365 Data Centers Commack Long Island (CNY)
Commack, Suffolk County, NYDeveloper: 365 Data CentersCensus GEOID 36103
- Stage
- Running
- Undisclosed in public filings
- Land, Water
365 Data Centers operates its CNY Long Island colocation facility at 500 Commack Road in Commack, Suffolk County, New York, delivering 6 MW of power capacity. It is running; the record holds no sourced date for when it reached that stage.
How much water it would use and who would use it have not been disclosed.
Tap a pin for the data center, the parcel for its record
- This record: Running, ringed
- data center
- Smaller pins: 31 other published records in New York
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Power it would draw
- 6 MW the developer's figure About 0 percent of New York City's summer peak demand in 2024.
- [1] 365datacenters.com
- Who leads it
- 365 Data Centers as stated by the source
- Undisclosed in public filings
- Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
- 365 Data Centers Commack Long Island (CNY), capacity: 6 MW.
- New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
- 6 ÷ 10,245 = 0 (MW over MW).
Sources:
- 365 Data Centers (opens in a new tab)
- NYISO, 2025 Load and Capacity Data Report (Gold Book) (opens in a new tab), Table I-4a, Baseline Summer Non-Coincident Peak Demand, Historical and Forecast, page 26, Zone J, 2024 row (2024)
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | 6 MW | the developer's figure | [1] 365datacenters.com (opens in a new tab) | October 27, 2026 |
| How much water it would use | ||||
| How loud it would be | ||||
| Jobs once it runs | ||||
| Tax it would pay each year |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | 365 Data Centers | as stated by the source | October 27, 2026 | |
| Who is constructing it | ||||
| How much land | ||||
| Buildings | 1 building | operator page, verified October 27, 2026 | [1] 365datacenters.com (opens in a new tab) | October 27, 2026 |
| Where its power comes from | ||||
| Grid connection | ||||
| How it is cooled |
A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water use A state water right filing or a water supply agreement.
- Who would use it A lease announcement or a tenant named in a filing.
- Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.
What was decided
Acts of Suffolk County and Commack about data centers, on the record with their source. A rule about the area is not a decision about this record.
June 15, 2026 Babylon, NY Threat of data center upends tiny Upstate NY town
In Babylon, Suffolk County (NY), Babylon City Council and local residents debated municipal data center siting, utility infrastructure load, water consumption, and zoning rules during the June 15, 2026 session.
- Babylon City Council Officials and Speakers Elected Official auto captions, unchecked
"depending on what let just like Ilion's unique, you know. Um, I don't know how many people, like I said, have it right there with the high school literally right there. We got a a high rise right there, you know, everything's within >> Yeah. >> a mile, half a mile, you know. So, all that has to be brought in. >> That's kind of unique. >> Yeah. So, as mayor of Ilion is what I'm dealing with and uh, trying to work through, you know, trying to work with the IDA, trying to work with our state"
- Resident public comment Resident Public Comment auto captions, unchecked
"said, I've been in here 8 weeks, 10 weeks. >> Yeah. >> Um, I plan to move ahead. Um, however, I want to um, move ahead uh, diligently, carefully, and the most important thing to me is um, protect the interest of the village of Ilion. >> Okay. >> what I mean? That's first and foremost on both ends, environmentally and uh, development and uh, strategically where we're going. And that's a that's a tough balance sometimes. The problem with Ilion um, has been we"
- Babylon City Council Member Elected Official auto captions, unchecked
"a one horse town, so to speak, you know, Remington was Ilion, Ilion was Remington. And I think it would be advantageous to us to not get into that again, because obviously if something happens, that's another reason why I don't want to see that any development be just one huge because if something happens, you know, whatever. I'm more of a multi use type of guy. But again, each project is different. Uh, um, it would be I don't know if that"
Using this data in a report? Support the record.
What happened
No dated entry is on the record yet.
-
Read on October 27, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from New York state agency permits, utility dockets, municipal planning filings, or operator campus specifications.
The site
The pin is the site's address.
- Where
- 500 Commack Road, Commack, NY 11725, Commack, Suffolk County, New York [1] 365datacenters.com (opens in a new tab)
- How exactly it is located
- Exact, at the address
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Applied Digital Data Corp, 2.5 mi
- 1025Connect Westbury Subsea and Carrier Hotel Hub, 15 mi
- LightEdge and Webair Garden City Long Island Data Center (NY1), 19 mi
- Equinix NY13 Westchester Data Center, 32 mi
- TierPoint Westchester Hawthorne Data Center Campus, 33 mi
Keep going
Questions about this project
5 questions answered from the record
How big is 365 Data Centers Commack Long Island (CNY)?
-
The record has 2 measures of its size: 6 MW (the developer's figure, 365datacenters.com (opens in a new tab)) and 1 building (operator page, verified October 27, 2026, 365datacenters.com (opens in a new tab)). Its acreage is not disclosed.
Who is building 365 Data Centers Commack Long Island (CNY)?
-
365 Data Centers is the developer. No construction contractor is named on the record yet.
How much power and water does 365 Data Centers Commack Long Island (CNY) say it needs?
-
Power: 6 MW (the developer's figure, 365datacenters.com (opens in a new tab)). Water: not disclosed by any source on file.
Where does 365 Data Centers Commack Long Island (CNY) stand today?
-
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
What has Commack or Suffolk County decided about it?
-
No decision by Commack or Suffolk County about data centers is on the record. The Suffolk County page and the New York scorecard list every rated row the day a person publishes one.
Sources
Reporting
- 365 Data Centers Commack Long Island (CNY) Official Disclosure (opens in a new tab), 365 Data Centers, query feed
1 source on file.
About this data
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about 365 Data Centers Commack Long Island (CNY)
Cite this page
Data Center Record, "365 Data Centers Commack Long Island (CNY)", https://datacenterrecord.org/projects/365-data-centers-365-data-centers-commack-cny-commack-ny. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
For researchers
- Stage
- Running
- Tier
- built from one source
- Tags
- Built from one source
- Coordinates
- 40.8215, -73.2932
- How the location is known
- Location from the site's street address.
- Location source
- https://www.365datacenters.com/
- Coordinate source
- Suffolk County GIS / 365 Data Centers Commack specification
- How capacity was disclosed
- the developer's figure
- Capacity, if disclosed
- 6 MW, the developer's figure
- Published
- October 21, 2026
- Last verified
- October 27, 2026
- Undisclosed in public filings
- Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows