Centersquare Silicon Valley Santa Clara Campus (SFO1 and SFO2)

Santa Clara, Santa Clara County, CADeveloper: CentersquareCensus GEOID 06085

Stage
Running
Power
43 MW
the developer's figure
Buildings
2 buildings
operator page, verified October 27, 2026
Undisclosed in public filings
Land, Water

Centersquare operates a 2 building Silicon Valley colocation campus (SFO1 on Walsh Avenue and SFO2 on Old Ironsides Drive) in Santa Clara, Santa Clara County, California, with 43 MW of capacity. It is running; the record holds no sourced date for when it reached that stage.

How much water it would use and who would use it have not been disclosed.

2 hearings on the record, 2026

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Running, ringed
  • data center
  • Smaller pins: 68 other published records in California
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
2 buildings operator page, verified October 27, 2026
[1] csquare.com
Power it would draw
43 MW the developer's figure About 0 percent of New York City's summer peak demand in 2024.
[1] csquare.com
Who leads it
Centersquare as stated by the source
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Centersquare Silicon Valley Santa Clara Campus (SFO1 and SFO2), capacity: 43 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 43 ÷ 10,245 = 0 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 43 MW the developer's figure [1] csquare.com (opens in a new tab) October 27, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Centersquare as stated by the source October 27, 2026
Who is constructing it
How much land
Buildings 2 buildings operator page, verified October 27, 2026 [1] csquare.com (opens in a new tab) October 27, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Santa Clara County and Santa Clara about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
San Jose Santa Clara City is pushing for a plan to require large customers such as data centers to reduce power use when power is scarce mk.co.kr (opens in a new tab)
Santa Clara County Santa Clara County Sustainability Committee discussed moratorium suspending permits for new data centers for a certain period, strengthening disclosure of resource use, and gap analysis mk.co.kr (opens in a new tab)
Gilroy restrictive Gilroy approved 45 day moratorium on data center applications kalw.org (opens in a new tab)
Gilroy restrictive The moratorium could potentially be extended for up to two years. mercurynews.com (opens in a new tab)
Gilroy restrictive Gilroy City Council approved a temporary moratorium on new data center applications effective immediately for at least 45 days. mercurynews.com (opens in a new tab)
Morgan Hill restrictive Morgan Hill City Council adopted a temporary moratorium on data centers and battery storage facilities while staff develops possibly permanent guidelines gilroydispatch.com (opens in a new tab)
6 earlier decisions on the county's rows
DateWhoDecisionSource
Gilroy restrictive The moratorium would not affect the Amazon data center already approved and under construction on Camino Arroyo gilroydispatch.com (opens in a new tab)
Gilroy restrictive Approved interim urgency ordinances remain in place for 45 days unless renewed by the council, then can be renewed for an additional 10 months and 15 days, and again for another 12 months if needed gilroydispatch.com (opens in a new tab)
Gilroy restrictive The moratorium would allow the city to review and update design and development standards that would apply to data centers and other industrial developments gilroydispatch.com (opens in a new tab)
Gilroy restrictive Gilroy City Council will consider adopting a temporary moratorium on new data centers at its Sept. 14 meeting gilroydispatch.com (opens in a new tab)
San Jose San Jose residents push for data center moratorium sanjosespotlight.com (opens in a new tab)
San Jose San Jose is considering data center development amid resident environmental concerns kqed.org (opens in a new tab)
September 29, 2026 Santa Clara, CA Oakland City Council tackles proposed moratorium on new data centers Santa Clara City Council 3clips

At a September 29, 2026 Santa Clara City Council forum, council candidates and officials debated how the city's 55+ active and planned data centers impact Silicon Valley Power grid upgrades and residential electricity rates.

  1. Santa Clara City Council Applicant and Economic Development Presentation Developer Representative auto captions, unchecked
    "Hamilton was there as they got ready to take their concerns to the city council. >> What to do with AI data centers is a topic of conversation taking place in cities across the country. Tonight, it's Oakland's turn. And they have a chance to decide whether to press pause on the critical part of the AI boom. >> Our water! >> Our right! >> Our water! >> Our right! >> When I say act up, >> Data centers are moving into the"
  2. Santa Clara City Council Official Deliberation Elected Official auto captions, unchecked
    "before approving projects. And on Tuesday, Oakland City Council weighed in. >> Data center hardware is quickly building up around the country and we need to study it. >> Council member Sheng Thao is among city leaders pushing for a closer look, advocating for a 45 day moratorium on approving any data center projects. >> But in addition, what I want is by the time that we get to the end of those 45"
  3. Resident public comment Resident Public Comment auto captions, unchecked
    "uh local impacts. >> And Thao is not alone. Council member Sheng Thao for the moratorium despite knowing the potential economic implications of pressing pause. >> Again, we want industry in Oakland. We want jobs created in Oakland. We want economic development. We want these streets outside City Hall to be full of people and full of businesses and filled up storefronts. But we can't invite"
August 19, 2026 San Jose, CA City of San Jose Data Centers and Large Energy Projects Community Session City of San Jose Office of the City Manager 3clips

