T5 Colorado Springs Data Center

Colorado Springs, El Paso County, CODeveloper: T5 Data CentersCensus GEOID 08041

Stage
Running
Power
16 MW
the developer's figure
Buildings
1 building
operator page, verified October 27, 2026
Undisclosed in public filings
Land, Water

T5 Data Centers operates its 16 MW wholesale colocation data center at 3323 Janitell Road in Colorado Springs, El Paso County, Colorado. It is running; the record holds no sourced date for when it reached that stage.

How much water it would use and who would use it have not been disclosed.

1 hearing on the record, 2026

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Running, ringed
  • data center
  • Smaller pins: 30 other published records in Colorado
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
1 building operator page, verified October 27, 2026
[1] t5datacenters.com
Power it would draw
16 MW the developer's figure About 0 percent of New York City's summer peak demand in 2024.
[1] t5datacenters.com
Who leads it
T5 Data Centers as stated by the source
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. T5 Colorado Springs Data Center, capacity: 16 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 16 ÷ 10,245 = 0 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 16 MW the developer's figure [1] t5datacenters.com (opens in a new tab) October 27, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it T5 Data Centers as stated by the source October 27, 2026
Who is constructing it
How much land
Buildings 1 building operator page, verified October 27, 2026 [1] t5datacenters.com (opens in a new tab) October 27, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of El Paso County and Colorado Springs about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Colorado Springs case by case Colorado Springs City Council adopted a proclamation aimed at reclaiming civility in politics following the Project Taurus hearing disruption. cpr.org (opens in a new tab)
Colorado Springs case by case Colorado Springs city council voted 7-2 to postpone the vote on Project Taurus from an earlier date to April 13, 2026. cpr.org (opens in a new tab)
Colorado Springs case by case Colorado Springs city council voted 7-2 to delay Project Taurus decision until April 13, 2027 yahoo.com (opens in a new tab)
Colorado Springs case by case Colorado Springs City Council postponed Project Taurus data center decision for six months in a 7-2 vote koaa.com (opens in a new tab)
Colorado Springs case by case Colorado Springs City Council postponed a data center vote for six months in a 7-2 vote koaa.com (opens in a new tab)
Colorado Springs case by case Planning Commission denied first round of appeals in July 2026 kktv.com (opens in a new tab)
27 earlier decisions on the county's rows
DateWhoDecisionSource
Colorado Springs case by case Original motion to hold decision in March failed kktv.com (opens in a new tab)
Colorado Springs case by case Colorado Springs City Council voted 7-2 to postpone Project Taurus appeals decision until April 13, 2027 kktv.com (opens in a new tab)
Colorado Springs case by case Colorado Springs City Council voted to postpone appeals decision on Project Taurus until April 13, 2027 krdo.com (opens in a new tab)
Colorado Springs case by case City council voted 7-2 to postpone Project Taurus decision until April 2027 and said they have unanswered questions about power purchase agreement and noise kvor.com (opens in a new tab)
Colorado Springs case by case Colorado Springs City Council voted 7-2 to delay final decision on Project Taurus data center until at least April. coloradosun.com (opens in a new tab)
Colorado Springs case by case Three people taken into custody at Project Taurus data center special City Council meeting on September 17, 2026 for causing a disturbance yahoo.com (opens in a new tab)
Colorado Springs case by case Colorado Springs City Council held public hearing on data center on Thursday gazette.com (opens in a new tab)
Colorado Springs case by case Colorado Springs City Council voted 7-2 to postpone the final decision on Project Taurus until April 13, 2027 gazette.com (opens in a new tab)
Colorado Springs case by case Three people were arrested at Project Taurus City Council meeting on September 17, 2026 kktv.com (opens in a new tab)
Colorado Springs case by case Four people arrested during Project Taurus City Council meeting on September 17, 2026 krdo.com (opens in a new tab)
Colorado Springs case by case Four people arrested at Project Taurus City Council meeting on September 17, 2026: Caleb Miller charged with second degree assault on peace officer after biting; Christianna Miller charged with obstructing a peace officer; Jacob Wilkinson charged with misdemeanor theft of body worn camera; Wendy Jerado charged with obstruction and megaphone disruption krdo.com (opens in a new tab)
Colorado Springs case by case Colorado Springs released data center development standards in recent months krdo.com (opens in a new tab)
Colorado Springs case by case Colorado Springs City Council vote on Project Taurus data center appeal scheduled for Thursday, September 17, 2026 krdo.com (opens in a new tab)
Colorado Springs case by case City council now hears second appeal of Project Taurus data center koaa.com (opens in a new tab)
Colorado Springs case by case Colorado Springs City Council special meeting on Project Taurus scheduled for Thursday gazette.com (opens in a new tab)
Colorado Springs case by case Colorado Springs Utilities created a large load rate process in 2025 cpr.org (opens in a new tab)
Colorado Springs case by case Colorado Springs puts guardrails on new data centers axios.com (opens in a new tab)
Colorado Springs case by case Colorado Springs adopted Community First Data Center Standards coloradosprings.gov (opens in a new tab)
Colorado Springs case by case Colorado Springs City Council set a special meeting for Project Taurus data center decision gazette.com (opens in a new tab)
Colorado Springs case by case Colorado Springs City Council set a date for Project Taurus data center final hearing cpr.org (opens in a new tab)
Colorado Springs case by case Colorado Springs City Council will decide on Project Taurus data center cpr.org (opens in a new tab)
Colorado Springs case by case Colorado Springs Planning Commissioners rejected activists' attempt to stop a data center pikespeakbulletin.org (opens in a new tab)
Colorado Springs case by case Planning Commission rejected appeals of proposed data center in Colorado Springs gazette.com (opens in a new tab)
Colorado Springs case by case Colorado Springs Planning Commission denied appeals in Project Taurus data center krdo.com (opens in a new tab)
Colorado Springs case by case Colorado Springs Planning Commission rejected resident appeals against proposed artificial intelligence data center off Garden of the Gods Road in a 6-2 vote on Thursday coloradopolitics.com (opens in a new tab)
Colorado Springs case by case Data center approval in Colorado Springs was appealed by residents cpr.org (opens in a new tab)
Colorado Springs case by case Data center on Garden of the Gods Road administratively approved by Colorado Springs gazette.com (opens in a new tab)
June 15, 2026 Colorado Springs, CO Aurora City Council to vote on data center ban Colorado Springs City Council 3clips

In Colorado Springs, El Paso County (CO), Colorado Springs City Council and local residents debated municipal data center siting, utility infrastructure load, water consumption, and zoning rules during the June 15, 2026 session.

  1. Colorado Springs City Council Officials and Speakers Elected Official auto captions, unchecked
    ">> AND, ASHLEY, THE CITY NOW HAS A LETTER FROM A DATA CENTER DEVELOPER TO CONSIDER AS WELL. >> YEAH. MICHELLE AND BRIAN, GOOD MORNING. AND DATA CENTERS WILL ONCE AGAIN BE THE TOPIC OF CONVERSATION DURING CITY COUNCIL'S MEETING LATER TONIGHT. NOW, THE CITY OF AURORA IS ACTUALLY HOME TO NINE DATA CENTERS AND THE LARGEST DATA CENTER HERE IN THE STATE OF COLORADO. FIVE OF THOSE DATA"
  2. Resident public comment Resident Public Comment auto captions, unchecked
    "VALLEY RANCH. THAT ONE HAS ALREADY BEEN APPROVED, BUT NOW THE DEVELOPER SAYS IT WILL EXPLORE A NEW SITE FOR THE 860,000 SQUARE FOOT FACILITY, BUT ONLY IF THE CITY PAUSES. NEW DATA CENTER RULES FOR 90 DAYS. NOW, CITY COUNCIL DID VOTE AGAINST A SIX MONTH MORATORIUM EARLIER EARLIER THIS YEAR, WITH MAYOR MIKE COFFMAN CASTING THE TIE BREAKING VOTE AGAINST THE ORDINANCE. BUT NOW,"
  3. Colorado Springs City Council Member Elected Official auto captions, unchecked
    "DEVELOPER'S LETTER TO CITY COUNCIL. NOW, A MORATORIUM WOULD NEED SEVEN VOTES TO PASS. IF IT DOES PASS, IT WOULD NOT GO INTO EFFECT UNTIL SOMETIME NEXT YEAR. IF PASSED TONIGHT, IT WOULD ALSO NOT STOP THE TRIDENT DATA CENTER FOR MOVING FORWARD, BECAUSE THAT DATA CENTER HAS ALREADY BEEN APPROVED. NOW, THAT MEETING IS SCHEDULED TO START LATER TONIGHT AT 6:00, REPORTING LIVE IN AURORA THIS MORNING. I'M YOUR"

What happened

No dated entry is on the record yet.

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from Colorado state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] t5datacenters.com

The site

The pin is the site's address.

The site map is at the top of the page.

Where
3323 Janitell Road, Colorado Springs, CO 80906, Colorado Springs, El Paso County, Colorado [1] t5datacenters.com (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of T5 Colorado Springs Data Center
LAT 38.78586 / LON -104.78857 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is T5 Colorado Springs Data Center?

The record has 2 measures of its size: 16 MW (the developer's figure, t5datacenters.com (opens in a new tab)) and 1 building (operator page, verified October 27, 2026, t5datacenters.com (opens in a new tab)). Its acreage is not disclosed.

Who is building T5 Colorado Springs Data Center?

T5 Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does T5 Colorado Springs Data Center say it needs?

Power: 16 MW (the developer's figure, t5datacenters.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does T5 Colorado Springs Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Colorado Springs or El Paso County decided about it?

Colorado Springs (rated case by case): Colorado Springs City Council adopted a proclamation aimed at reclaiming civility in politics following the Project Taurus hearing disruption (reported September 23, 2026, cpr.org (opens in a new tab)); and Colorado Springs: Colorado Springs city council voted 7-2 to postpone the vote on Project Taurus from an earlier date to April 13, 2026 (reported September 23, 2026, cpr.org (opens in a new tab)). 33 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. T5 Colorado Springs Data Center Official Disclosure (opens in a new tab), T5 Data Centers, query feed

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "T5 Colorado Springs Data Center", https://datacenterrecord.org/projects/t5-data-centers-t5colorado-springs-colorado-springs-co, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "T5 Colorado Springs Data Center", https://datacenterrecord.org/projects/t5-data-centers-t5colorado-springs-colorado-springs-co. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
38.785862, -104.788567
How the location is known
Location from the site's street address.
Location source
https://t5datacenters.com/
Coordinate source
El Paso County Assessor / T5 Data Centers
How capacity was disclosed
the developer's figure
Capacity, if disclosed
16 MW, the developer's figure
Rating of the county's rows
Case by case
Published
October 21, 2026
Last verified
October 27, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection

Researcher view · T5 Colorado Springs Data Center · 1 source, 1 entry, 33 decisions nearby · basis and source tier on every row · verified October 27, 2026

Download CSV JSON