CoreSite Washington DC1 Data Center

Washington, District of Columbia, DCDeveloper: CoreSiteCensus GEOID 11001

Stage
Running
Operational since 2007 (19 years)
Undisclosed in public filings
Power, Land, Buildings, Water

CoreSite operates the DC1 carrier hotel and colocation data center at 1275 K Street NW in downtown Washington, District of Columbia, serving federal agencies, cloud providers, and network operators. It is running; the record holds no sourced date for when it reached that stage.

How much power it needs, how much water it would use and who would use it have not been disclosed.

1 hearing on the record, 2026

Last verified · 2 sources, 1 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Running, ringed
  • data center
  • Smaller pins: 2 other published records in District of Columbia
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Commissioned
Operational since 2007 (19 years)
Who leads it
CoreSite as stated by the source
[2] coresite.com
Official project website
coresite.com (opens in a new tab) verified October 28, 2026
coresite.com (opens in a new tab)
Archived promotional websites
coresite.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Undisclosed in public filings
Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it CoreSite as stated by the source [2] coresite.com (opens in a new tab) October 28, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled
Official project website coresite.com verified October 28, 2026 [2] coresite.com (opens in a new tab) October 28, 2026

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of District of Columbia and Washington about data centers, on the record with their source. A rule about the area is not a decision about this record.

June 15, 2026 Washington, DC Montgomery County passes 18 month pause on data center development | NBC4 Washington Washington City Council 3 clips

In Washington, District of Columbia (DC), Washington City Council and local residents debated municipal data center siting, utility infrastructure load, water consumption, and zoning rules during the June 15, 2026 session.

  1. Washington City Council Applicant and Economic Development Presentation Developer Representative auto captions, unchecked
    "And it passed unanimously. >> The Montgomery County Council banning new data center development for the next year and a half. >> Nothing will happen until we answer all the questions our community deserves. There are a lot of questions about what happens to the water in the Potomac River, what happens to our utility"
  2. Washington City Council Official Deliberation Elected Official auto captions, unchecked
    ">> The vote was a compromise after some council members pushed for a longer moratorium to give the county time to figure out a comprehensive way to deal with hyperscale data centers in the future. >> What we did was personally merge them. And uh we compromised, and we went from 6 months to 2 years, and the compromise was 18 months. >> No data center, no data data center."
  3. Resident public comment Resident Public Comment auto captions, unchecked
    "is doing a comprehensive study on the impacts of data centers. That report is due sometime in September. >> There was a time when data centers received tax incentives to come. Now we're we want to make sure because of the energy usage uh that there's adequate public benefit in addition to protecting our community, and we need to work with the state uh and with this body to make sure that that happens."

What happened

No dated entry is on the record yet.

Every event in order

  • Read on October 28, 2026 (the day the page was read; it gives no date of its own)

    CoreSite operates the DC1 carrier hotel and colocation data center at 1275 K Street NW in Washington, District of Columbia.

    [2] coresite.com

The site

The pin is the site's address.

The site map is at the top of the page.

Where
1275 K Street NW, Washington, DC 20005, Washington, District of Columbia, District of Columbia [source] (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
By the straight line between two exact points.

USGS NAIP aerial view of CoreSite Washington DC1 Data Center
LAT 38.90250 / LON -77.02950 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building CoreSite Washington DC1 Data Center?

CoreSite is the developer, coresite.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does CoreSite Washington DC1 Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does CoreSite Washington DC1 Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Washington or District of Columbia decided about it?

No decision by Washington or District of Columbia about data centers is on the record. The District of Columbia page and the District of Columbia scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. US EPA ECHO Detailed Facility Report: CoreSite DC1 (FRS 110070412890, DC DOEE Emergency Generator Permit) (opens in a new tab), U.S. Environmental Protection Agency

Reporting

  1. CoreSite Washington DC1 Data Center Specifications (1275 K Street NW) (opens in a new tab), CoreSite, trade press

2 sources on file.

Regional grid context

This site is in the RFC East (RFCE) regional power market. 2024 to 2025 wholesale price effect: 5.1 percent (+$1.81 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 2028 projected wholesale price effect: 13.3 percent (+$4.61 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

What researchers have found

These studies measure different things. Some model wholesale market prices. Some measure what households actually paid. Some model what would happen under a policy change. The record shows each one as the authors stated it and does not rank them.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "CoreSite Washington DC1 Data Center", https://datacenterrecord.org/projects/coresite-coresite-washingtondc-dc1-washington-dc, last verified October 28, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "CoreSite Washington DC1 Data Center", https://datacenterrecord.org/projects/coresite-coresite-washingtondc-dc1-washington-dc. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
38.9025, -77.0295
How the location is known
Location from the site's street address.
Location source
CoreSite DC1 facility specification sheet and District of Columbia property record
Published
October 21, 2026
Last verified
October 28, 2026
Undisclosed in public filings