Data Center Record.

Running Built from one source

Microsoft West Des Moines Data Center Campuses (Alluvion, Osmium, Ginger, Ruthenium, and Maple)

West Des Moines, Polk County, IADeveloper: MicrosoftCensus GEOID 19153

Stage
Running
Power
500 MW
the developer's figure
Buildings
16 buildings
agency filing, verified October 27, 2026
Undisclosed in public filings
Land, Water

Microsoft operates and is expanding five hyperscale data center campuses (Project Alluvion, Project Osmium, Project Ginger, Project Ruthenium, and Project Maple) across 16 buildings in West Des Moines, Polk and Dallas Counties, Iowa. It is running, since May 15, 2025.

How much water it would use and who would use it have not been disclosed.

1 hearing on the record, 2026

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Running, ringed
  • data center
  • Smaller pins: 25 other published records in Iowa
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
16 buildings agency filing, verified October 27, 2026
Power it would draw
500 MW the developer's figure About 5 percent of New York City's summer peak demand in 2024.
Who leads it
Microsoft as stated by the source
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Microsoft West Des Moines Data Center Campuses (Alluvion, Osmium, Ginger, Ruthenium, and Maple), capacity: 500 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 500 ÷ 10,245 = 0.05 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 500 MW the developer's figure iowaeda.com (opens in a new tab) October 27, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Microsoft as stated by the source October 27, 2026
Who is constructing it
How much land
Buildings 16 buildings agency filing, verified October 27, 2026 iowaeda.com (opens in a new tab) October 27, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Polk County and West Des Moines about data centers, on the record with their source. A rule about the area is not a decision about this record.

June 15, 2026 West Des Moines, IA Norwalk City Council sees push back on proposed data center West Des Moines City Council 2clips

In West Des Moines, Polk County (IA), West Des Moines City Council and local residents debated municipal data center siting, utility infrastructure load, water consumption, and zoning rules during the June 15, 2026 session.

  1. West Des Moines City Council Officials and Speakers Elected Official auto captions, unchecked
    "pollution, and power usage. One resident telling Local 5 he feels the city has been trying to hide the project from the public. One of my kids that lives in Norwalk sent me a text, hey, did you read this article in the newspaper in Indianola about the meeting next Thursday? And I'm like, what meeting? And so as I started to dig into it, I'm like, there was no information. The council's going to vote on a deal with the developers. Nobody"
  2. Resident public comment Resident Public Comment auto captions, unchecked
    "employees. The city does clarify that tonight's vote does not approve or authorize any data center to be built. It simply begins talks between Norwalk and the land developer."

What happened

  1. · Status: running (content date)

    Microsoft owns over 600 acres in West Des Moines with five data center campuses operational since 2012 and a sixth approved by city council agreement, having invested an estimated 5 to 6 billion dollars in the area.

    [1] wpr.org

The full Microsoft West Des Moines Data Center Campuses (Alluvion, Osmium, Ginger, Ruthenium, and Maple) timeline, in order

The site

The pin is the site's address.

The site map is at the top of the page.

Where
8855 Grand Avenue and Veterans Parkway, West Des Moines, IA 50266, West Des Moines, Polk County, Iowa [source] (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Microsoft West Des Moines Data Center Campuses (Alluvion, Osmium, Ginger, Ruthenium, and Maple)
LAT 41.54850 / LON -93.81240 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Microsoft West Des Moines Data Center Campuses (Alluvion, Osmium, Ginger, Ruthenium, and Maple)?

The record has 2 measures of its size: 500 MW (the developer's figure, iowaeda.com (opens in a new tab)) and 16 buildings (agency filing, verified October 27, 2026, iowaeda.com (opens in a new tab)). Its acreage is not disclosed.

Who is building Microsoft West Des Moines Data Center Campuses (Alluvion, Osmium, Ginger, Ruthenium, and Maple)?

Microsoft is the developer. No construction contractor is named on the record yet.

How much power and water does Microsoft West Des Moines Data Center Campuses (Alluvion, Osmium, Ginger, Ruthenium, and Maple) say it needs?

Power: 500 MW (the developer's figure, iowaeda.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Microsoft West Des Moines Data Center Campuses (Alluvion, Osmium, Ginger, Ruthenium, and Maple) stand today?

It is running, since May 15, 2025. The newest entry, May 15, 2025: Microsoft owns over 600 acres in West Des Moines with five data center campuses operational since 2012 and a sixth approved by city council agreement, having invested an estimated 5 to 6 billion dollars in the area. [1]

What has West Des Moines or Polk County decided about it?

No decision by West Des Moines or Polk County about data centers is on the record. The Polk County page and the Iowa scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Microsoft built 5 data center campuses in this Iowa city. Here’s what Wisconsin can expect. - WPR (opens in a new tab), WPR, May 15, 2025, query feed

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Microsoft West Des Moines Data Center Campuses (Alluvion, Osmium, Ginger, Ruthenium, and Maple)", https://datacenterrecord.org/projects/microsoft-west-des-moines-data-centers-ia, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Microsoft West Des Moines Data Center Campuses (Alluvion, Osmium, Ginger, Ruthenium, and Maple)", https://datacenterrecord.org/projects/microsoft-west-des-moines-data-centers-ia. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
41.5485, -93.8124
How the location is known
Location from the site's street address.
Location source
https://www.iowaeda.com/
Coordinate source
IEDA High Quality Jobs filings and West Des Moines GIS parcels
How capacity was disclosed
the developer's figure
Capacity, if disclosed
500 MW, the developer's figure
Published
September 27, 2026
Last verified
October 27, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Microsoft West Des Moines Data Center Campuses (Alluvion, Osmium, Ginger, Ruthenium, and Maple) · 1 source, 1 entry, 0 decisions nearby · basis and source tier on every row · verified October 27, 2026

Download CSV JSON