TierPoint St. Louis Millpark Data Center (Maryland Heights)
Maryland Heights, St. Louis County, MODeveloper: TierPointCensus GEOID 29189
- Stage
- Running
- Undisclosed in public filings
- Land, Water
TierPoint operates its suburban St. Louis commercial colocation data center at 2315 Millpark Drive in Maryland Heights, St. Louis County, Missouri. It is running; the record holds no sourced date for when it reached that stage.
How much water it would use and who would use it have not been disclosed.
Tap a pin for the data center, the parcel for its record
- This record: Running, ringed
- data center
- Smaller pins: 24 other published records in Missouri
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Power it would draw
- 6 MW the developer's figure About 0 percent of New York City's summer peak demand in 2024.
- [1] tierpoint.com
- Who leads it
- TierPoint as stated by the source
- Undisclosed in public filings
- Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
- TierPoint St. Louis Millpark Data Center (Maryland Heights), capacity: 6 MW.
- New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
- 6 ÷ 10,245 = 0 (MW over MW).
Sources:
- TierPoint (opens in a new tab)
- NYISO, 2025 Load and Capacity Data Report (Gold Book) (opens in a new tab), Table I-4a, Baseline Summer Non-Coincident Peak Demand, Historical and Forecast, page 26, Zone J, 2024 row (2024)
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | 6 MW | the developer's figure | [1] tierpoint.com (opens in a new tab) | October 27, 2026 |
| How much water it would use | ||||
| How loud it would be | ||||
| Jobs once it runs | ||||
| Tax it would pay each year |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | TierPoint | as stated by the source | October 27, 2026 | |
| Who is constructing it | ||||
| How much land | ||||
| Buildings | 1 building | operator page, verified October 27, 2026 | [1] tierpoint.com (opens in a new tab) | October 27, 2026 |
| Where its power comes from | ||||
| Grid connection | ||||
| How it is cooled |
A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water use A state water right filing or a water supply agreement.
- Who would use it A lease announcement or a tenant named in a filing.
- Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.
What was decided
Acts of St. Louis County and Maryland Heights about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Ferguson | Ferguson City Council voted 4-3 to approve tax incentives and redevelopment plan for data center at former Emerson campus | stlpr.org (opens in a new tab) | |
| Ferguson | Ferguson City Council voted 4-3 to give tax incentives for a tech hub and data center at the former Emerson campus | stltoday.com (opens in a new tab) | |
| Ferguson | Ferguson City Council voted 4-3 to approve a $1.8 billion data center hub project for a 217 acre former Emerson Electric campus on September 22, 2026. | yahoo.com (opens in a new tab) | |
| Ferguson | Onder has agreed to donate $7.5 million to the Ferguson Neighborhood Improvement Program if the city approves incentives. | stltoday.com (opens in a new tab) | |
| Ferguson | City Council will vote Tuesday night on a proposal to give $1.5 billion in tax incentives to developer Jim Onder to turn the 218 acre Emerson campus into a center for technology, energy innovation, advanced manufacturing and research. | stltoday.com (opens in a new tab) | |
| Ferguson | The proposal requires the developer to pay Ferguson Neighborhood Improvement Program $7.5 million over 10 years | stlpr.org (opens in a new tab) |
7 earlier decisions on the county's rows
| Date | Who | Decision | Source |
|---|---|---|---|
| Ferguson | Ferguson councilmembers reintroduced legislation Wednesday for $1.5 billion in tax incentives and up to $22 billion in industrial revenue bonds for the Emerson campus data center redevelopment | stlpr.org (opens in a new tab) | |
| Ferguson | Ferguson City Council voted 3-3 with one abstention on a data center tax break proposal in May 2026 | stlpr.org (opens in a new tab) | |
| St. Louis County | St. Louis County has held several public hearings on data centers since May 2026. | aol.com (opens in a new tab) | |
| St. Louis County | The largest data center facilities would be restricted to industrial districts and would require a conditional use permit or rezoning process. | aol.com (opens in a new tab) | |
| St. Louis County | St. Louis County has established a draft framework with four categories of data centers - micro, small, standard, and major - with requirements increasing by power demands and community impacts. | aol.com (opens in a new tab) | |
| St. Louis County | St. Louis County Executive Sam Page and county leaders addressed data center concerns on Tuesday. | aol.com (opens in a new tab) | |
| St. Louis County | St. Louis County is considering data center guidelines | spectrumlocalnews.com (opens in a new tab) |
August 28, 2026 St. Louis, MO St. Louis Board of Aldermen Board Bill 49 Data Center Regulations Vote
On August 28, 2026, the St. Louis Board of Aldermen voted unanimously to advance Board Bill 49, establishing the city's first comprehensive zoning, conditional use, water disclosure, and noise regulations for data centers.
- St. Louis Board of Aldermen Elected Official auto captions, unchecked
"IT ESTABLISHES SIZE CLASSIFICATIONS FOR DATA CENTERS. RESTRICTIONS ON WHERE THEY CAN BE BUILT. NOISE, REGULATIONS AND WATER USE ITS GUIDELINES. THE MEASURE ALSO REQUIRES NEW DATA CENTERS WITH LOADS EXCEEDING 5 MEGAWATTS TO GIVE 100% OF THEIR ELECTRICITY FROM RENEWABLE ENERGY SOURCES. THE BILL IS SPONSORED BY FIRST WARD ALDERWOMAN AND SCHWEITZER. >> THIS IS ALL ABOUT"
- Resident public comment Resident Public Comment auto captions, unchecked
"LOT OF CONCERNS ABOUT THE PROLIFERATION OF DATA CENTERS AND THE AMOUNT OF ENERGY THAT THEY USE AND WILL CONTINUE TO USE AND THE EFFECT. >> ON OUR ON OUR CLIMATE, ON ON ENVIRONMENT, ON OUR ABILITY TO EXIST IN THIS WORLD. SO >> I THINK IT'S REALLY IMPORTANT THAT WE IN THE LOCAL LEVEL ACT TO PROTECT THE PEOPLE WE REPRESENT. EVEN IF THAT MEANS FIGHTING AGAINST SOME PRETTY POWERFUL INTERESTS."
