Data Center Record.

Running Built from one source

Greensparc Cordova Hydroelectric Edge Data Center

Cordova, Chugach Census Area, AKDeveloper: GreensparcCensus GEOID 02063

Stage
Running
Operational since 2024 (2 years)
Undisclosed in public filings
Power, Land, Buildings, Water

Greensparc and Cordova Electric Cooperative commissioned a 170 kilowatt edge compute data center in 2024 at the Humpback Creek hydroelectric facility in Cordova, Chugach Census Area, Alaska. It is running, since March 9, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 6 sources, 1 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Running, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 6 other published records in Alaska
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Commissioned
Operational since 2024 (2 years)
Who leads it
Greensparc as stated by the source
Official project website
greensparc.com (opens in a new tab) verified October 28, 2026
greensparc.com (opens in a new tab)
Archived promotional websites
greensparc.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Undisclosed in public filings
Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Greensparc as stated by the source greensparc.com (opens in a new tab) October 28, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled
Official project website greensparc.com verified October 28, 2026 greensparc.com (opens in a new tab) October 28, 2026

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. · Status: running (content date)

    Greensparc and Cordova Electric Cooperative operates a 170 kilowatt edge compute data center inside the Humpback Creek hydroelectric facility in Cordova, Alaska.

    [1] cordovaelectric.com

Every event in order

The site

Where in Cordova is not in the public record. The pin marks the center of Cordova, not a building, and the outline is Chugach Census Area.

The site map is at the top of the page.

Where
Humpback Creek Hydroelectric Facility, Cordova, AK 99574, Cordova, Chugach Census Area, Alaska [source] (opens in a new tab)
How exactly it is located
Town level, the center of the city
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at the center of its town.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Greensparc Cordova Hydroelectric Edge Data Center?

Greensparc is the developer, greensparc.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Greensparc Cordova Hydroelectric Edge Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Greensparc Cordova Hydroelectric Edge Data Center stand today?

It is running, since March 9, 2026. The newest entry, March 9, 2026: Greensparc and Cordova Electric Cooperative operates a 170 kilowatt edge compute data center inside the Humpback Creek hydroelectric facility in Cordova, Alaska. [1]

What has Cordova or Chugach Census Area decided about it?

No decision by Cordova or Chugach Census Area about data centers is on the record. The Chugach Census Area page and the Alaska scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Cordova Electric Cooperative Humpback Creek Hydroelectric Edge Compute Deployment (opens in a new tab), Cordova Electric Cooperative

Reporting

  1. In Alaska, a Data Center Inside a Power Plant, Inside a Microgrid - nlr.gov (opens in a new tab), nlr.gov, March 5, 2026, query feed
  2. In Alaska, a Data Center Inside a Power Plant, Inside a Microgrid - CleanTechnica (opens in a new tab), CleanTechnica, March 9, 2026, query feed
  3. Edge data center firm Greensparc targets new Alaska deployments - Data Center Dynamics (opens in a new tab), Data Center Dynamics, May 15, 2026, query feed
  4. Proposed small-scale data center in Wrangell raises questions - Juneau Independent (opens in a new tab), Juneau Independent, January 14, 2026, query feed
  5. What Is ‘Sustainable’ at the Governor’s Energy Conference? - Alaska Business Magazine (opens in a new tab), Alaska Business Magazine, May 21, 2026, query feed

6 sources on file.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

What researchers have found

These studies measure different things. Some model wholesale market prices. Some measure what households actually paid. Some model what would happen under a policy change. The record shows each one as the authors stated it and does not rank them.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Greensparc Cordova Hydroelectric Edge Data Center", https://datacenterrecord.org/projects/greensparc-cordova-data-center-ak, last verified October 28, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Greensparc Cordova Hydroelectric Edge Data Center", https://datacenterrecord.org/projects/greensparc-cordova-data-center-ak. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
60.53014, -145.64206
How the location is known
Location is the city center; exact site not disclosed.
Location source
Cordova Electric Cooperative and Alaska Energy Authority Humpback Creek facility record
Capacity, if disclosed
0.17 MW, not disclosed
Published
September 27, 2026
Last verified
October 28, 2026
Undisclosed in public filings
Coordinate source, Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Greensparc Cordova Hydroelectric Edge Data Center · 6 sources, 1 entry, 0 decisions nearby · basis and source tier on every row · verified October 28, 2026

Download CSV JSON