Cologix NNJ3 Parsippany Data Center

Parsippany, Morris County, NJDeveloper: CologixCensus GEOID 34027

Stage
Running
Power
12 MW
the developer's figure
Buildings
1 building
operator page, verified October 27, 2026
Undisclosed in public filings
Land, Water

Cologix operates its flagship NNJ3 Northern New Jersey interconnection and enterprise data center at 200 Webro Road in Parsippany, Morris County, New Jersey, with 12 MW of critical power capacity. It is running; the record holds no sourced date for when it reached that stage.

How much water it would use and who would use it have not been disclosed.

1 hearing on the record, 2026

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Running, ringed
  • data center
  • Smaller pins: 37 other published records in New Jersey
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
1 building operator page, verified October 27, 2026
[1] cologix.com
Power it would draw
12 MW the developer's figure About 0 percent of New York City's summer peak demand in 2024.
[1] cologix.com
Who leads it
Cologix as stated by the source
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Cologix NNJ3 Parsippany Data Center, capacity: 12 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 12 ÷ 10,245 = 0 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 12 MW the developer's figure [1] cologix.com (opens in a new tab) October 27, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Cologix as stated by the source October 27, 2026
Who is constructing it
How much land
Buildings 1 building operator page, verified October 27, 2026 [1] cologix.com (opens in a new tab) October 27, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Morris County and Parsippany about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Chatham Chatham Borough Council voted unanimously on October 13, 2026 to ban data centers in all zoning districts. newjerseyhills.com (opens in a new tab)
June 15, 2026 Rockaway, NJ San Diego City Council to vote on moratorium for data centers | NBC 7 San Diego Rockaway City Council 3clips

In Rockaway, Morris County (NJ), Rockaway City Council and local residents debated municipal data center siting, utility infrastructure load, water consumption, and zoning rules during the June 15, 2026 session.

  1. Rockaway City Council Applicant and Economic Development Presentation Developer Representative auto captions, unchecked
    "building into a 400 megawatt data center has sparked action from local leaders. >> As word spreads about NAVWAR site being considered as a potential place for a data center, the community immediately responded. The group rallied last week calling for those plans to be scrapped, but others like Francisco Martinez are open to the idea of data centers coming to San Diego."
  2. Rockaway City Council Official Deliberation Elected Official auto captions, unchecked
    "next step forward in many things. >> Council member for District 9, Sean Elo Rivera, has been a vocal critic about the possibility of the US Navy cybersecurity hub becoming home to what would be the largest data center in California. >> The conversation that's happening in NAVWAR is a is a flashing red light that we need to think about this as a as a threat that can't happen in San Diego and one that we need to get ahead of."
  3. Resident public comment Resident Public Comment auto captions, unchecked
    "should be able to move forward with the data center. >> If it's a land that is just land, no current use, no immediate plan for anything else, well would they come put a bid? You know, it is fair. >> The redevelopment plans extend beyond a data center. Ted Eldridge, the project CEO, told NBC 7 they are also exploring a medical center, a university, and"

What happened

No dated entry is on the record yet.

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from New Jersey state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] cologix.com

The site

The pin is the site's address.

The site map is at the top of the page.

Where
200 Webro Road, Parsippany, NJ 07054, Parsippany, Morris County, New Jersey [1] cologix.com (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Cologix NNJ3 Parsippany Data Center
LAT 40.85420 / LON -74.42150 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Cologix NNJ3 Parsippany Data Center?

The record has 2 measures of its size: 12 MW (the developer's figure, cologix.com (opens in a new tab)) and 1 building (operator page, verified October 27, 2026, cologix.com (opens in a new tab)). Its acreage is not disclosed.

Who is building Cologix NNJ3 Parsippany Data Center?

Cologix is the developer. No construction contractor is named on the record yet.

How much power and water does Cologix NNJ3 Parsippany Data Center say it needs?

Power: 12 MW (the developer's figure, cologix.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Cologix NNJ3 Parsippany Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Parsippany or Morris County decided about it?

Chatham: Chatham Borough Council voted unanimously on October 13, 2026 to ban data centers in all zoning districts, newjerseyhills.com (opens in a new tab). 1 event is on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Cologix NNJ3 Parsippany Data Center Official Disclosure (opens in a new tab), Cologix, query feed

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Cologix NNJ3 Parsippany Data Center", https://datacenterrecord.org/projects/cologix-inc-cologix-nnj3-parsippany-nj, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Cologix NNJ3 Parsippany Data Center", https://datacenterrecord.org/projects/cologix-inc-cologix-nnj3-parsippany-nj. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
40.8542, -74.4215
How the location is known
Location from the site's street address.
Location source
https://www.cologix.com/data-centers/new-jersey/
Coordinate source
Morris County MOD-IV / Cologix NNJ3 specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
12 MW, the developer's figure
Published
October 21, 2026
Last verified
October 27, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Cologix NNJ3 Parsippany Data Center · 1 source, 1 entry, 1 decision nearby · basis and source tier on every row · verified October 27, 2026

Download CSV JSON