EdgeCore Silicon Valley Laurelwood Data Center Campus
Santa Clara, Santa Clara County, CADeveloper: EdgeCore Digital InfrastructureCensus GEOID 06085
- Stage
- Running
- Undisclosed in public filings
- Land, Water
EdgeCore Digital Infrastructure operates a 2 building, 72 MW hyperscale data center campus at 2201 Laurelwood Road in Santa Clara, Santa Clara County, California, approved under California Energy Commission Docket 19 SPPE 03. It is running; the record holds no sourced date for when it reached that stage.
How much water it would use and who would use it have not been disclosed.
Tap a pin for the data center, the parcel for its record
- This record: Running, ringed
- data center
- Smaller pins: 68 other published records in California
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Power it would draw
- 72 MW the developer's figure About 1 percent of New York City's summer peak demand in 2024.
- [1] edgecore.com
- Who leads it
- EdgeCore Digital Infrastructure as stated by the source
- Undisclosed in public filings
- Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
- EdgeCore Silicon Valley Laurelwood Data Center Campus, capacity: 72 MW.
- New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
- 72 ÷ 10,245 = 0.01 (MW over MW).
Sources:
- EdgeCore Digital Infrastructure (opens in a new tab)
- NYISO, 2025 Load and Capacity Data Report (Gold Book) (opens in a new tab), Table I-4a, Baseline Summer Non-Coincident Peak Demand, Historical and Forecast, page 26, Zone J, 2024 row (2024)
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | 72 MW | the developer's figure | [1] edgecore.com (opens in a new tab) | October 27, 2026 |
| How much water it would use | ||||
| How loud it would be | ||||
| Jobs once it runs | ||||
| Tax it would pay each year |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | EdgeCore Digital Infrastructure | as stated by the source | October 27, 2026 | |
| Who is constructing it | ||||
| How much land | ||||
| Buildings | 2 buildings | permit filing, verified October 27, 2026 | [1] edgecore.com (opens in a new tab) | October 27, 2026 |
| Where its power comes from | ||||
| Grid connection | ||||
| How it is cooled |
A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water use A state water right filing or a water supply agreement.
- Who would use it A lease announcement or a tenant named in a filing.
- Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.
What was decided
Acts of Santa Clara County and Santa Clara about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| San Jose | Santa Clara City is pushing for a plan to require large customers such as data centers to reduce power use when power is scarce | mk.co.kr (opens in a new tab) | |
| Santa Clara County | Santa Clara County Sustainability Committee discussed moratorium suspending permits for new data centers for a certain period, strengthening disclosure of resource use, and gap analysis | mk.co.kr (opens in a new tab) | |
| Gilroy | Gilroy approved 45 day moratorium on data center applications | kalw.org (opens in a new tab) | |
| Gilroy | The moratorium could potentially be extended for up to two years. | mercurynews.com (opens in a new tab) | |
| Gilroy | Gilroy City Council approved a temporary moratorium on new data center applications effective immediately for at least 45 days. | mercurynews.com (opens in a new tab) | |
| Morgan Hill | Morgan Hill City Council adopted a temporary moratorium on data centers and battery storage facilities while staff develops possibly permanent guidelines | gilroydispatch.com (opens in a new tab) |
6 earlier decisions on the county's rows
| Date | Who | Decision | Source |
|---|---|---|---|
| Gilroy | The moratorium would not affect the Amazon data center already approved and under construction on Camino Arroyo | gilroydispatch.com (opens in a new tab) | |
| Gilroy | Approved interim urgency ordinances remain in place for 45 days unless renewed by the council, then can be renewed for an additional 10 months and 15 days, and again for another 12 months if needed | gilroydispatch.com (opens in a new tab) | |
| Gilroy | The moratorium would allow the city to review and update design and development standards that would apply to data centers and other industrial developments | gilroydispatch.com (opens in a new tab) | |
| Gilroy | Gilroy City Council will consider adopting a temporary moratorium on new data centers at its Sept. 14 meeting | gilroydispatch.com (opens in a new tab) | |
| San Jose | San Jose residents push for data center moratorium | sanjosespotlight.com (opens in a new tab) | |
| San Jose | San Jose is considering data center development amid resident environmental concerns | kqed.org (opens in a new tab) |
September 29, 2026 Santa Clara, CA Oakland City Council tackles proposed moratorium on new data centers
At a September 29, 2026 Santa Clara City Council forum, council candidates and officials debated how the city's 55+ active and planned data centers impact Silicon Valley Power grid upgrades and residential electricity rates.
- Santa Clara City Council Applicant and Economic Development Presentation Developer Representative auto captions, unchecked
"Hamilton was there as they got ready to take their concerns to the city council. >> What to do with AI data centers is a topic of conversation taking place in cities across the country. Tonight, it's Oakland's turn. And they have a chance to decide whether to press pause on the critical part of the AI boom. >> Our water! >> Our right! >> Our water! >> Our right! >> When I say act up, >> Data centers are moving into the"
- Santa Clara City Council Official Deliberation Elected Official auto captions, unchecked
"before approving projects. And on Tuesday, Oakland City Council weighed in. >> Data center hardware is quickly building up around the country and we need to study it. >> Council member Sheng Thao is among city leaders pushing for a closer look, advocating for a 45 day moratorium on approving any data center projects. >> But in addition, what I want is by the time that we get to the end of those 45"
- Resident public comment Resident Public Comment auto captions, unchecked
"uh local impacts. >> And Thao is not alone. Council member Sheng Thao for the moratorium despite knowing the potential economic implications of pressing pause. >> Again, we want industry in Oakland. We want jobs created in Oakland. We want economic development. We want these streets outside City Hall to be full of people and full of businesses and filled up storefronts. But we can't invite"
Using this data in a report? Support the record.
August 19, 2026 San Jose, CA City of San Jose Data Centers and Large Energy Projects Community Session
On August 19, 2026, the City of San Jose hosted an official public hearing on data centers and large energy projects to establish municipal regulations on grid capacity, backup diesel generators, and water efficiency.
- City of San Jose Administration Official Board & Planning Staff auto captions, unchecked
"data center might mean. And that's why we're holding this session because community input helps guide what our priorities are, what our regulations are, what the rules of the road are in San Jose. And I want to be really clear, we are not here tonight to persuade you to be pro- data center. That is not the point of this. The goal of tonight is to understand what your concerns are and"
- Resident public comment Resident Public Comment auto captions, unchecked
"industrial land and want to consider a data center project and more importantly with the entire community what the standards are. And my view is that if a data center gets built in San Jose in the future, it ought to be under the strongest standards around labor, environment, both protecting rateayers"
- City of San Jose Office of the City Manager Member Elected Official auto captions, unchecked
"beginning of our process. This is our first community listening session. As uh I mentioned we are in a process of developing regulations to cover all of those areas of concern. But unless we first start by hearing from you and understanding what those concerns are and really teasing out the details and what your experience is, we won't have the best possible regulatory environment. So, I'm looking forward to kicking this off. I'm going to introduce"
Using this data in a report? Support the record.
What happened
No dated entry is on the record yet.
-
Read on October 27, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from California state agency permits, utility dockets, municipal planning filings, or operator campus specifications.
The site
The pin is the site's address.
- Where
- 2201 Laurelwood Road, Santa Clara, CA 95054, Santa Clara, Santa Clara County, California [1] edgecore.com (opens in a new tab)
- How exactly it is located
- Exact, at the address
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Intel Corporation Data Center, 0.5 mi
- Equinix Santa Clara Campus (SV2, SV14, SV15, SV16, and SV17), 0.6 mi
- Digital Realty Santa Clara Silicon Valley Campus (SJC10 through SJC37), 0.7 mi
- Vantage Data Centers Santa Clara Campus (CA1 and CA3), 0.9 mi
- Centersquare Silicon Valley Santa Clara Campus (SFO1 and SFO2), 0.9 mi
Keep going
Questions about this project
5 questions answered from the record
How big is EdgeCore Silicon Valley Laurelwood Data Center Campus?
-
The record has 2 measures of its size: 72 MW (the developer's figure, edgecore.com (opens in a new tab)) and 2 buildings (permit filing, verified October 27, 2026, edgecore.com (opens in a new tab)). Its acreage is not disclosed.
Who is building EdgeCore Silicon Valley Laurelwood Data Center Campus?
-
EdgeCore Digital Infrastructure is the developer. No construction contractor is named on the record yet.
How much power and water does EdgeCore Silicon Valley Laurelwood Data Center Campus say it needs?
-
Power: 72 MW (the developer's figure, edgecore.com (opens in a new tab)). Water: not disclosed by any source on file.
Where does EdgeCore Silicon Valley Laurelwood Data Center Campus stand today?
-
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
What has Santa Clara or Santa Clara County decided about it?
-
San Jose: Santa Clara City is pushing for a plan to require large customers such as data centers to reduce power use when power is scarce (reported September 17, 2026, mk.co.kr (opens in a new tab)); and Santa Clara County: Santa Clara County Sustainability Committee discussed moratorium suspending permits for new data centers for a certain period, strengthening disclosure of resource use, and gap analysis (reported September 17, 2026, mk.co.kr (opens in a new tab)). 12 events are on the county's rows; a rule about the area is not a decision about this record.
Sources
Reporting
- EdgeCore Silicon Valley Laurelwood Data Center Campus Official Disclosure (opens in a new tab), EdgeCore Digital Infrastructure, query feed
1 source on file.
About this data
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about EdgeCore Silicon Valley Laurelwood Data Center Campus
Cite this page
Data Center Record, "EdgeCore Silicon Valley Laurelwood Data Center Campus", https://datacenterrecord.org/projects/edgecore-digital-infrastructure-edgecore-silicon-valley-santa-clara-ca. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
For researchers
- Stage
- Running
- Tier
- built from one source
- Tags
- Built from one source
- Coordinates
- 37.3812, -121.9585
- How the location is known
- Location from the site's street address.
- Location source
- https://edgecore.com/locations/silicon-valley/
- Coordinate source
- CEC Laurelwood Data Center SPPE Docket 19-SPPE-03 / EdgeCore specification
- How capacity was disclosed
- the developer's figure
- Capacity, if disclosed
- 72 MW, the developer's figure
- Rating of the county's rows
- Restrictive
- Published
- October 21, 2026
- Last verified
- October 27, 2026
- Undisclosed in public filings
- Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection