A permanent public ledger of 575 verified actions on the record. Each entry links directly to its underlying primary government document, council minutes, regulatory filing, or corroborated news report.

Opposition and Press Signals for September 10, 2026

National press investigations, local moratoriums, litigation, and community ratepayer pushback
1 tracked

Indiantown attorney drafting data center moratorium (opens in a new tab)

Local Moratorium FL

Indiantown Village Council voted unanimously to direct legal counsel to draft a data center moratorium and transparency ordinance as part of newly elected leadership efforts to pause data center applications.

Showing 575 of 575 entries
  1. Legislation Michigan
  2. Legislation Michigan

    S.B. 1179, Energy: other; reporting requirements for data centers; provide for. Creates new act.

    S.B. 1179 went to committee in the Senate. September 10, 2026.

  3. Legislation New Jersey

    A. 5396, Requires data centers to submit water supply emergency contingency plan to DEP.

    A. 5396 was introduced in the General Assembly. September 10, 2026.

  4. Legislation New Jersey

    A. 5396, Requires data centers to submit water supply emergency contingency plan to DEP.

    A. 5396 went to committee in the General Assembly. September 10, 2026.

  5. Legislation New Jersey

    A. 5397, Requires data centers to submit construction phase water usage plan to DEP.

    A. 5397 was introduced in the General Assembly. September 10, 2026.

  6. Legislation New Jersey

    A. 5397, Requires data centers to submit construction phase water usage plan to DEP.

    A. 5397 went to committee in the General Assembly. September 10, 2026.

  7. Legislation New Jersey

    A. 5373, Concerns noise abatement of data centers.

    A. 5373 was introduced in the General Assembly. September 10, 2026.

  8. Legislation New Jersey

    A. 5373, Concerns noise abatement of data centers.

    A. 5373 went to committee in the General Assembly. September 10, 2026.

  9. Jurisdiction Action Iowa

    Sioux County

    Planning and Zoning Board voted to recommend the draft ordinance to the supervisors on September 10, 2026.

  10. Vote: Moratorium extended Illinois Moratorium extended

    Troy

    Troy Planning Commission voted 5-0 on September 10 to extend data center moratorium until March 2027.

  11. Jurisdiction Action Michigan

    Ionia

    Ionia City Council and Planning Commission held joint informational meeting on September 10, 2026 to discuss data centers with MSU and Consumers Energy representatives.

  12. Jurisdiction Action North Dakota

    Morton County

    Morton County Commission approved data center ordinance on September 10, 2026.

  13. Jurisdiction Action Oregon

    Oregon

    The Data Center Advisory Committee released preliminary findings on September 10, 2026.

  14. Jurisdiction Action South Dakota

    Rapid City

    Rapid City Planning Commission voted unanimously on September 10 to delay a vote on proposed data center ordinance amendments to the November 4 meeting.

  15. Jurisdiction Action Federal

    United States (federal)

    DOE identified 16 potential sites for AI data center infrastructure on DOE lands.

  16. Public Statement Alaska

    Jonathan Kreiss-Tomkins, Democratic candidate for Alaska governor

    Plan requires local approval and ensures Alaskans do not shoulder electric rate increases or subsidize data center development. Said September 10, 2026.

  17. Public Statement Alaska

    Democratic candidate for Alaska governor

    Jonathan Kreiss Tomkins, Democratic candidate for governor, proposed a moratorium on all new data centers in Alaska until the legislature passes comprehensive regulation. Said September 10, 2026.

  18. Public Statement Alabama

    Democratic gubernatorial candidate

    Doug Jones accused Tuberville of ethical malpractice for accepting campaign funds from large tech companies currently building data centers in west Alabama. Said September 10, 2026.

  19. Public Statement Alabama

    Applied Digital Corporation donated $25,000 to Tommy Tuberville's gubernatorial campaign in August 2026. Said September 10, 2026.

  20. Public Statement Alabama

    Democratic gubernatorial candidate

    Doug Jones proposed a one year moratorium on data centers and higher property tax brackets for data centers. Said September 10, 2026.

  21. Public Statement Alabama

    Applied Digital Corporation also donated $100,000 to Republican Forward, a conservative Alabama super PAC. Said September 10, 2026.

  22. Public Statement Arkansas

    <UNKNOWN>

    Arkansas lawmaker forms trade association focused on AI and data center policy. Said September 10, 2026.

  23. Public Statement Colorado

    environmental nonprofits

    Colorado River flows have reduced by 20 percent since 2000. Said September 10, 2026.

  24. Public Statement Colorado

    environmental nonprofits

    Colorado River flows have reduced by 30 percent since 2019. Said September 10, 2026.

  25. Public Statement Connecticut

    assistant professor of agricultural and resource economics

    Shinsuke Tanaka stated that downwind pollution from power plants led to higher COVID-19 mortality rates. Said September 10, 2026.

  26. Public Statement Florida

    Republican gubernatorial candidate

    Byron Donalds says data center industry donations do not influence his policy positions. Said September 10, 2026.

  27. Public Statement Florida

    Republican gubernatorial candidate

    Donalds says data centers are essential to commercial space race and national security. Said September 10, 2026.

  28. Public Statement Florida

    Janet Smith, Interim Village Attorney, Indiantown Village

    "I have statutory exceptions that the Council can use for trade secrets. If someone is bringing forward a proposal considered a trade secret and they're willing to indemnify the Village while they speak to us so we can protect their records, then we have that opportunity. So, an NDA should not be needed." Said September 10, 2026, Indiantown Village Council Meeting.

  29. Public Statement Florida

    Janet Smith, Interim Village Attorney, Indiantown Village

    "What we would like to proffer to the Council is two ordinances. They will both have to go through planning and zoning and come before you on two separate readings. You will have public comment at each of those meetings. The first one is the moratorium that we feel will be legally defensible. The second one is the transparency ordinance." Said September 10, 2026, Indiantown Village Council Meeting.

  30. Public Statement Florida

    Republican gubernatorial candidate

    Donalds advocates for local control on data centers. Said September 10, 2026.

  31. Public Statement Georgia

    Thor Equities states each direct data center job at Kingston Technology Hub would create an additional 4.5 ancillary jobs. Said September 10, 2026.

  32. Public Statement Georgia

    Google representative

    Jen Ryan stated that Google worked with Columbia County leadership to exceed decibel standards and buffers for the data center. Said September 10, 2026.

  33. Public Statement Georgia

    Google representative Jen Ryan spoke at the Future Forward Summit about the Google data center coming to Columbia County, discussing standards for noise, lighting, and water usage. Said September 10, 2026.

  34. Public Statement Georgia

    Google representative

    Jen Ryan said data centers employ many people, citing hundreds of employees at the Douglas County data center on any given day. Said September 10, 2026.

  35. Public Statement Georgia

    Columbia County Commissioner Doug Duncan stated that Google was an opponent during negotiations but understood the county's vision. Said September 10, 2026.

  36. Public Statement Georgia

    Google representative

    Jen Ryan said the data center will follow certain standards when it comes to noise, lighting, and water usage. Said September 10, 2026.

  37. Public Statement Iowa

    Republican gubernatorial candidate

    Republican candidate Zach Lahn calls for a statewide pause on data center construction. Said September 10, 2026.

  38. Public Statement Iowa

    Democratic gubernatorial candidate

    Democratic candidate Rob Sand issued a standalone policy plan laying out his vision for data centers, calling for transparency, union jobs and setback requirements. Said September 10, 2026.

  39. Public Statement Iowa

    Democratic gubernatorial candidate

    Sand stated Iowans have been getting a raw deal from data centers. Said September 10, 2026.

  40. Public Statement Iowa

    NO Data Center Concert organized by Robbie Bahr held in protest on September 13 from 2 to 10 p.m. at Clinton, Iowa Bandshell. Said September 10, 2026.

  41. Public Statement Illinois

    Illinois PIRG cites extreme energy demand and enormous water use as data center problems. Said September 10, 2026.

  42. Public Statement Illinois

    Chicago Tribune Editorial Board

    Illinois experiencing higher electric bills directly translated from datacenter electricity consumption. Said September 10, 2026.

  43. Public Statement Illinois

    Illinois PIRG advocates for two year moratorium on large data centers. Said September 10, 2026.

  44. Public Statement Indiana

    Arnolt Center for Investigative Journalism

    Companies are using non disclosure agreements to hide data center project details from the public in Indiana. Said September 10, 2026.

  45. Public Statement Kansas

    Shawnee County Commissioner Kevin Cook addressed data center debate at county level. Said September 10, 2026.

  46. Public Statement Kansas

    Coalition demands state and local policies prioritizing health, safety, welfare of Kansas communities with guardrails on water, energy, air, land, transportation, health. Said September 10, 2026.

  47. Public Statement Kentucky

    International Brotherhood of Electrical Workers strongly supports data centers because they require large numbers of electricians. Said September 10, 2026.

  48. Public Statement Louisiana

    Walter Mugdan, former EPA deputy regional administrator, said public involvement in pollution decision making matters and government should open doors not close them. Said September 10, 2026.

  49. Public Statement Louisiana

    resident (Covington, LA)

    Matt Hardey warns that electric bills could double if generating plants become stranded assets after 15 year data center contracts end. Said September 10, 2026.

  50. Public Statement Louisiana

    Dr. Lynn Goldman, former EPA assistant administrator, said data center pollution poses health risks and EPA is weakening safeguards. Said September 10, 2026.

  51. Public Statement Louisiana

    Louisiana state

    Project must fully fund its own power generation and grid infrastructure costs. Said September 10, 2026.

  52. Public Statement Massachusetts

    Republican gubernatorial candidate

    Republican Mike Minogue challenging Healey for governorship criticized her data center stance. Said September 10, 2026.

  53. Public Statement Maryland

    Louisa Conklin, Frederick County Council member, stated data center developers have legal avenues to protect themselves from council oversight and that water protection is a community priority. Said September 10, 2026.

  54. Public Statement Michigan

    2026 Democratic U.S. Senate candidate for Michigan

    El Sayed calls for state and local moratorium on data centers until conditions are met. Said September 10, 2026.

  55. Public Statement Michigan

    U.S. Representative and Republican gubernatorial nominee

    U.S. Rep. John James, Republican gubernatorial nominee, called for moratorium on new data centers until plan to protect people is in place, including environmental protections and ensuring electricity bills do not go up. Said September 10, 2026.

  56. Public Statement Michigan

    Jean Hardy, Michigan State University Associate Professor with the Department of Media and Information, said a data center proposal to Ionia, if it came, would be many years out and is unlikely. Said September 10, 2026.

  57. Public Statement Michigan

    Ypsilanti-area residents

    Residents spoke against a proposed University of Michigan data and research center during a town hall meeting. Said September 10, 2026.

  58. Public Statement Michigan

    Consumers Energy representatives stated that data centers would not automatically increase electricity rates for nearby residents, as utility rates are subject to state regulatory approval. Said September 10, 2026.

  59. Public Statement Michigan

    Environmental Protection Network issued AI data center report detailing Trump administration actions that could increase pollution related health risks. Said September 10, 2026.

  60. Public Statement Michigan

    Michigan State University Associate Professor

    Jean Hardy noted that Ionia has existing water capacity, including infrastructure from the former correctional facility, which could potentially be repurposed for a data center if one came to the area. Said September 10, 2026.

  61. Public Statement Michigan

    University of Michigan vice president for Government Relations

    Chris Kolb, the U of M vice president for Government Relations, said the university is working with the local community. Said September 10, 2026.

  62. Public Statement Michigan

    University of Michigan interim vice president for Research and Innovation

    Patricia Hurn, U of M interim vice president for Research and Innovation, spoke about the project. Said September 10, 2026.

  63. Public Statement Michigan

    2026 Democratic U.S. Senate candidate for Michigan

    Abdul El Sayed states his conditions for University of Michigan data center: all union labor, no utility rate increases, no water use, revenue investment in reliability, and community benefits agreement. Said September 10, 2026.

  64. Public Statement Minnesota

    Andrea Zupancich, Republican candidate for Minnesota state Senate

    Grant Hauschild as part of Senate Tax Committee greenlit bills giving tax breaks to data centers. Said September 10, 2026.

  65. Public Statement Minnesota

    U.S. Senator

    Amy Klobuchar stated she would require any data center project to cover 100 percent of energy and grid costs. Said September 10, 2026.

  66. Public Statement Minnesota

    Jobs for Minnesotans executive

    Jobs for Minnesotans supports local data center development and trusts Minnesota's strict policies protecting environment, water quality, and energy generation. Said September 10, 2026.

  67. Public Statement Minnesota

    Minnesota House Speaker

    Lisa Demuth, House Speaker, negotiated bipartisan legislation that passed protecting Minnesotans' energy bills and putting data centers on the same playing field as other businesses for energy costs. Said September 10, 2026.

  68. Public Statement Minnesota

    Republican candidate for Minnesota state Senate

    Jobs for Minnesotans nonprofit board member Andrea Zupancich opposes tax breaks for data centers while running for state Senate against Grant Hauschild who supports them. Said September 10, 2026.

  69. Public Statement Missouri

    State Representative

    Rep. Jeff Myers represents District 42, which includes Montgomery and Warren Counties, where a large data center is being built. Said September 10, 2026.

  70. Public Statement Missouri

    Nick Kasoff, Ferguson councilmember, said the plan would freeze the assessed value of the former Emerson campus at its 2024 assessment rate with a 75 percent tax abatement for the first 10 years. Said September 10, 2026.

  71. Public Statement Missouri

    Adrian Shropshire, Ferguson mayor, opposed the data center proposal and plans to vote against it. Said September 10, 2026.

  72. Public Statement Montana

    NorthWestern Energy said it is in conversation with at least 11 data center developers. Said September 10, 2026.

  73. Public Statement Montana

    NorthWestern Energy associate general counsel Mike Green stated that preventing any cost shifting is not realistic. Said September 10, 2026.

  74. Public Statement North Dakota

    company officials

    Applied Digital held a town hall meeting on its Harwood data center in August 2025 after construction plans were finished. Said September 10, 2026.

  75. Public Statement New Hampshire

    Councilor Phil Jones cited concerns about noise, energy and water use, diesel generators, property values and infrastructure for large scale commercial data center facilities. Said September 10, 2026.

  76. Public Statement New Jersey

    RMI

    The report outlined how data centers and other large electricity customers could help finance and scale distributed capacity. Said September 10, 2026.

  77. Public Statement New Jersey

    RMI published a report in November 2025 making the case that off site demand flexibility, energy efficiency, and distributed generation can help meet rapidly growing data center electricity demand. Said September 10, 2026.

  78. Public Statement New Jersey

    RMI

    Since the report's publication, new laws, commission decisions, and utility proposals have begun creating pathways for large customers to fund distributed capacity. Said September 10, 2026.

  79. Public Statement Nevada

    Critics say the risk to local power bills isn't worth it. Said September 10, 2026.

  80. Public Statement Nevada

    Clark County Education Association

    CCEA estimates their proposal could bring $2 billion in local schools support tax to the state pupil centered funding formula in four years. Said September 10, 2026.

  81. Public Statement Nevada

    Dina Neal is a Nevada state senator. Said September 10, 2026.

  82. Public Statement Nevada

    John Vellardita, Clark County Education Association Executive Director

    Clark County Education Association proposes requiring data centers to pay Local School Support Tax, a 2.6 percent tax on retail sales. Said September 10, 2026.

  83. Public Statement Nevada

    Attorney General Aaron Ford said he supports a pause on data center tax abatements if elected. Said September 10, 2026.

  84. Public Statement Nevada

    Clark County Education Association

    New or expanding data centers receive a 75 percent abatement on personal property tax and pay a reduced sales and use tax rate of 2 percent for 10 to 20 years. Said September 10, 2026.

  85. Public Statement Nevada

    Interior Board of Land Appeals judge

    Judge David Gunter found appellants likely to prevail requiring Bureau of Land Management to provide new environmental studies and public input before project can proceed. Said September 10, 2026.

  86. Public Statement Nevada

    John Vellardita, Clark County Education Association Executive Director

    Data centers receive property tax breaks up to 75 percent for 10 or 20 years, contingent on retaining 10 or 50 full time employees. Said September 10, 2026.

  87. Public Statement Nevada

    Gov. Joe Lombardo is supportive of data centers and says state has safeguards in place. Said September 10, 2026.

  88. Public Statement Nevada

    State Sen. Dina Neal requested drafting bill to end tax abatements and implement moratorium on data centers. Said September 10, 2026.

  89. Public Statement Nevada

    Geneva Zoltek, climate reporter

    Nevada experiencing data center boom with massive power demand. Said September 10, 2026.

  90. Public Statement Nevada

    Clark County Education Association

    CCEA proposes ending abatement of local schools support tax for data centers. Said September 10, 2026.

  91. Public Statement Nevada

    CCEA Executive Director

    John Vellardita says there are seven to nine new data centers planned to open in Nevada. Said September 10, 2026.

  92. Public Statement New York

    James Rogan, former U.S. diplomat

    Author states that electricity prices remain highest in states that mandated green transitions without adequate baseload power. Said September 10, 2026.

  93. Public Statement New York

    Microsoft executives

    Microsoft temporarily paused select data center developments around early 2025 due to concerns about overbuilding. Said September 10, 2026.

  94. Public Statement Ohio

    U.S. Senator

    Bernie Moreno plans to introduce federal legislation aimed at eliminating the financial benefit of state and local tax incentives for data centers. Said September 10, 2026.

  95. Public Statement Ohio

    U.S. Senator

    Moreno proposes imposing a federal tax equal to 100% of any tax incentive provided to a data center by a state or local government. Said September 10, 2026.

  96. Public Statement Ohio

    State Rep.

    Rader raised concern about private equity owning both data centers and power companies serving the same grid. Said September 10, 2026.

  97. Public Statement Ohio

    Ohio Democratic Party held rally in Bowling Green to denounce Jon Husted for bringing hundreds of data centers to Ohio. Said September 10, 2026.

  98. Public Statement Ohio

    U.S. Senator

    Moreno criticized a 4.5 million dollar Ohio tax incentive connected to a data center expansion backed by the Carlyle Group in March 2026, arguing the project was expected to create only 10 new jobs. Said September 10, 2026.

  99. Public Statement Ohio

    U.S. Senator

    Jon Husted introduced the Ratepayer Protection Act in July 2026, requiring states to consider standards for connecting large electricity users, including data centers, to the electric grid. Said September 10, 2026.

  100. Public Statement Ohio

    Ohio State Representative

    Daniel Troy stated Ohio is a national leader in both operational data centers and tax breaks offered to these facilities. Said September 10, 2026.

  101. Public Statement Ohio

    Wood County auditor candidate

    Mark Wongrowski said Meta data center north of Bowling Green in Middleton Township required 75 percent tax abatement for 15 years. Said September 10, 2026.

  102. Public Statement Ohio

    Cleveland Councilman Ward 15

    Ward 15 Cleveland Councilman Charles Slife proposed updating the city's zoning code to prevent data center workarounds. Said September 10, 2026.

  103. Public Statement Ohio

    State Rep. Tristan Rader warned Ohioans about unrestricted data center growth and conflict of interest concerns. Said September 10, 2026.

  104. Public Statement Ohio

    Mark Wongrowski, Wood County auditor candidate

    Ohio electricity bills have gone up double the national average. Said September 10, 2026.

  105. Public Statement Ohio

    Beth Cole, Middleton Township resident

    Meta data center footprint is now 5 percent of Middleton Township. Said September 10, 2026.

  106. Public Statement Ohio

    Ohio State Representative

    Democratic Rep. Tristan Rader proposes repealing the sales tax exemption and renegotiating past deals with Amazon, Meta and Google. Said September 10, 2026.

  107. Public Statement Oregon

    Courtney Lee, senior manager for state and local policy, Amazon Web Services

    Amazon representative said Amazon data center uses less water than local agriculture industry. Said September 10, 2026.

  108. Public Statement Oregon

    Courtney Lee, senior manager for state and local policy, Amazon Web Services

    Amazon representative said company runs diesel generators about 12 hours per year for testing and maintenance. Said September 10, 2026.

  109. Public Statement Oregon

    Jim Doherty, former Morrow County Commissioner, said opposition to data centers is a unifying moment between rural and urban Oregon. Said September 10, 2026.

  110. Public Statement Oregon

    Chair, Morrow County Board of Commissioners

    David Sykes, chair of the Morrow County Board of Commissioners, said decisions over data centers on private property are up to local government. Said September 10, 2026.

  111. Public Statement Pennsylvania

    Sean Trende, American Enterprise Institute

    Republicans oppose data centers with a bare majority opposed and just 29 percent strongly opposed. Said September 10, 2026.

  112. Public Statement Pennsylvania

    Sean Trende, American Enterprise Institute

    By July 2026, support for data centers in or near community was down to 22 percent, opposition was up to 57 percent. Said September 10, 2026.

  113. Public Statement Pennsylvania

    Sean Trende, American Enterprise Institute

    In December 2025, 34 percent of Pennsylvanians supported data centers in or near their community, 42 percent opposed, and 24 percent had no strong opinion. Said September 10, 2026.

  114. Public Statement Pennsylvania

    Sean Trende, American Enterprise Institute

    Democrats oppose data centers more than other groups, with 71 percent opposed and more than half strongly opposed. Said September 10, 2026.

  115. Public Statement Pennsylvania

    Democratic candidate

    Bob Harvie called for a data center moratorium in his campaign. Said September 10, 2026.

  116. Public Statement Pennsylvania

    Sean Trende, American Enterprise Institute

    In Pennsylvania 7th Congressional District, opposition to data centers runs 74 percent to 14 percent support. Said September 10, 2026.

  117. Public Statement Pennsylvania

    Harvie previously supported tax break for Amazon data center in Falls Township during Bucks County Commissioners vote in December 2020. Said September 10, 2026.

  118. Public Statement South Carolina

    Southern Environmental Law Center advocated for a pause on data centers and raised concerns about a data center currently under construction on South Pine Street. Said September 10, 2026.

  119. Public Statement South Carolina

    Sarah Knox, director of external affairs for NorthMark Strategies

    NorthMark is complying with state laws and is still waiting on an air permit to operate and hopes to receive it by the end of the year. Said September 10, 2026.

  120. Public Statement South Carolina

    Lee Zeldin, EPA director, said making the United States the artificial intelligence capital of the world is the agency's top priority. Said September 10, 2026.

  121. Public Statement Texas

    Matt Krause, Tarrant County Commissioner

    A planned data center in Westlake was discussed at the town hall. Said September 10, 2026.

  122. Public Statement Texas

    Kate Franko, Fluidstack head of public affairs

    Fluidstack will pay full local property taxes without requesting tax abatements or county incentives. Said September 10, 2026.

  123. Public Statement Texas

    Kate Franko, Fluidstack head of public affairs

    Fluidstack will pay for its own energy and infrastructure. Said September 10, 2026.

  124. Public Statement Texas

    Tarrant County Commissioner

    Krause said the state could develop a legislative agenda for data centers for the 2027 session. Said September 10, 2026.

  125. Public Statement Virginia

    Susanne DeHart, Pulaski County citizen

    Tax rate for the data center facility is unknown but guaranteed not the same as citizens of Pulaski County who will have property reassessed in 2027. Said September 10, 2026.

  126. Public Statement Virginia

    Suhas Subramanyam, U.S. Representative

    The Data Infrastructure Risk Reduction Act would require development of a strategy to protect communities near data centers from national security threats. Said September 10, 2026.

  127. Public Statement Virginia

    Suhas Subramanyam, U.S. Representative

    Data Center Fair Share Act requires data centers and other large energy users to pay the full cost of grid and generation upgrades needed to serve them. Said September 10, 2026.

  128. Public Statement Virginia

    Suhas Subramanyam, U.S. Representative

    The Data Center Fair Share Act would require states to establish utility rates to make data centers pay full incremental grid upgrade costs, with loss of federal highway funding as penalty for non compliance. Said September 10, 2026.

  129. Public Statement Virginia

    U.S. Representative (Virginia's 10th district)

    U.S. Rep. Suhas Subramanyam announced a four bill National Data Center Plan to establish national standards for data center siting, utility rates, energy and water measurement, and infrastructure security. Said September 10, 2026.

  130. Public Statement Virginia

    David Aldrich and Chris Miller

    Each transmission line corridor has a minimum 300 foot wide right of way affecting rural and suburban communities. Said September 10, 2026.

  131. Public Statement Virginia

    David Aldrich and Chris Miller

    Data centers require thousands of miles of new transmission lines, hundreds of new substations, and dozens of new power plants. Said September 10, 2026.

  132. Public Statement Virginia

    Suhas Subramanyam, U.S. Representative

    The Data Infrastructure Energy Measurement and Standards Act would direct NIST to develop standards for measuring data center energy and water consumption. Said September 10, 2026.

  133. Public Statement Virginia

    David Aldrich and Chris Miller

    Virginia needs to immediately pause all data center contracts for interconnections to the power grid until a plan addresses six critical issues. Said September 10, 2026.

  134. Public Statement Virginia

    David Aldrich and Chris Miller

    If 85 GW of data center capacity were built out, Virginia's current power grid would quadruple in size. Said September 10, 2026.

  135. Public Statement Virginia

    U.S. Representative

    Rep. Subramanyam introduced bills directing government agencies to create official standards for measuring data center energy and water use. Said September 10, 2026.

  136. Public Statement Virginia

    Suhas Subramanyam, U.S. Representative

    Residents report utility bills doubling due to data center infrastructure demands. Said September 10, 2026.

  137. Public Statement Virginia

    Suhas Subramanyam, U.S. Representative

    The Responsible Data Center Siting Act would direct the U.S. Department of Energy to establish best practices for data center siting considering electricity, water, environment, noise, security, workforce and tax revenue. Said September 10, 2026.

  138. Public Statement Virginia

    Suhas Subramanyam, U.S. Representative

    Four bills include Responsible Data Center Siting Act, Data Center Fair Share Act, Data Infrastructure Energy Measurement and Standards Act, and Data Infrastructure Risk Reduction Act. Said September 10, 2026.

  139. Public Statement Wisconsin

    Anirban Basu, chief economist at Associated Builders and Contractors

    Data center related construction activity was byproduct of nonresidential specialty trade employment growth. Said September 10, 2026.

  140. Public Statement Wisconsin

    Alliant Energy President of Wisconsin operations

    Becky Valcq, President of Alliant Energy's Wisconsin electric company and Vice President of Energy Delivery, spoke at an educational session about data centers. Said September 10, 2026.

  141. Public Statement West Virginia

    Governor

    Gov. Patrick Morrisey highlights economic development with hyperscale data centers. Said September 10, 2026.

  142. Public Statement Wyoming

    Eric Schlidt, Prometheus Build Wyoming director

    Prometheus is asking commissioners to bypass the state industrial siting review to speed up build time. Said September 10, 2026.

  143. Public Statement Wyoming

    vice president of policy, Rewiring America

    Kristin Eberhard, vice president of policy with Rewiring America, said the concern is not just knee jerk resistance to growth but opposition to communities absorbing costs while others get benefits. Said September 10, 2026.

  144. Vote: Moratorium California Moratorium

    San Francisco

    San Francisco considering moratorium on new data centers.

  145. Vote: Moratorium Florida Moratorium

    Florida

    Hillsborough County Commissioners voted unanimously last month to draft moratorium on data centers and develop land use rules prohibiting facilities from using drinking water for cooling.

  146. Jurisdiction Action Florida

    Palm Beach County

    Palm Beach County Commissioners rejected planned hyperscale data center campus in July by 5-1 vote.

  147. Vote: Moratorium Florida Moratorium

    Florida

    More than a dozen Florida counties have adopted or advanced moratoriums or bans by late June, including Clay, Lake and Nassau counties.

  148. Jurisdiction Action Florida

    Florida

    Governor Ron DeSantis signed law in May codifying local governments' power to regulate data center developments through comprehensive plans.

  149. Vote: Moratorium Florida Moratorium

    Miami Lakes

    Miami Lakes Town Council set to consider item by Steven Herzberg to trigger development of ordinance defining and prohibiting dedicated data centers as principal use.

  150. Jurisdiction Action Iowa

    Salix

    Salix, IA city leaders discussed a data center ordinance and future conversations with Google.

  151. Jurisdiction Action Iowa

    Salix

    Salix city leaders discussed data center ordinance and future conversations with Google.

  152. Jurisdiction Action Iowa

    Hancock County

    Three dozen people spoke at public hearing, majority opposing the data center.

  153. Jurisdiction Action Iowa

    Hancock County

    MCNI requested rezoning of 724 acres in Concord Township from agricultural to industrial for data center development.

  154. Jurisdiction Action Iowa

    Hancock County

    Hancock County Planning and Zoning Commission voted unanimously to deny zoning change request for data center near Garner.

  155. Jurisdiction Action Illinois

    Illinois

    Gov. Pritzker in June suspended state tax breaks for datacenters in effect since 2020.

  156. Jurisdiction Action Kentucky

    Kentucky

    A Kentucky think tank identified potential loopholes in data center tax incentive policy.

  157. Jurisdiction Action Kentucky

    Kentucky

    Kentucky schools and local governments may receive tax benefits from data center projects.

  158. Jurisdiction Action Kentucky

    Kentucky

    Kentucky state law exempts manufacturing facilities using significant energy from sales tax on energy expenses exceeding 3 percent of gross production costs.

  159. Jurisdiction Action Kentucky

    Kentucky

    Power service agreement subject to approval by Kentucky Public Service Commission.

  160. Jurisdiction Action Louisiana

    Calcasieu Parish

    Project requires Calcasieu Parish Planning and Zoning Board approval.

  161. Jurisdiction Action Louisiana

    Louisiana

    The Lightning Amendment speeds data center approval process with little or no public oversight.

  162. Jurisdiction Action Louisiana

    Louisiana

    The Public Service Commission is negotiating contract terms for data centers to cover power generation costs for 15 years.

  163. Vote: Moratorium Massachusetts Moratorium

    Massachusetts

    Massachusetts paused data center sales tax exemption.

  164. Jurisdiction Action Massachusetts

    Massachusetts

    Governor Maura Healey issued executive order requiring data centers over 25 megawatts to supply 100 percent of electricity through clean energy or contribute to ratepayer protection fund.

  165. Jurisdiction Action Massachusetts

    Massachusetts

    Governor Maura Healey issued Executive Order 658 establishing framework for data center development.

  166. Jurisdiction Action Massachusetts

    Massachusetts

    Framework required data centers to bring or fund clean energy generation sufficient to meet 100 percent of demand released June 2026.

  167. Jurisdiction Action Massachusetts

    Massachusetts

    Data centers must demonstrate clean energy compliance before state permits; community approval required.

  168. Jurisdiction Action Massachusetts

    Massachusetts

    Payments go into Ratepayer Protection Fund to mitigate electricity supply costs.

  169. Jurisdiction Action Massachusetts

    Massachusetts

    MassDEP must establish alternative compliance payment mechanism by December 31 2026 for projects not meeting clean energy requirement.

  170. Jurisdiction Action Massachusetts

    Massachusetts

    Massachusetts previously stopped offering sales tax incentives for data centers.

  171. Jurisdiction Action Massachusetts

    Massachusetts

    Developers must arrange and finance own clean energy and related infrastructure or chip into ratepayer protection fund.

  172. Jurisdiction Action Massachusetts

    Massachusetts

    Order outlaws nondisclosure deals between state agencies and data center developers.

  173. Jurisdiction Action Massachusetts

    Massachusetts

    Governor Healey signed executive order requiring data center projects to need local buy in via community benefits agreements before state will sign off.

  174. Jurisdiction Action Michigan

    Michigan

    Michigan utility regulator will decide whether to approve DTE Energy contracts for Google's 1 gigawatt data center project in Van Buren Township.

  175. Jurisdiction Action Michigan

    Ypsilanti Township

    Community town hall scheduled for October 1, 2026 at 5:30 PM at Ann Arbor Marriott Ypsilanti at Eagle Crest.

  176. Jurisdiction Action Michigan

    Ypsilanti Township

    University of Michigan Board of Regents meeting scheduled for September 17, 2026.

  177. Jurisdiction Action Michigan

    Ypsilanti Township

    Ypsilanti Township Board of Trustees meeting scheduled for September 15, 2026 at 6:00 PM.

  178. Vote: Moratorium adopted Michigan Moratorium adopted

    Ypsilanti Township

    Township utility provider enacted moratorium on supplying data centers with water.

  179. Jurisdiction Action Michigan

    Ypsilanti Township

    Ypsilanti Township passed resolutions opposing the project.

  180. Jurisdiction Action Michigan

    Ypsilanti Township

    A town hall was held on a proposed high performance research computing center.

  181. Jurisdiction Action Michigan

    Ypsilanti Township

    University of Michigan leaders held town hall discussion about high performance research computing center in Ypsilanti Township.

  182. Jurisdiction Action Minnesota

    Minnesota

    Minnesota legislature successfully passed a standalone data center bill in 2025 that included environmental regulation, a repeal of a sales tax exemption on electricity, and a later expiration of sales exemptions on software and hardware.

  183. Jurisdiction Action Minnesota

    Minnesota

    Minnesota legislature in 2026 had bipartisan effort to ban non disclosure agreements for data centers, but the bill died.

  184. Vote: Moratorium Minnesota Moratorium

    Minnesota

    Data center moratoriums create delays increasing legal, engineering, environmental, utility and financing costs.

  185. Vote: Moratorium Minnesota Moratorium

    Minnesota

    Development moratorium can pause rezoning, conditional use permits, site plan approvals, subdivision approvals.

  186. Vote: Moratorium Minnesota Moratorium

    Minnesota

    Minnesota municipalities have generally imposed initial data center moratoriums of up to one year.

