CoreWeave Kenilworth NEST AI Data Center
Kenilworth, Union County, NJDeveloper: CoreWeave / Onyx EquitiesCensus GEOID 34039
- Stage
- Being built
- Undisclosed in public filings
- Land, Water
CoreWeave and Onyx Equities are constructing a 280,000 square foot, 50 MW AI high performance computing data center inside the Northeast Science and Technology (NEST) campus at 2000 Galloping Hill Road in Kenilworth, Union County, New Jersey. It is being built, since May 19, 2026.
How much water it would use and who would use it have not been disclosed.
Tap a pin for the data center, the parcel for its record
- This record: Being built, ringed
- data center
- Smaller pins: 37 other published records in New Jersey
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Buildings
- 1 building operator page, verified October 27, 2026
- Power it would draw
- 50 MW the developer's figure About 0 percent of New York City's summer peak demand in 2024.
- Who leads it
- CoreWeave / Onyx Equities as stated by the source
- Undisclosed in public filings
- Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
- CoreWeave Kenilworth NEST AI Data Center, capacity: 50 MW.
- New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
- 50 ÷ 10,245 = 0 (MW over MW).
Sources:
- CoreWeave / Onyx Equities (opens in a new tab)
- NYISO, 2025 Load and Capacity Data Report (Gold Book) (opens in a new tab), Table I-4a, Baseline Summer Non-Coincident Peak Demand, Historical and Forecast, page 26, Zone J, 2024 row (2024)
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | 50 MW | the developer's figure | coreweave.com (opens in a new tab) | October 27, 2026 |
| How much water it would use | ||||
| How loud it would be | ||||
| Jobs once it runs | ||||
| Tax it would pay each year |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | CoreWeave / Onyx Equities | as stated by the source | October 27, 2026 | |
| Who is constructing it | ||||
| How much land | ||||
| Buildings | 1 building | operator page, verified October 27, 2026 | coreweave.com (opens in a new tab) | October 27, 2026 |
| Where its power comes from | ||||
| Grid connection | ||||
| How it is cooled |
A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water use A state water right filing or a water supply agreement.
- Who would use it A lease announcement or a tenant named in a filing.
- Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.
What was decided
Acts of Union County and Kenilworth about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Linden | The town of Linden is looking to ban AI data centers and took up the issue at a City Council meeting | newjersey.news12.com (opens in a new tab) | |
| Linden | Linden introduced an ordinance at Monday night's City Council meeting to restrict AI data centers | longisland.news12.com (opens in a new tab) | |
| Linden | Linden City Council set to introduce ordinance prohibiting artificial intelligence data centers in every zoning district | newjerseyglobe.com (opens in a new tab) | |
| Springfield Township | Springfield Township Committee voted 3-2 to table Resolution 2026-253 on September 8, 2026 | tapinto.net (opens in a new tab) | |
| Kenilworth | Kenilworth planning board unanimously approved a data center | newjersey.news12.com (opens in a new tab) |
June 15, 2026 Summit, NJ Meeting About Proposed Data Center in Andover, NJ Turns Violent
In Summit, Union County (NJ), Summit City Council and local residents debated municipal data center siting, utility infrastructure load, water consumption, and zoning rules during the June 15, 2026 session.
- Summit City Council Officials and Speakers Elected Official transcribed from the official recording
"the tension comes from a proposed AI data center on a 97 acre open lot. >> Residents across the region fear the environmental impacts. And when you introduced data center that has massive demands for water, for cooling for fresh water. >> That's taking it away from residents and working families. That becomes a statewide issues. The mayor says a data center would bring in much needed revenue of 5 million dollars a year. That would raise values of your property."
- Resident public comment Resident Public Comment transcribed from the official recording
"passed 2 ordinances paving the way for it to happen. When you have an application coming for a permitted use. >> A land use board is not allowed with very limited circumstances to deny the application. The mayor says it's not a done deal and he's open to changing course. Residents want to see the town. They love preserved. I want to save and know, it's just. >> It's emotional. And this place is beautiful. And I don't"
Using this data in a report? Support the record.
