Vantage Data Centers Atlanta (GA1 Douglasville)

Douglasville, Douglas County, GADeveloper: Vantage Data CentersCensus GEOID 13097

Stage
Being built
Power
256 MW
the developer's figure
Buildings
3 buildings
operator page, verified October 26, 2026
Water
14,000 gallons a day
the developer's figure
Undisclosed in public filings
Land

Net new or unlinked Georgia DCA DRI data center filing not yet matched to an existing slug in projects table. It is being built; the record holds no sourced date for when it reached that stage.

Who would use it has not been disclosed.

Last verified · 2 sources, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Being built, ringed
  • data center
  • Smaller pins: 38 other published records in Georgia
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
3 buildings operator page, verified October 26, 2026
Power it would draw
256 MW the developer's figure About 2 percent of New York City's summer peak demand in 2024.
Water
14,000 gallons a day the developer's figure Not compared: the source did not say whether the figure is withdrawal or consumptive use.
[1] apps.dca.ga.gov
Who leads it
Vantage Data Centers as stated by the source
Undisclosed in public filings
Land, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Vantage Data Centers Atlanta (GA1 Douglasville), capacity: 256 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 256 ÷ 10,245 = 0.02 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 256 MW the developer's figure vantage-dc.com (opens in a new tab) October 26, 2026
How much water it would use 14,000 gallons a day the developer's figure [1] apps.dca.ga.gov (opens in a new tab) October 26, 2026
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Vantage Data Centers as stated by the source October 26, 2026
Who is constructing it
How much land
Buildings 3 buildings operator page, verified October 26, 2026 vantage-dc.com (opens in a new tab) October 26, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What happened

No dated entry is on the record yet.

  • Read on October 26, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification.

    [1] apps.dca.ga.gov

The site

The pin is the site. The shaded outline is the parcel, from the county's own parcel record.

The site map is at the top of the page.

Where
2089 Midway Rd, Douglasville, GA 30134, Douglasville, Douglas County, Georgia [1] apps.dca.ga.gov (opens in a new tab)
How exactly it is located
Exact, on the parcel
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Vantage Data Centers Atlanta (GA1 Douglasville)
LAT 33.77820 / LON -84.67140 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Vantage Data Centers Atlanta (GA1 Douglasville)?

The record has 2 measures of its size: 256 MW (the developer's figure, vantage-dc.com (opens in a new tab)) and 3 buildings (operator page, verified October 26, 2026, vantage-dc.com (opens in a new tab)). Its acreage is not disclosed.

Who is building Vantage Data Centers Atlanta (GA1 Douglasville)?

Vantage Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does Vantage Data Centers Atlanta (GA1 Douglasville) say it needs?

Power: 256 MW (the developer's figure, vantage-dc.com (opens in a new tab)). Water: 14,000 gallons a day (the developer's figure, apps.dca.ga.gov (opens in a new tab)).

Where does Vantage Data Centers Atlanta (GA1 Douglasville) stand today?

It is being built; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Douglasville or Douglas County decided about it?

No decision by Douglasville or Douglas County about data centers is on the record. The Douglas County page and the Georgia scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Georgia DCA DRI Filing #4051 (Vantage Data Center, Douglas County, GA) (opens in a new tab), Georgia DCA DRI Filing #4051, August 15, 2023, query feed
  2. Georgia DCA DRI Filing #4051 (Vantage Data Center, Douglas County, GA) (opens in a new tab), Georgia DCA DRI Filing #4051, August 15, 2023, query feed

2 sources on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Vantage Data Centers Atlanta (GA1 Douglasville)", https://datacenterrecord.org/projects/georgia-dri-4051-vantage-data-center-ga, last verified October 26, 2026. CSV · JSON
Cite this page

Data Center Record, "Vantage Data Centers Atlanta (GA1 Douglasville)", https://datacenterrecord.org/projects/georgia-dri-4051-vantage-data-center-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
33.7782, -84.6714
How the location is known
Location from the county parcel record.
Location source
https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4051
Coordinate source
Georgia DCA DRI Filing #4051 and Vantage Data Centers Atlanta GA1 specification
How capacity was disclosed
the developer's figure
How water was disclosed
the developer's figure
Capacity, if disclosed
256 MW, the developer's figure
Published
October 21, 2026
Last verified
October 26, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Vantage Data Centers Atlanta (GA1 Douglasville) · 2 sources, 1 entry, 0 decisions nearby · basis and source tier on every row · verified October 26, 2026