Using this data in a report? Support the record.
June 15, 2026 Wildwood, MO De Soto data center concerns: Leaders discuss solutions for noise pollution
In Wildwood, St. Louis County (MO), Wildwood City Council and local residents debated municipal data center siting, utility infrastructure load, water consumption, and zoning rules during the June 15, 2026 session.
- Wildwood City Council Officials and Speakers Elected Official auto captions, unchecked
"IT’S THE SITE OF A NEW $3 BILLION DATA CENTER, WITH CONSTRUCTION TAKING PLACE OVER THE NEXT NINE YEARS. DE SOTO CITY COUNCILMAN ZACK BRADLEY IS CONCERNED NOISE COULD BE HARMFUL TO HUMAN HEALTH. HE’S LOOKING INTO THE POSSIBILITY OF CHANGING THE CITY’S ORDINANCE TO MAKE SURE THE DEVELOPER, BEAL INFRASTRUCTURE, PROTECTS THE PUBLIC. I THINK THEY CAN MITIGATE SOUND POLLUTION SEVERAL WAYS."
- Resident public comment Resident Public Comment auto captions, unchecked
"MOST DESOTO RESIDENTS LIVE NORTH OF THAT HIGHWAY. FOR THAT REASON, IT’S UNLIKE THE SPRING HILL AND GARDNER NOW WITHDRAWN PLANS. THOSE PROPOSALS WOULD HAVE USED LARGELY AGRICULTURAL LAND CLOSE TO RESIDENTIAL PROPERTY. AND IT’S LARGELY SEPARATED FROM RESIDENTIAL AREAS AND OTHER DEVELOPMENTS, SO IT’S A GOOD FIT. MUCH LIKE THE INDEPENDENCE DATA CENTER PLAN, THERE’S A PROPERTY TAX ABATEMENT, BUT THE DEVELOPERS HAVE A PAYMENT IN LIEU OF TAXES OR PILOT DESIGNED TO HELP DE SOTO SCHOOLS."
Using this data in a report? Support the record.
What happened
No dated entry is on the record yet.
-
Read on October 27, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from Missouri state agency permits, utility dockets, municipal planning filings, or operator campus specifications.
The site
The pin is the site's address.
- Where
- 2315 Millpark Drive, Maryland Heights, MO 63043, Maryland Heights, St. Louis County, Missouri [1] tierpoint.com (opens in a new tab)
- How exactly it is located
- Exact, at the address
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Oppidan Berkeley Data Center Campus, 5.9 mi
- St. Louis Armory Data Center Proposal, 10 mi
- St. Louis Midtown Chouteau Data Center Proposal, 11 mi
- 710 North Tucker Carrier Hotel (Globe Building St. Louis), 13 mi
- Netrality and Digital Realty 210 North Tucker Carrier Hotel, 13 mi
Keep going
Questions about this project
5 questions answered from the record
How big is TierPoint St. Louis Millpark Data Center (Maryland Heights)?
-
The record has 2 measures of its size: 6 MW (the developer's figure, tierpoint.com (opens in a new tab)) and 1 building (operator page, verified October 27, 2026, tierpoint.com (opens in a new tab)). Its acreage is not disclosed.
Who is building TierPoint St. Louis Millpark Data Center (Maryland Heights)?
-
TierPoint is the developer. No construction contractor is named on the record yet.
How much power and water does TierPoint St. Louis Millpark Data Center (Maryland Heights) say it needs?
-
Power: 6 MW (the developer's figure, tierpoint.com (opens in a new tab)). Water: not disclosed by any source on file.
Where does TierPoint St. Louis Millpark Data Center (Maryland Heights) stand today?
-
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
What has Maryland Heights or St. Louis County decided about it?
-
Ferguson (rated case by case): Ferguson City Council voted 4-3 to approve tax incentives and redevelopment plan for data center at former Emerson campus (reported September 23, 2026, stlpr.org (opens in a new tab)); and Ferguson: Ferguson City Council voted 4-3 to give tax incentives for a tech hub and data center at the former Emerson campus (reported September 23, 2026, stltoday.com (opens in a new tab)). 13 events are on the county's rows; a rule about the area is not a decision about this record.
Sources
Reporting
- TierPoint St. Louis Millpark Data Center (Maryland Heights) Official Disclosure (opens in a new tab), TierPoint, query feed
1 source on file.
About this data
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about TierPoint St. Louis Millpark Data Center (Maryland Heights)
Cite this page
Data Center Record, "TierPoint St. Louis Millpark Data Center (Maryland Heights)", https://datacenterrecord.org/projects/tierpoint-llc-tierpoint-st-louis-millpark-maryland-heights-mo. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
For researchers
- Stage
- Running
- Tier
- built from one source
- Tags
- Built from one source
- Coordinates
- 38.698612, -90.411954
- How the location is known
- Location from the site's street address.
- Location source
- https://www.tierpoint.com/data-centers/missouri/st-louis/
- Coordinate source
- TierPoint Maryland Heights Millpark specification
- How capacity was disclosed
- the developer's figure
- Capacity, if disclosed
- 6 MW, the developer's figure
- Rating of the county's rows
- Case by case
- Published
- October 21, 2026
- Last verified
- October 27, 2026
- Undisclosed in public filings
- Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection