US Signal and OneNeck Des Moines Data Center (IA01 Waukee)
Waukee, Dallas County, IADeveloper: US Signal / OneNeck IT SolutionsCensus GEOID 19049
- Stage
- Running
- Undisclosed in public filings
- Land, Water
US Signal and OneNeck IT Solutions operate the IA01 Tier III commercial colocation data center at 390 NE Alices Road in Waukee, Dallas County, Iowa. It is running; the record holds no sourced date for when it reached that stage.
How much water it would use and who would use it have not been disclosed.
Tap a pin for the data center, the parcel for its record
- This record: Running, ringed
- data center
- Smaller pins: 25 other published records in Iowa
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Power it would draw
- 6 MW the developer's figure About 0 percent of New York City's summer peak demand in 2024.
- [1] ussignal.com
- Who leads it
- US Signal / OneNeck IT Solutions as stated by the source
- Undisclosed in public filings
- Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
- US Signal and OneNeck Des Moines Data Center (IA01 Waukee), capacity: 6 MW.
- New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
- 6 ÷ 10,245 = 0 (MW over MW).
Sources:
- US Signal / OneNeck IT Solutions (opens in a new tab)
- NYISO, 2025 Load and Capacity Data Report (Gold Book) (opens in a new tab), Table I-4a, Baseline Summer Non-Coincident Peak Demand, Historical and Forecast, page 26, Zone J, 2024 row (2024)
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | 6 MW | the developer's figure | [1] ussignal.com (opens in a new tab) | October 27, 2026 |
| How much water it would use | ||||
| How loud it would be | ||||
| Jobs once it runs | ||||
| Tax it would pay each year |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | US Signal / OneNeck IT Solutions | as stated by the source | October 27, 2026 | |
| Who is constructing it | ||||
| How much land | ||||
| Buildings | 1 building | operator page, verified October 27, 2026 | [1] ussignal.com (opens in a new tab) | October 27, 2026 |
| Where its power comes from | ||||
| Grid connection | ||||
| How it is cooled |
A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water use A state water right filing or a water supply agreement.
- Who would use it A lease announcement or a tenant named in a filing.
- Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.
What was decided
Acts of Dallas County and Waukee about data centers, on the record with their source. A rule about the area is not a decision about this record.
August 25, 2022 Waukee, IA Apple data center property tax valuation error costs Waukee schools $2.3M, city $3M
Waukee City Council and Dallas County Assessor public record on the Apple data center property tax abatement valuation error that reduced Waukee school and municipal revenue by $5.3 million (August 25, 2022).
- Waukee City Council Hearing Speaker Developer Representative transcribed from the official recording
"IT WAS CONCERNING, RIGHT? PROBABLY OTHER WORDS THAT ARE MORE STARTLING IN MY MIND. WAUKEE SCHOOL SUPERINTENDENT DOCTOR BRAD BUCK SAYS HE CAN’T SAY SOME OF THOSE WORDS ON TV, BUT THEY DID CROSS HIS MIND WHEN HE FOUND OUT HIS BUDGET WILL LOSE MORE THAN $2 MILLION THIS YEAR. THIS IS JUST A CRAZY, UNUSUAL THING THAT THE TOTAL VALUATION OF YOUR DISTRICT WOULD CHANGE MIDSTREAM. BUCK SAYS HE FIRST HEARD THE BAD NEWS A FEW WEEKS AGO. HE SAYS ORIGINALLY, DALLAS COUNTY VALUED THE NEW APPLE DATA CENTER ON THE WEST EDGE OF WAUKEE AT $192 MILLION FOR TAX PURPOSES, BUT SCHOOL LEADERS SAY THEY RECENTLY FOUND OUT THE"
- Waukee City Council Hearing Speaker Elected Official transcribed from the official recording
"VALUATION IS MORE LIKE $60 MILLION. THAT MEANS THE SCHOOL DISTRICT WILL LOSE $2.3 MILLION FROM THE BUDGET, SINCE THAT MONEY IS ALREADY IN THE BUDGET, BUCK SAYS THEY WILL HAVE TO CUT SOME FUTURE PROGRAMS. HE SAYS CURRENT STAFF AND SCHOOL PROGRAMS WILL NOT BE AFFECTED. IT’S GOING TO COME THIS MOMENT WHERE WE’RE GOING TO BE SITUATED TO DO A LITTLE DREAMING AND REALLY EXPAND SOME OPPORTUNITIES, EXPERIENCES FOR KIDS. AND NOW THAT’S AT LEAST ON HOLD FOR ANOTHER YEAR. WE’RE ALSO LEARNING THE CITY OF WAUKEE WILL LOSE MORE THAN $3 MILLION FROM ITS BUDGET AFTER THE APPLE DATA CENTER VALUE CHANGE."
- Resident public comment Resident Public Comment transcribed from the official recording
"THE CITY HAS A RESERVE FUND TO COVER SOME OF THOSE LOSSES. IT ALL PROBABLY AFFECTS SOME PROJECTS IN OUR CAPITAL IMPROVEMENT PROJECTS TIMELINE. SO LIKE INFRASTRUCTURE, LIKE ROADS, EXACTLY WHAT. YET WE HAVE TO DETERMINE. NOW, BUCK SAYS HE PLANS TO ASK STATE LAWMAKERS TO GET SOME OF THAT LOST FUNDING BACK. HE SAYS THE DISTRICT IS ALSO DISCUSSING ITS LEGAL OPTIONS IN THIS CASE. BY THE WAY, WE HAVE REACHED OUT TO DALLAS COUNTY. WE’RE WAITI"
Using this data in a report? Support the record.
What happened
No dated entry is on the record yet.
-
Read on October 27, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications.
The site
The pin is the site's address.
- Where
- 390 NE Alices Road, Waukee, IA 50263, Waukee, Dallas County, Iowa [1] ussignal.com (opens in a new tab)
- How exactly it is located
- Exact, at the address
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Apple Waukee Data Center Campus, 2.7 mi
- IP Pathways Urbandale Data Center (DSM1), 4.5 mi
- Microsoft West Des Moines Data Center Campuses (Alluvion, Osmium, Ginger, Ruthenium, and Maple), 5.2 mi
- Aureon West Des Moines Data Center, 6.7 mi
- Microsoft Van Meter Data Center Campus, 7.1 mi
Keep going
Questions about this project
5 questions answered from the record
How big is US Signal and OneNeck Des Moines Data Center (IA01 Waukee)?
-
The record has 2 measures of its size: 6 MW (the developer's figure, ussignal.com (opens in a new tab)) and 1 building (operator page, verified October 27, 2026, ussignal.com (opens in a new tab)). Its acreage is not disclosed.
Who is building US Signal and OneNeck Des Moines Data Center (IA01 Waukee)?
-
US Signal / OneNeck IT Solutions is the developer. No construction contractor is named on the record yet.
How much power and water does US Signal and OneNeck Des Moines Data Center (IA01 Waukee) say it needs?
-
Power: 6 MW (the developer's figure, ussignal.com (opens in a new tab)). Water: not disclosed by any source on file.
Where does US Signal and OneNeck Des Moines Data Center (IA01 Waukee) stand today?
-
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
What has Waukee or Dallas County decided about it?
-
No decision by Waukee or Dallas County about data centers is on the record. The Dallas County page and the Iowa scorecard list every rated row the day a person publishes one.
Sources
Reporting
- US Signal and OneNeck Des Moines Data Center (IA01 Waukee) Official Disclosure (opens in a new tab), US Signal / OneNeck IT Solutions, query feed
1 source on file.
About this data
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about US Signal and OneNeck Des Moines Data Center (IA01 Waukee)
Cite this page
Data Center Record, "US Signal and OneNeck Des Moines Data Center (IA01 Waukee)", https://datacenterrecord.org/projects/oneneck-it-solutions-llc-us-signal-ia01-des-moines-waukee-ia. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
For researchers
- Stage
- Running
- Tier
- built from one source
- Tags
- Built from one source
- Coordinates
- 41.6168, -93.8542
- How the location is known
- Location from the site's street address.
- Location source
- https://ussignal.com/
- Coordinate source
- US Signal IA01 Waukee specification
- How capacity was disclosed
- the developer's figure
- Capacity, if disclosed
- 6 MW, the developer's figure
- Published
- October 21, 2026
- Last verified
- October 27, 2026
- Undisclosed in public filings
- Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows