Liberty Center One operates a commercial colocation data center at 4815 Delemere Avenue in Royal Oak, Oakland County, Michigan. It is running; the record holds no sourced date for when it reached that stage.
How much water it would use and who would use it have not been disclosed.
Tap a pin for the data center, the parcel for its record
- This record: Running, ringed
- data center
- Smaller pins: 24 other published records in Michigan
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Power it would draw
- 4 MW the developer's figure About 0 percent of New York City's summer peak demand in 2024.
- [1] libertycenterone.com
- Who leads it
- Liberty Center One as stated by the source
- Undisclosed in public filings
- Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
- Liberty Center One Royal Oak Data Center, capacity: 4 MW.
- New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
- 4 ÷ 10,245 = 0 (MW over MW).
Sources:
- Liberty Center One (opens in a new tab)
- NYISO, 2025 Load and Capacity Data Report (Gold Book) (opens in a new tab), Table I-4a, Baseline Summer Non-Coincident Peak Demand, Historical and Forecast, page 26, Zone J, 2024 row (2024)
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | 4 MW | the developer's figure | [1] libertycenterone.com (opens in a new tab) | October 27, 2026 |
| How much water it would use | ||||
| How loud it would be | ||||
| Jobs once it runs | ||||
| Tax it would pay each year |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | Liberty Center One | as stated by the source | October 27, 2026 | |
| Who is constructing it | ||||
| How much land | ||||
| Buildings | 1 building | operator page, verified October 27, 2026 | [1] libertycenterone.com (opens in a new tab) | October 27, 2026 |
| Where its power comes from | ||||
| Grid connection | ||||
| How it is cooled |
A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water use A state water right filing or a water supply agreement.
- Who would use it A lease announcement or a tenant named in a filing.
- Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.
What was decided
Acts of Oakland County and Royal Oak about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Wixom | Wixom has imposed a moratorium and adopted new zoning rules | cbsnews.com (opens in a new tab) | |
| Wixom | Wixom in Oakland County has been sued by developers claiming the moratorium is unlawful | michiganindependent.com (opens in a new tab) | |
| Wixom | Wixom implemented a 180 day data center moratorium | michiganadvance.com (opens in a new tab) |
June 15, 2026 Wixom, MI Wixom residents to weigh in on data center ordinance as city council meets
In Wixom, Oakland County (MI), Wixom City Council and local residents debated municipal data center siting, utility infrastructure load, water consumption, and zoning rules during the June 15, 2026 session.
- Wixom City Council Applicant and Economic Development Presentation Developer Representative auto captions, unchecked
"concerns. Township officials are considering a 12 year tax break for Oracle and Open AI. >> Well, now in the next hour, the Wixom City Council will consider a proposed data center on Wixom Road near Pontiac Trail, but this would require the council to waive their moratorium on data centers. >> 7 News Detroit reporter Whitney Bernie is in Wixom, where she found a lot of data center apprehension from the"
- Wixom City Council Official Deliberation Elected Official auto captions, unchecked
">> It's a waste of money. It's a waste of water. It's a waste of resources. >> There are a lot of opinions. >> I'm worried about the electricity. I'm worried about the low numbers of employees that work at these places. I'm uh concerned that they're asking for tax breaks already. >> Absolutely not. Those guys can pay for their own stuff. >> Take it out there where, you know, where there's space. >> Arizona, New Mexico, California."
- Resident public comment Resident Public Comment auto captions, unchecked
"worked to draft an ordinance specifically regulating data centers. As the countdown ticks down for that 6 month moratorium to expire, City Council is set to hear what could be included in that legislation at their meeting Tuesday. >> So, people will have the opportunity at this meeting to make that public comment and give feedback to council about what they think about the ordinance amendment or about what they think ought to be done. >> City Manager Steve Brown says the council will also consider lifting the"
Using this data in a report? Support the record.
What happened
No dated entry is on the record yet.
-
Read on October 27, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications.
The site
The pin is the site's address.
- Where
- 4815 Delemere Avenue, Royal Oak, MI 48073, Royal Oak, Oakland County, Michigan [1] libertycenterone.com (opens in a new tab)
- How exactly it is located
- Exact, at the address
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- ManagedWay Troy Data Center (TYM1), 4.0 mi
- 123NET Southfield Data Center Campus (DC1), 5.3 mi
- ManagedWay and 123NET Southfield Data Center (SFJ2 / DC2), 5.4 mi
- 365 Data Centers Detroit (DT1), 6.1 mi
- EdgeConneX Detroit Data Center (DET01), 7.2 mi
Keep going
Questions about this project
5 questions answered from the record
How big is Liberty Center One Royal Oak Data Center?
-
The record has 2 measures of its size: 4 MW (the developer's figure, libertycenterone.com (opens in a new tab)) and 1 building (operator page, verified October 27, 2026, libertycenterone.com (opens in a new tab)). Its acreage is not disclosed.
Who is building Liberty Center One Royal Oak Data Center?
-
Liberty Center One is the developer. No construction contractor is named on the record yet.
How much power and water does Liberty Center One Royal Oak Data Center say it needs?
-
Power: 4 MW (the developer's figure, libertycenterone.com (opens in a new tab)). Water: not disclosed by any source on file.
Where does Liberty Center One Royal Oak Data Center stand today?
-
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
What has Royal Oak or Oakland County decided about it?
-
Wixom (rated restrictive): Wixom has imposed a moratorium and adopted new zoning rules (reported October 7, 2026, cbsnews.com (opens in a new tab)); and Wixom: Wixom in Oakland County has been sued by developers claiming the moratorium is unlawful (reported October 1, 2026, michiganindependent.com (opens in a new tab)). 3 events are on the county's rows; a rule about the area is not a decision about this record.
Sources
Reporting
- Liberty Center One Royal Oak Data Center Official Disclosure (opens in a new tab), Liberty Center One, query feed
1 source on file.
About this data
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about Liberty Center One Royal Oak Data Center
Cite this page
Data Center Record, "Liberty Center One Royal Oak Data Center", https://datacenterrecord.org/projects/liberty-center-one-liberty-center-one-royal-oak-mi. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
For researchers
- Stage
- Running
- Tier
- built from one source
- Tags
- Built from one source
- Coordinates
- 42.533508, -83.177393
- How the location is known
- Location from the site's street address.
- Location source
- https://www.libertycenterone.com/
- Coordinate source
- Liberty Center One Royal Oak specification
- How capacity was disclosed
- the developer's figure
- Capacity, if disclosed
- 4 MW, the developer's figure
- Rating of the county's rows
- Restrictive
- Published
- October 21, 2026
- Last verified
- October 27, 2026
- Undisclosed in public filings