On August 19, 2026, the City of San Jose hosted an official public hearing on data centers and large energy projects to establish municipal regulations on grid capacity, backup diesel generators, and water efficiency.

  1. City of San Jose Administration Official Board & Planning Staff auto captions, unchecked
    "data center might mean. And that's why we're holding this session because community input helps guide what our priorities are, what our regulations are, what the rules of the road are in San Jose. And I want to be really clear, we are not here tonight to persuade you to be pro- data center. That is not the point of this. The goal of tonight is to understand what your concerns are and"
  2. Resident public comment Resident Public Comment auto captions, unchecked
    "industrial land and want to consider a data center project and more importantly with the entire community what the standards are. And my view is that if a data center gets built in San Jose in the future, it ought to be under the strongest standards around labor, environment, both protecting rateayers"
  3. City of San Jose Office of the City Manager Member Elected Official auto captions, unchecked
    "beginning of our process. This is our first community listening session. As uh I mentioned we are in a process of developing regulations to cover all of those areas of concern. But unless we first start by hearing from you and understanding what those concerns are and really teasing out the details and what your experience is, we won't have the best possible regulatory environment. So, I'm looking forward to kicking this off. I'm going to introduce"

What happened

No dated entry is on the record yet.

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from California state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] csquare.com

The site

The pin is the site's address.

The site map is at the top of the page.

Where
2401 Walsh Avenue and 4700 Old Ironsides Drive, Santa Clara, CA 95051, Santa Clara, Santa Clara County, California [1] csquare.com (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Centersquare Silicon Valley Santa Clara Campus (SFO1 and SFO2)
LAT 37.37180 / LON -121.96980 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Centersquare Silicon Valley Santa Clara Campus (SFO1 and SFO2)?

The record has 2 measures of its size: 43 MW (the developer's figure, csquare.com (opens in a new tab)) and 2 buildings (operator page, verified October 27, 2026, csquare.com (opens in a new tab)). Its acreage is not disclosed.

Who is building Centersquare Silicon Valley Santa Clara Campus (SFO1 and SFO2)?

Centersquare is the developer. No construction contractor is named on the record yet.

How much power and water does Centersquare Silicon Valley Santa Clara Campus (SFO1 and SFO2) say it needs?

Power: 43 MW (the developer's figure, csquare.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Centersquare Silicon Valley Santa Clara Campus (SFO1 and SFO2) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Santa Clara or Santa Clara County decided about it?

San Jose: Santa Clara City is pushing for a plan to require large customers such as data centers to reduce power use when power is scarce (reported September 17, 2026, mk.co.kr (opens in a new tab)); and Santa Clara County: Santa Clara County Sustainability Committee discussed moratorium suspending permits for new data centers for a certain period, strengthening disclosure of resource use, and gap analysis (reported September 17, 2026, mk.co.kr (opens in a new tab)). 12 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Centersquare Silicon Valley Santa Clara Campus (SFO1 and SFO2) Official Disclosure (opens in a new tab), Centersquare, query feed

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Centersquare Silicon Valley Santa Clara Campus (SFO1 and SFO2)", https://datacenterrecord.org/projects/centersquare-centersquare-silicon-valley-sfo1-santa-clara-ca, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Centersquare Silicon Valley Santa Clara Campus (SFO1 and SFO2)", https://datacenterrecord.org/projects/centersquare-centersquare-silicon-valley-sfo1-santa-clara-ca. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
37.3718, -121.9698
How the location is known
Location from the site's street address.
Location source
https://www.csquare.com/data-centers
Coordinate source
Santa Clara County Assessor / Centersquare Silicon Valley specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
43 MW, the developer's figure
Rating of the county's rows
Restrictive
Published
October 21, 2026
Last verified
October 27, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection