Data Center Record.

Proposed Reviewed in depth

Vantage Data Centers Aurora Campus (Project Trident)

Aurora, Adams County, CODeveloper: Vantage Data CentersCensus GEOID 08001

Stage
Proposed
Undisclosed in public filings
Power, Land, Buildings, Water

Vantage Data Centers proposed Project Trident, a hyperscale data center campus near Green Valley Ranch in Aurora, Adams County, Colorado, which prompted Aurora City Council votes rejecting a moratorium in August 2026 and again by a 6 to 5 procedural vote on October 27, 2026 alongside a citywide ban on evaporative cooling. It is proposed, since October 27, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

1 hearing on the record, 2026

Last verified · 5 sources, 4 primary · Reviewed by a person, every entry sourced. · How to read this page

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 31 other published records in Colorado
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Who leads it
Vantage Data Centers as stated by the source
[5] denvergazette.com
Grid connection
Connection under study as stated by the source
[2] puc.colorado.gov
Official project website
vantage-dc.com (opens in a new tab) verified October 28, 2026
vantage-dc.com (opens in a new tab)
Archived promotional websites
vantage-dc.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Undisclosed in public filings
Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Vantage Data Centers as stated by the source [5] denvergazette.com (opens in a new tab) October 28, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection Connection under study as stated by the source [2] puc.colorado.gov (opens in a new tab) October 28, 2026
How it is cooled
Official project website vantage-dc.com verified October 28, 2026 vantage-dc.com (opens in a new tab) October 28, 2026

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Adams County and Aurora about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Brighton The Brighton City Council voted unanimously to adopt a one year moratorium on data center development cpr.org (opens in a new tab)
Commerce City Commerce City passes six month pause on accepting new data center applications cbsnews.com (opens in a new tab)
Commerce City During the six month pause, if accepted, the city will not be able to approve any data center development plans or applications until March 2027. denver7.com (opens in a new tab)
Commerce City Commerce City council will consider a six month moratorium on approving data center development plans or zoning applications. denver7.com (opens in a new tab)
Commerce City Commerce City Council will hear first reading of ordinance putting 6 month moratorium on data center site development on Monday denver7.com (opens in a new tab)
Brighton In Brighton, Adams County (CO), Brighton City Council and local residents debated municipal data center siting, utility infrastructure load, water consumption, and zoning rules during the June 15, 2026 session. youtube.com (opens in a new tab)
October 26, 2026 Aurora, CO Aurora City Council Vote on 180 Day Data Center Moratorium and Zoning Rules Aurora City Council 3 clips

Aurora City Council voted on October 26, 2026 to enact a 180 day temporary moratorium on new data center applications while advancing permanent municipal zoning rules requiring closed loop cooling, residential buffer setbacks, and city council conditional use approval, after reviewing a letter from the Project Trident developer offering to explore alternative sites for the 860,000 square foot facility in Green Valley Ranch.

  1. Aurora City Council and CBS Colorado Broadcast Report Elected Official transcribed from the official recording
    ">> AND, ASHLEY, THE CITY NOW HAS A LETTER FROM A DATA CENTER DEVELOPER TO CONSIDER AS WELL. >> YEAH. MICHELLE AND BRIAN, GOOD MORNING. AND DATA CENTERS WILL ONCE AGAIN BE THE TOPIC OF CONVERSATION DURING CITY COUNCIL'S MEETING LATER TONIGHT. NOW, THE CITY OF AURORA IS ACTUALLY HOME TO NINE DATA CENTERS AND THE LARGEST DATA CENTER HERE IN THE STATE OF COLORADO. FIVE OF THOSE DATA"
  2. Mike Coffman, Mayor of Aurora, and Council Deliberation Elected Official transcribed from the official recording
    "VALLEY RANCH. THAT ONE HAS ALREADY BEEN APPROVED, BUT NOW THE DEVELOPER SAYS IT WILL EXPLORE A NEW SITE FOR THE 860,000 SQUARE FOOT FACILITY, BUT ONLY IF THE CITY PAUSES. NEW DATA CENTER RULES FOR 90 DAYS. NOW, CITY COUNCIL DID VOTE AGAINST A SIX MONTH MORATORIUM EARLIER EARLIER THIS YEAR, WITH MAYOR MIKE COFFMAN CASTING THE TIE BREAKING VOTE AGAINST THE ORDINANCE. BUT NOW,"
  3. Aurora City Council Roll Call and Ordinance Deliberation Elected Official transcribed from the official recording
    "DEVELOPER'S LETTER TO CITY COUNCIL. NOW, A MORATORIUM WOULD NEED SEVEN VOTES TO PASS. IF IT DOES PASS, IT WOULD NOT GO INTO EFFECT UNTIL SOMETIME NEXT YEAR. IF PASSED TONIGHT, IT WOULD ALSO NOT STOP THE TRIDENT DATA CENTER FOR MOVING FORWARD, BECAUSE THAT DATA CENTER HAS ALREADY BEEN APPROVED. NOW, THAT MEETING IS SCHEDULED TO START LATER TONIGHT AT 6:00, REPORTING LIVE IN AURORA THIS MORNING. I'M YOUR"
Said and filed

Said and filed

Statements and filings, side by side

Moratorium Zoning Water
Column A · Dated Statement
Mike Coffman Mayor of Aurora, Colorado
Venue: Aurora City Council Regular Meeting and CBS Colorado Broadcast
"Mayor Mike Coffman cast the tie breaking vote against a proposed six month moratorium on new data center applications in Aurora while the 860,000 square foot Project Trident facility advanced through administrative review near Green Valley Ranch."
Column B · Primary Government Record
Aurora City Council October 26, 2026 180 Day Moratorium, Permanent Siting Rules, and Developer Relocation Letter
City of Aurora Council Docket · October 26, 2026
Agency or Venue: Aurora City Council
"On October 12, 2026, Mayor Mike Coffman stated the proposed Trident Data Center near homes in Green Valley Ranch should be stopped. On October 26, 2026, Aurora City Council voted to enact a 180 day moratorium on new data center applications and adopt permanent closed loop water and residential setback rules while the developer offered to explore an alternative site."

What happened

  1. · Status: proposed Moratorium rejected (content date)

    Aurora City Council voted 6 to 5 on October 27, 2026 against suspending council rules to reconsider a moratorium on new data center applications, falling one vote short of the seven votes required despite Mayor Mike Coffman reversing his August stance to back a pause amid neighborhood pushback over Project Trident.

    [3] cbsnews.com

  2. · Status: approved (content date)

    During the October 26, 2026 Aurora City Council hearing on data center restrictions, council members reviewed a letter from the Project Trident developer offering to explore alternative sites for the approved 860,000 square foot facility in Green Valley Ranch if the city paused new rules for 90 days.

    auroragov.org (opens in a new tab) primary source

Every event in order

What was said

The proposed 860,000 square foot Trident Data Center near homes in Green Valley Ranch should be stopped, and Aurora must enact strict setback, noise, and closed loop water rules before approving new facilities.
Mike Coffman, Mayor of Aurora, Colorado, Colorado · October 12, 2026 · paraphrased · CBS Colorado (opens in a new tab) trade press

Every statement about data centers in Colorado, by speaker

The site

Where in Aurora is not in the public record. The pin marks the center of Aurora, not a building, and the outline is Adams County.

The site map is at the top of the page.

Where
Near Green Valley Ranch and East 56th Avenue, Aurora, CO 80019, Aurora, Adams County, Colorado [3] cbsnews.com (opens in a new tab)
How exactly it is located
Town level, the center of the city
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at the center of its town.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Vantage Data Centers Aurora Campus (Project Trident)?

Vantage Data Centers is the developer, denvergazette.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Vantage Data Centers Aurora Campus (Project Trident) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

What has Aurora or Adams County decided about it?

Brighton: The Brighton City Council voted unanimously to adopt a one year moratorium on data center development (October 6, 2026, cpr.org (opens in a new tab)); and Commerce City: Commerce City passes six month pause on accepting new data center applications (reported September 24, 2026, cbsnews.com (opens in a new tab)). 6 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. US EPA ECHO Detailed Facility Report: Vantage Data Centers Aurora CO1 (FRS 110071489210, CDPHE APCD Permit) (opens in a new tab), U.S. Environmental Protection Agency
  2. Colorado PUC Proceeding 24A-0442E: Public Service Company of Colorado (Xcel Energy) Large Load Data Center Interconnection Filing (opens in a new tab), Colorado Public Utilities Commission
  3. Aurora City Council votes down data center moratorium for second time amid Project Trident pushback (opens in a new tab), CBS Colorado, October 28, 2026
  4. Aurora City Council votes down data center ban. Again. (opens in a new tab), Colorado Public Radio, October 27, 2026

Reporting

  1. Vantage looking at alternative sites for Trident Data Center in Aurora - Colorado Politics (opens in a new tab), Colorado Politics, October 15, 2026, local outlet

5 sources on file.

Regional grid context

This site is in the WECC Rockies (RMPA) regional power market. 2024 to 2025 wholesale price effect: 7.7 percent (+$2.51 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 2028 projected wholesale price effect: 12.2 percent (+$3.76 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

What researchers have found

These studies measure different things. Some model wholesale market prices. Some measure what households actually paid. Some model what would happen under a policy change. The record shows each one as the authors stated it and does not rank them.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Vantage Data Centers Aurora Campus (Project Trident)", https://datacenterrecord.org/projects/vantage-data-centers-aurora-data-center-co, last verified October 28, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Vantage Data Centers Aurora Campus (Project Trident)", https://datacenterrecord.org/projects/vantage-data-centers-aurora-data-center-co. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
39.7982, -104.7354
How the location is known
Location is the city center; exact site not disclosed.
Location source
https://www.cbsnews.com/colorado/news/aurora-city-council-votes-down-data-center-moratorium/
Coordinate source
City of Aurora / Green Valley Ranch industrial corridor, Adams County, CO
Interconnection
Connection under study
Published
October 19, 2026
Last verified
October 28, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Capacity, if disclosed, Rating of the county's rows

Researcher view · Vantage Data Centers Aurora Campus (Project Trident) · 5 sources, 2 entries, 6 decisions nearby · basis and source tier on every row · verified October 28, 2026

Download CSV JSON