause at a last minute July 27 meeting yahoo.com (opens in a new tab)
Hillsboro restrictive A legal challenge has been filed to stop Hillsboro, Oregon data center deals hillsboroherald.com (opens in a new tab)

What happened

  1. · Status: running (source date; the content gives no date of its own)

    Verified operational colocation data center at 9705 SW Sunshine Ct, Beaverton.

    [1] dfcolo.com

The full Digital Fortress Portland (PTL2 Beaverton) timeline, in order

The site

The pin is the site's address.

The site map is at the top of the page.

Where
9705 SW Sunshine Ct, Beaverton, OR 97005, Beaverton, Washington County, Oregon [1] dfcolo.com (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Digital Fortress Portland (PTL2 Beaverton)
LAT 45.47635 / LON -122.77640 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Digital Fortress Portland (PTL2 Beaverton)?

The record has one measure of its size: 1 building (operator page, verified October 26, 2026, dfcolo.com (opens in a new tab)). Its power capacity is not disclosed.

Who is building Digital Fortress Portland (PTL2 Beaverton)?

Digital Fortress is the developer. No construction contractor is named on the record yet.

How much power and water does Digital Fortress Portland (PTL2 Beaverton) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Digital Fortress Portland (PTL2 Beaverton) stand today?

It is running, as reported October 26, 2026. The newest entry, reported October 26, 2026: Verified operational colocation data center at 9705 SW Sunshine Ct, Beaverton. [1]

What has Beaverton or Washington County decided about it?

Hillsboro (rated restrictive): Hillsboro enacted a 120 day moratorium on new data center and battery storage applications in late July 2026 (reported September 15, 2026, kptv.com (opens in a new tab)); and Hillsboro: Hillsboro City Council enacted a 120 day moratorium on new data center developments (reported September 14, 2026, kptv.com (opens in a new tab)). 12 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Digital Fortress: Portland (Beaverton PTL2) Data Center Specification (opens in a new tab), Digital Fortress, query feed

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Digital Fortress Portland (PTL2 Beaverton)", https://datacenterrecord.org/projects/digital-fortress-digital-fortress-ptl2-beaverton-or, last verified October 26, 2026. CSV · JSON
Cite this page

Data Center Record, "Digital Fortress Portland (PTL2 Beaverton)", https://datacenterrecord.org/projects/digital-fortress-digital-fortress-ptl2-beaverton-or. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
45.476347, -122.776398
How the location is known
Location from the site's street address.
Location source
https://dfcolo.com/locations/portland-oregon/
Coordinate source
Digital Fortress Portland (PTL2) facility specification
Rating of the county's rows
Restrictive
Published
October 21, 2026
Last verified
October 26, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed

Researcher view · Digital Fortress Portland (PTL2 Beaverton) · 1 source, 1 entry, 12 decisions nearby · basis and source tier on every row · verified October 26, 2026

Download CSV JSON