AISO Solar Powered Colocation Data Center Romoland

Romoland, Riverside County, CADeveloper: Affordable Internet Services Online (AISO)Census GEOID 06065

Stage
Running
Power
1 MW
the developer's figure
Buildings
1 building
operator page, verified October 27, 2026
Undisclosed in public filings
Land, Water

Affordable Internet Services Online (AISO) operates an onsite solar powered commercial colocation and hosting data center at 25655 Louisa Lane in Romoland, Riverside County, California, with 1 MW of capacity. It is running; the record holds no sourced date for when it reached that stage.

How much water it would use and who would use it have not been disclosed.

2 hearings on the record, 2026

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Running, ringed
  • data center
  • Smaller pins: 68 other published records in California
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
1 building operator page, verified October 27, 2026
[1] aiso.net
Power it would draw
1 MW the developer's figure About 0 percent of New York City's summer peak demand in 2024.
[1] aiso.net
Who leads it
Affordable Internet Services Online (AISO) as stated by the source
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. AISO Solar Powered Colocation Data Center Romoland, capacity: 1 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 1 ÷ 10,245 = 0 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 1 MW the developer's figure [1] aiso.net (opens in a new tab) October 27, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Affordable Internet Services Online (AISO) as stated by the source October 27, 2026
Who is constructing it
How much land
Buildings 1 building operator page, verified October 27, 2026 [1] aiso.net (opens in a new tab) October 27, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Riverside County and Romoland about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Perris The Perris Planning Commission recommended a data center ban in the city following Wednesday September 16 hearing pressenterprise.com (opens in a new tab)
Perris Perris Planning Commission voted 5-0 on September 16, 2026, to recommend a data center ban to the city council. pressenterprise.com (opens in a new tab)
Desert Hot Springs Desert Hot Springs placed temporary ban on data centers in 2026 bisnow.com (opens in a new tab)
Coachella closed Coachella passed permanent ban on data centers in late August 2026 bisnow.com (opens in a new tab)
Indio Indio placed temporary ban on data centers, considering permanent ban bisnow.com (opens in a new tab)
Riverside Riverside considering proposal to ban data centers bisnow.com (opens in a new tab)
2 earlier decisions on the county's rows
DateWhoDecisionSource
Perris Perris city voting on ban on data centers bisnow.com (opens in a new tab)
Coachella closed Coachella city council approved a data center ban in August 2026. pressenterprise.com (opens in a new tab)
June 15, 2026 Moreno Valley, CA City Council April 7, 2026 Moreno Valley City Council 3clips

In Moreno Valley, Riverside County (CA), Moreno Valley City Council and local residents debated municipal data center siting, utility infrastructure load, water consumption, and zoning rules during the June 15, 2026 session.

  1. Moreno Valley City Council Applicant and Economic Development Presentation Developer Representative auto captions, unchecked
    "Good afternoon and welcome to the April 7th closed session of the city council of the city of Moreno Valley. The city council receives a separate stipen from the community services district if any CSD business is conducted during this meeting. I now call the meeting to order on April 7th at 4:01 p.m. Madame Clerk, roll call, please. >> Thank you, Mayor. Council member Bernard >> here, >> Council Member DGado"
  2. Moreno Valley City Council Official Deliberation Elected Official auto captions, unchecked
    "it over to our city attorney. Mr. City attorney, what matters will the council be discussing in closed session today? >> Mr. Mayor, we have um actually five items, but they're listed as three items here. Um item D1, it's going to be conference with legal counsel regarding potential initiation of litigation. That's pursuant to government code section 54956.9D4."
  3. Resident public comment Resident Public Comment auto captions, unchecked
    "Water Company. So, we're going to talk about that in close session. >> Thank you very much, Mr. City Attorney. So, with that, we will go ahead and recess into closed session."
June 15, 2026 Perris, CA Perris residents seeking ban of data center construction in city limits Perris City Council 3clips

In Perris, Riverside County (CA), Perris City Council and local residents debated municipal data center siting, utility infrastructure load, water consumption, and zoning rules during the June 15, 2026 session.

  1. Perris City Council Applicant and Economic Development Presentation Developer Representative auto captions, unchecked
    ">> Franko Pacheco is a lifelong Paris resident. His organization, the Inland Valley Alliance for Environmental Justice, is fighting against what they call an over industrialization of the Inland Empire. >> The negative impacts of of warehousing in our region has really taken a toll on uh Paris residents. It used to take me 15 minutes to get from Paris to Riverside. And now the 215 is just a long line of truck traffic."
  2. Perris City Council Official Deliberation Elected Official auto captions, unchecked
    "issue on whether to prohibit or put limits on the building of data centers within the city. >> The amount of pollution and negative impacts that they bring and the cost of electricity, which we've been seeing that is like skyrocketing people's bills, um water pollution into like the natural wells and stuff. Um this it could be a very good step into protecting residents. >> Data centers power anything from social"
  3. Resident public comment Resident Public Comment auto captions, unchecked
    "more than a million dollars in property tax revenue and more high paying jobs. But the report also says a center could need millions of gallons of water daily to cool, continuously emits white noise, and would demand a surge of electricity. >> Residents in Paris and cities like this, we always get the short end of the stick because we give up way more than what we receive back from these projects. >> Cities up and down Southern California"

What happened

No dated entry is on the record yet.

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from California state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] aiso.net

The site

The pin is the site's address.

The site map is at the top of the page.

Where
25655 Louisa Lane, Romoland, CA 92585, Romoland, Riverside County, California [1] aiso.net (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of AISO Solar Powered Colocation Data Center Romoland
LAT 33.74850 / LON -117.16820 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is AISO Solar Powered Colocation Data Center Romoland?

The record has 2 measures of its size: 1 MW (the developer's figure, aiso.net (opens in a new tab)) and 1 building (operator page, verified October 27, 2026, aiso.net (opens in a new tab)). Its acreage is not disclosed.

Who is building AISO Solar Powered Colocation Data Center Romoland?

Affordable Internet Services Online (AISO) is the developer. No construction contractor is named on the record yet.

How much power and water does AISO Solar Powered Colocation Data Center Romoland say it needs?

Power: 1 MW (the developer's figure, aiso.net (opens in a new tab)). Water: not disclosed by any source on file.

Where does AISO Solar Powered Colocation Data Center Romoland stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Romoland or Riverside County decided about it?

Perris: The Perris Planning Commission recommended a data center ban in the city following Wednesday September 16 hearing, pressenterprise.com (opens in a new tab); and Perris: Perris Planning Commission voted 5-0 on September 16, 2026, to recommend a data center ban to the city council, pressenterprise.com (opens in a new tab). 8 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. AISO Solar Powered Colocation Data Center Romoland Official Disclosure (opens in a new tab), Affordable Internet Services Online (AISO), query feed

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "AISO Solar Powered Colocation Data Center Romoland", https://datacenterrecord.org/projects/affordable-internet-services-online-inc-aiso-data-center-romoland-ca, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "AISO Solar Powered Colocation Data Center Romoland", https://datacenterrecord.org/projects/affordable-internet-services-online-inc-aiso-data-center-romoland-ca. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
33.7485, -117.1682
How the location is known
Location from the site's street address.
Location source
https://www.aiso.net/
Coordinate source
Riverside County Assessor / AISO Romoland specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
1 MW, the developer's figure
Rating of the county's rows
Closed
Published
October 21, 2026
Last verified
October 27, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection

Researcher view · AISO Solar Powered Colocation Data Center Romoland · 1 source, 1 entry, 8 decisions nearby · basis and source tier on every row · verified October 27, 2026