Data Center Record.

Running Built from one source

Serverfarm Los Angeles El Segundo Data Center (LAX1)

El Segundo, Los Angeles County, CADeveloper: ServerfarmCensus GEOID 06037

Stage
Running
Power
18 MW
the developer's figure
Buildings
1 building
operator page, verified October 27, 2026
Undisclosed in public filings
Land, Water

Serverfarm operates its LAX1 Los Angeles enterprise colocation data center at 444 North Nash Street in El Segundo, Los Angeles County, California, delivering 18 MW of critical load. It is running; the record holds no sourced date for when it reached that stage.

How much water it would use and who would use it have not been disclosed.

2 hearings on the record, 2026

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Running, ringed
  • data center
  • Smaller pins: 68 other published records in California
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
1 building operator page, verified October 27, 2026
[1] serverfarmllc.com
Power it would draw
18 MW the developer's figure About 0 percent of New York City's summer peak demand in 2024.
[1] serverfarmllc.com
Who leads it
Serverfarm as stated by the source
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Serverfarm Los Angeles El Segundo Data Center (LAX1), capacity: 18 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 18 ÷ 10,245 = 0 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 18 MW the developer's figure [1] serverfarmllc.com (opens in a new tab) October 27, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Serverfarm as stated by the source October 27, 2026
Who is constructing it
How much land
Buildings 1 building operator page, verified October 27, 2026 [1] serverfarmllc.com (opens in a new tab) October 27, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Los Angeles County and El Segundo about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Los Angeles County Los Angeles County planning director ordered temporary ban on large scale AI data center development in unincorporated areas smartcitiesdive.com (opens in a new tab)
Irwindale Irwindale City Council unanimously approved data center ban Ordinance No. 821 on September 9, 2026, effective 30 days after adoption sgvtribune.com (opens in a new tab)
Vernon Vernon approaching capacity for data center projects, expanding infrastructure bisnow.com (opens in a new tab)
Monterey Park closed Monterey Park voted in June 2026 to permanently ban data centers bisnow.com (opens in a new tab)
Monterey Park closed Monterey Park voters approved a data center ban in June 2026. pressenterprise.com (opens in a new tab)
September 9, 2026 Montebello, CA Montebello City Council Regular Meeting Montebello City Council 3clips

During public comment at the September 9, 2026 Montebello City Council meeting, residents challenged the proposed Montebello data center over municipal water consumption and community impact.

  1. Resident public comment Resident Public Comment auto captions, unchecked
    "done with corruption? two. What is dumb Hilda Cis and the data center going to do for us when we have to pour water into these data centers that are going to destroy our communities and [clears throat] flock. your cameras. Who's going to monitor them? That's racist. Whatever"
  2. Resident public comment Resident Public Comment auto captions, unchecked
    ">> Council member Alonzo >> here. >> Mayor Prom Romero >> present. >> Council member Peralta >> present. >> Council member Melendez >> here. >> Mayor Tamayo >> here. And with that if we could make the announcement of close sessions, please. Mr. City Attorney. >> Certainly. Madame Mayor, at this time the public may submit a speaker card to the city clerk staff for close session items prior to the beginning of the statement. Speakers will be called in"
  3. Montebello City Council Member Elected Official auto captions, unchecked
    "person. State law prohibits the city council from taking action or entertaining extended discussion on a topic not listed on the agenda. Please show courtesy to others and direct all your comments to the mayor and city council. and tonight. So, are there any open speakers? >> No speakers. >> Okay. >> Okay. So, with that, we will uh go into close session. >> Right. And tonight we have the city council has one item on the close"
March 4, 2026 Monterey Park, CA Monterey Park City Council Regular Meeting Monterey Park City Council 3clips

Monterey Park City Council held a public hearing and voted on Items 11B, 12A, and 12B to extend the city's temporary moratorium on data centers and call a special municipal election placing a citywide data center prohibition before voters.

  1. Monterey Park City Clerk Board & Planning Staff auto captions, unchecked
    "consideration and possible action to call for a special election on June 2nd, 2026 and adding a proposition to the ballot prohibiting data center citywide. So, let me just tell you guys how many speaker cards I got so you guys can regulate the time and know that more speaker cards come in throughout the night. Uh, so 12 A I currently have 55"
  2. Resident public comment Resident Public Comment auto captions, unchecked
    "or are you back home avoiding accountability and watching? Bluey, tonight, I'm asking the council to vote yes. Yes to extending the moratorum. Yes to a June 2nd special election for a city wide ban on data centers. Yes to a city ordinance that permanently bans data centers from being built in the city. And on that ballot, and we're also asking to close two loopholes, prevent"
  3. Monterey Park City Council Member Elected Official auto captions, unchecked
    "we have multiple items um regarding the data center tonight, 12 A, 12B, and 11B. If you want to speak on each item, fill out a separate card for each item. Um, I will then call speakers by name indicated on the speaker card for each agenda item and you uh would come up to the podium, speak into the mic. Um, and"

What happened

No dated entry is on the record yet.

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from California state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] serverfarmllc.com

The site

The pin is the site's address.

The site map is at the top of the page.

Where
444 North Nash Street, El Segundo, CA 90245, El Segundo, Los Angeles County, California [1] serverfarmllc.com (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Serverfarm Los Angeles El Segundo Data Center (LAX1)
LAT 33.92250 / LON -118.38450 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Serverfarm Los Angeles El Segundo Data Center (LAX1)?

The record has 2 measures of its size: 18 MW (the developer's figure, serverfarmllc.com (opens in a new tab)) and 1 building (operator page, verified October 27, 2026, serverfarmllc.com (opens in a new tab)). Its acreage is not disclosed.

Who is building Serverfarm Los Angeles El Segundo Data Center (LAX1)?

Serverfarm is the developer. No construction contractor is named on the record yet.

How much power and water does Serverfarm Los Angeles El Segundo Data Center (LAX1) say it needs?

Power: 18 MW (the developer's figure, serverfarmllc.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Serverfarm Los Angeles El Segundo Data Center (LAX1) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has El Segundo or Los Angeles County decided about it?

Los Angeles County: Los Angeles County planning director ordered temporary ban on large scale AI data center development in unincorporated areas (reported September 22, 2026, smartcitiesdive.com (opens in a new tab)); and Irwindale: Irwindale City Council unanimously approved data center ban Ordinance No. 821 on September 9, 2026, effective 30 days after adoption (reported September 16, 2026, sgvtribune.com (opens in a new tab)). 5 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Serverfarm Los Angeles El Segundo Data Center (LAX1) Official Disclosure (opens in a new tab), Serverfarm, query feed

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Serverfarm Los Angeles El Segundo Data Center (LAX1)", https://datacenterrecord.org/projects/serverfarm-serverfarm-lax1-los-angeles-el-segundo-ca, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Serverfarm Los Angeles El Segundo Data Center (LAX1)", https://datacenterrecord.org/projects/serverfarm-serverfarm-lax1-los-angeles-el-segundo-ca. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
33.9225, -118.3845
How the location is known
Location from the site's street address.
Location source
https://www.serverfarmllc.com/locations/los-angeles-ca/
Coordinate source
Los Angeles County Assessor / Serverfarm LAX1 specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
18 MW, the developer's figure
Rating of the county's rows
Closed
Published
October 21, 2026
Last verified
October 27, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection

Researcher view · Serverfarm Los Angeles El Segundo Data Center (LAX1) · 1 source, 1 entry, 5 decisions nearby · basis and source tier on every row · verified October 27, 2026

Download CSV JSON