What happened
-
· Status: being built (content date)
CoreWeave is building a $1.8 billion, 400,000 square foot AI data center at the Northeast Science and Technology Center in Kenilworth, formerly a Merck building, with completion estimated by end of 2027.
The full CoreWeave Kenilworth NEST AI Data Center timeline, in order
The site
The pin is the site's address.
- Where
- 2000 Galloping Hill Road, Kenilworth, NJ 07033, Kenilworth, Union County, New Jersey [source] (opens in a new tab)
- How exactly it is located
- Exact, at the address
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Equinix NY11 Carteret Financial Exchange Data Center, 6.8 mi
- Equinix NY1 Newark Carrier Hotel Data Center (165 Halsey Street), 7.0 mi
- Iron Mountain New Jersey Data Center Campus (NJE-1), 12 mi
- Digital Fortress Piscataway Data Center (PNJ), 12 mi
- Centersquare Piscataway Data Center (PNJ1 / EWR), 13 mi
Keep going
Questions about this project
5 questions answered from the record
How big is CoreWeave Kenilworth NEST AI Data Center?
-
The record has 2 measures of its size: 50 MW (the developer's figure, coreweave.com (opens in a new tab)) and 1 building (operator page, verified October 27, 2026, coreweave.com (opens in a new tab)). Its acreage is not disclosed.
Who is building CoreWeave Kenilworth NEST AI Data Center?
-
CoreWeave / Onyx Equities is the developer. No construction contractor is named on the record yet.
How much power and water does CoreWeave Kenilworth NEST AI Data Center say it needs?
-
Power: 50 MW (the developer's figure, coreweave.com (opens in a new tab)). Water: not disclosed by any source on file.
Where does CoreWeave Kenilworth NEST AI Data Center stand today?
-
It is being built, since May 19, 2026. The newest entry, May 19, 2026: CoreWeave is building a $1.8 billion, 400,000 square foot AI data center at the Northeast Science and Technology Center in Kenilworth, formerly a Merck building, with completion estimated by end of 2027. [1]
What has Kenilworth or Union County decided about it?
-
Linden: The town of Linden is looking to ban AI data centers and took up the issue at a City Council meeting (reported September 19, 2026, newjersey.news12.com (opens in a new tab)); and Linden: Linden introduced an ordinance at Monday night's City Council meeting to restrict AI data centers (September 14, 2026, longisland.news12.com (opens in a new tab)). 5 events are on the county's rows; a rule about the area is not a decision about this record.
Sources
Reporting
- Residents Protest Kenilworth Data Center As Lawmakers Look To Eliminate Ai Tax Credits - connecticut.news12.com (opens in a new tab), connecticut.news12.com, May 19, 2026, query feed
- 'We're going to have major issues.' Kenilworth residents push back against AI data center under construction - connecticut.news12.com (opens in a new tab), connecticut.news12.com, April 19, 2026, query feed
- New Jersey Lawmakers Just Nixed a 2-Year-Old Data Center Tax Credit - Heatmap News (opens in a new tab), Heatmap News, July 1, 2026, query feed
- Data Center Bans Emerge in 4 More New Jersey Communities - GovTech (opens in a new tab), GovTech, June 22, 2026, query feed
4 sources on file.
About this data
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about CoreWeave Kenilworth NEST AI Data Center
Cite this page
Data Center Record, "CoreWeave Kenilworth NEST AI Data Center", https://datacenterrecord.org/projects/coreweave-kenilworth-ai-data-center-nj. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
For researchers
- Stage
- Being built
- Tier
- built from one source
- Tags
- Built from one source
- Coordinates
- 40.6785, -74.2812
- How the location is known
- Location from the site's street address.
- Location source
- https://www.coreweave.com/
- Coordinate source
- Union County MOD-IV / Northeast Science and Technology (NEST) Campus
- How capacity was disclosed
- the developer's figure
- Capacity, if disclosed
- 50 MW, the developer's figure
- Published
- September 28, 2026
- Last verified
- October 27, 2026
- Undisclosed in public filings
- Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows