Ayera Technologies Modesto Data Center
Modesto, Stanislaus County, CADeveloper: Ayera TechnologiesCensus GEOID 06099
- Stage
- Running
- Undisclosed in public filings
- Land, Water
Ayera Technologies operates a commercial colocation and wireless internet backbone data center at 801 Tenth Street in downtown Modesto, Stanislaus County, California, with 2 MW of power capacity. It is running; the record holds no sourced date for when it reached that stage.
How much water it would use and who would use it have not been disclosed.
Tap a pin for the data center, the parcel for its record
- This record: Running, ringed
- data center
- Smaller pins: 68 other published records in California
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Power it would draw
- 2 MW the developer's figure About 0 percent of New York City's summer peak demand in 2024.
- [1] ayera.com
- Who leads it
- Ayera Technologies as stated by the source
- Undisclosed in public filings
- Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
- Ayera Technologies Modesto Data Center, capacity: 2 MW.
- New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
- 2 ÷ 10,245 = 0 (MW over MW).
Sources:
- Ayera Technologies (opens in a new tab)
- NYISO, 2025 Load and Capacity Data Report (Gold Book) (opens in a new tab), Table I-4a, Baseline Summer Non-Coincident Peak Demand, Historical and Forecast, page 26, Zone J, 2024 row (2024)
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | 2 MW | the developer's figure | [1] ayera.com (opens in a new tab) | October 27, 2026 |
| How much water it would use | ||||
| How loud it would be | ||||
| Jobs once it runs | ||||
| Tax it would pay each year |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | Ayera Technologies | as stated by the source | October 27, 2026 | |
| Who is constructing it | ||||
| How much land | ||||
| Buildings | 1 building | operator page, verified October 27, 2026 | [1] ayera.com (opens in a new tab) | October 27, 2026 |
| Where its power comes from | ||||
| Grid connection | ||||
| How it is cooled |
A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water use A state water right filing or a water supply agreement.
- Who would use it A lease announcement or a tenant named in a filing.
- Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.
What was decided
Acts of Stanislaus County and Modesto about data centers, on the record with their source. A rule about the area is not a decision about this record.
August 11, 2026 Modesto, CA Modesto City Council Regular Meeting
Modesto Mayor Sue Zwahlen opened the City Council meeting by announcing that large data centers are not a permitted zoning use in Modesto and that city staff is exploring a formal moratorium following resident opposition over agricultural water supplies.
- Sue Zwahlen, Mayor, City of Modesto Elected Official auto captions, unchecked
"Before we move to public comment, I understand there may be many individuals here and online who have concerns regarding data centers. The issue has received significant attention in the news and the city has received numerous comments and questions on this topic. As the city has previously stated publicly and to the press, large data centers are not currently in allowed use or under the"
- Resident public comment Resident Public Comment auto captions, unchecked
"here in Modesto. I'm here to let you know we have already used up the majority of natural resources that the planet can regenerate this year. Not talking about exactly here in our region just yet, but AI data centers could pollute and waste what's left. Especially when we have finite resources, the water you need for your livestock, your agriculture, all of that could be gone. Your property values in time will tank too because nobody can"
- Modesto City Council Member Elected Official auto captions, unchecked
"Modesto City Council meeting to order and ask the city clerk to call the role. Council member Bavaro, >> Vice Mayor Williams >> here, >> Council Member Wright here, >> Council Member Scootia Breton here, Council Member Alvarez, Council Member Ricky, and Mayor Zwellen >> here. Will everyone please rise for the pledge of allegiance followed by the invocation from Pastor Latricia Beasley"
Using this data in a report? Support the record.
What happened
No dated entry is on the record yet.
-
Read on October 27, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from California state agency permits, utility dockets, municipal planning filings, or operator campus specifications.
The site
The pin is the site's address.
- Where
- 801 Tenth Street, Modesto, CA 95354, Modesto, Stanislaus County, California [1] ayera.com (opens in a new tab)
- How exactly it is located
- Exact, at the address
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Modesto East Claus Road Hyperscale Data Center Proposal, 4.2 mi
- EZ Network Systems Stockton Data Center, 30 mi
- New York GreenCloud Ione Biomass Powered Data Center Proposal, 49 mi
- Equinix San Jose Great Oaks and North San Jose Campus (SV1, SV3, SV5, SV10, SV11, and SV12x), 51 mi
- STACK Infrastructure Silicon Valley San Jose Campus (SVY01), 52 mi
Keep going
Questions about this project
5 questions answered from the record
How big is Ayera Technologies Modesto Data Center?
-
The record has 2 measures of its size: 2 MW (the developer's figure, ayera.com (opens in a new tab)) and 1 building (operator page, verified October 27, 2026, ayera.com (opens in a new tab)). Its acreage is not disclosed.
Who is building Ayera Technologies Modesto Data Center?
-
Ayera Technologies is the developer. No construction contractor is named on the record yet.
How much power and water does Ayera Technologies Modesto Data Center say it needs?
-
Power: 2 MW (the developer's figure, ayera.com (opens in a new tab)). Water: not disclosed by any source on file.
Where does Ayera Technologies Modesto Data Center stand today?
-
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
What has Modesto or Stanislaus County decided about it?
-
No decision by Modesto or Stanislaus County about data centers is on the record. The Stanislaus County page and the California scorecard list every rated row the day a person publishes one.
Sources
Reporting
- Ayera Technologies Modesto Data Center Official Disclosure (opens in a new tab), Ayera Technologies, query feed
1 source on file.
About this data
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about Ayera Technologies Modesto Data Center
Cite this page
Data Center Record, "Ayera Technologies Modesto Data Center", https://datacenterrecord.org/projects/ayera-technologies-inc-801-tenth-street-modesto-ayera-modesto-ca. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
For researchers
- Stage
- Running
- Tier
- built from one source
- Tags
- Built from one source
- Coordinates
- 37.6385, -120.9968
- How the location is known
- Location from the site's street address.
- Location source
- https://www.ayera.com/datacenter/
- Coordinate source
- Stanislaus County Assessor / Ayera Technologies Modesto specification
- How capacity was disclosed
- the developer's figure
- Capacity, if disclosed
- 2 MW, the developer's figure
- Published
- October 21, 2026
- Last verified
- October 27, 2026
- Undisclosed in public filings
- Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows