Data Center Record.

Proposed Built from one source

Energy Storage Solutions Edgecombe County AI Data Center

Kingsboro, Edgecombe County, NCDeveloper: Energy Storage SolutionsCensus GEOID 37065

Stage
Proposed
Power
900 MW
the developer's figure
Buildings
4 buildings
zoning application, verified October 27, 2026
Undisclosed in public filings
Land, Water

Energy Storage Solutions proposed a 900 megawatt AI data center campus on 122 acres of county owned land at the Kingsboro Industrial Park in Edgecombe County, North Carolina. It is proposed, since July 14, 2026.

How much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Proposed, ringed
  • data center
  • Smaller pins: 25 other published records in North Carolina
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
4 buildings zoning application, verified October 27, 2026
Power it would draw
900 MW the developer's figure About 9 percent of New York City's summer peak demand in 2024.
Who leads it
Energy Storage Solutions as stated by the source
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Energy Storage Solutions Edgecombe County AI Data Center, capacity: 900 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 900 ÷ 10,245 = 0.09 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 900 MW the developer's figure edgecombecountync.gov (opens in a new tab) October 27, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Energy Storage Solutions as stated by the source October 27, 2026
Who is constructing it
How much land
Buildings 4 buildings zoning application, verified October 27, 2026 edgecombecountync.gov (opens in a new tab) October 27, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. · Status: proposed (content date)

    Energy Storage Solutions proposed a 900 megawatt AI data center on 122 acres of county owned land in Kingsboro, Edgecombe County, facing resident opposition.

    [1] northcarolinahealthnews.org

The full Energy Storage Solutions Edgecombe County AI Data Center timeline, in order

The site

The pin is the site. The shaded outline is the parcel, from the county's own parcel record.

The site map is at the top of the page.

Where
Kingsboro Industrial Park, Rocky Mount, NC 27801, Kingsboro, Edgecombe County, North Carolina [source] (opens in a new tab)
How exactly it is located
Exact, on the parcel
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Energy Storage Solutions Edgecombe County AI Data Center
LAT 35.91820 / LON -77.67450 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Energy Storage Solutions Edgecombe County AI Data Center?

The record has 2 measures of its size: 900 MW (the developer's figure, edgecombecountync.gov (opens in a new tab)) and 4 buildings (zoning application, verified October 27, 2026, edgecombecountync.gov (opens in a new tab)). Its acreage is not disclosed.

Who is building Energy Storage Solutions Edgecombe County AI Data Center?

Energy Storage Solutions is the developer. No construction contractor is named on the record yet.

How much power and water does Energy Storage Solutions Edgecombe County AI Data Center say it needs?

Power: 900 MW (the developer's figure, edgecombecountync.gov (opens in a new tab)). Water: not disclosed by any source on file.

Where does Energy Storage Solutions Edgecombe County AI Data Center stand today?

It is proposed, since July 14, 2026. The newest entry, July 14, 2026: Energy Storage Solutions proposed a 900 megawatt AI data center on 122 acres of county owned land in Kingsboro, Edgecombe County, facing resident opposition. [1]

What has Kingsboro or Edgecombe County decided about it?

No decision by Kingsboro or Edgecombe County about data centers is on the record. The Edgecombe County page and the North Carolina scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. AI data center boom meets rural reality in Edgecombe County - North Carolina Health News (opens in a new tab), North Carolina Health News, July 14, 2026, query feed

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Energy Storage Solutions Edgecombe County AI Data Center", https://datacenterrecord.org/projects/energy-storage-solutions-edgecombe-county-ai-data-center-kingsboro-nc, last verified October 27, 2026. CSV · JSON
Cite this page

Data Center Record, "Energy Storage Solutions Edgecombe County AI Data Center", https://datacenterrecord.org/projects/energy-storage-solutions-edgecombe-county-ai-data-center-kingsboro-nc. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
35.9182, -77.6745
How the location is known
Location from the county parcel record.
Location source
https://www.edgecombecountync.gov/
Coordinate source
Edgecombe County Kingsboro Industrial Park parcel record
How capacity was disclosed
the developer's figure
Capacity, if disclosed
900 MW, the developer's figure
Published
September 28, 2026
Last verified
October 27, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Energy Storage Solutions Edgecombe County AI Data Center · 1 source, 1 entry, 0 decisions nearby · basis and source tier on every row · verified October 27, 2026

Download CSV JSON