  187. Vote: Moratorium Missouri Moratorium

    Desloge

    Public comments called for a planning moratorium on data centers.

  188. Jurisdiction Action Missouri

    Desloge

    Several hundred regional residents attended and public comments largely opposed the idea.

  189. Jurisdiction Action Missouri

    St. Louis

    The proposed Board of Aldermen Bill 24 is scheduled for a final board vote Friday.

  190. Jurisdiction Action Missouri

    St. Louis

    Board of Aldermen Bill 24 recently advanced to establish a zoning framework for where data centers can operate and how the city addresses energy use, noise, lighting and compatibility with surrounding neighborhoods.

  191. Jurisdiction Action Missouri

    Ferguson

    The proposal requires the developer to pay Ferguson Neighborhood Improvement Program $7.5 million over 10 years.

  192. Jurisdiction Action Missouri

    Ferguson

    Ferguson councilmembers reintroduced legislation Wednesday for $1.5 billion in tax incentives and up to $22 billion in industrial revenue bonds for the Emerson campus data center redevelopment.

  193. Jurisdiction Action Missouri

    Ferguson

    Ferguson City Council voted 3-3 with one abstention on a data center tax break proposal in May 2026.

  194. Jurisdiction Action Montana

    Missoula County

    Missoula County is preparing study on data center impacts and mitigation strategies, with draft presentations planned for November 4 and 12, 2026.

  195. Vote: Moratorium Montana Moratorium

    Missoula County

    Missoula County implemented one year moratorium on new or expanded data centers effective July 9, 2026.

  196. Jurisdiction Action North Dakota

    Harwood

    Charter amendment to require transparency in industrial negotiations is set for Harwood ballot in November.

  197. Jurisdiction Action New Jersey

    Spotswood

    Spotswood city council sent a data center zoning proposal to the planning board.

  198. Jurisdiction Action New Jersey

    New Jersey

    New Jersey and Virginia are considering regulations to prevent data centers from shifting increased power usage costs to customers.

  199. Jurisdiction Action Nevada

    Nevada

    CCEA proposal includes mandatory transparency and audits for data center environmental compliance.

  200. Jurisdiction Action Nevada

    Nevada

    CCEA proposal requires data center water to be returned to Nevada if drawn from state.

  201. Jurisdiction Action Nevada

    Nevada

    CCEA proposal requires communities to have local control over whether data center is built and location.

  202. Jurisdiction Action Nevada

    Nevada

    CCEA proposal requires data centers to build their own power and cannot draw on state power grid.

  203. Jurisdiction Action Nevada

    Nevada

    Clark County Education Association proposes eliminating Local School Support Tax abatement for data centers.

  204. Jurisdiction Action Nevada

    Nevada

    Senate Bill 170 provided sales and property tax abatements to attract data centers to Nevada.

  205. Vote: Moratorium Nevada Moratorium

    Nevada

    The proposed moratorium could be taken up during the 2027 legislative session.

  206. Vote: Moratorium Nevada Moratorium

    Nevada

    Nevada lawmakers moved to draft legislation for a potential moratorium on new data center development during a legislative revenue committee meeting in late August.

  207. Jurisdiction Action Nevada

    Nevada

    Tax abatements last for 10 or 20 years depending on capital expenditures and jobs created.

  208. Jurisdiction Action Nevada

    Nevada

    Data centers pay reduced sales and use tax rate of 2%.

  209. Jurisdiction Action Nevada

    Nevada

    New or expanding data centers receive 75% abatement on personal property tax.

  210. Jurisdiction Action Nevada

    Nevada

    Clark County Education Association unveiled plan to end abatement of local schools support tax for data centers.

  211. Jurisdiction Action Nevada

    Nevada

    NV Energy will need to more than double its current electricity load by 2046 to meet data center demand.

  212. Vote: Moratorium Nevada Moratorium

    Nevada

    Interim revenue committee of lawmakers voted to draft a bill to pause data centers across Nevada and repeal tax abatements.

  213. Jurisdiction Action Ohio

    Ohio

    Ohio Data Center Tax Exemption established in 2013 as 100 percent sales tax exemption.

  214. Jurisdiction Action Ohio

    Ohio

    House Bill 999 introduced to ban property tax exemptions for data centers and examine termination of existing abatements.

  215. Jurisdiction Action Ohio

    Ohio

    Lawmakers expect data center reform proposals may be consolidated into House Bill 646.

  216. Jurisdiction Action Ohio

    Ohio

    House Bill 646 attempted and failed to pass before June 2026 General Assembly recess.

  217. Jurisdiction Action Ohio

    Ohio

    Rep. Daniel Troy introduced proposal for eliminating property tax abatements for data centers.

  218. Jurisdiction Action Ohio

    Ohio

    Rep. David Thomas drafting language to eliminate property tax abatements for data centers.

  219. Vote: Moratorium Ohio Moratorium

    Ohio

    Governor Mike DeWine paused data center sales tax exemptions via executive order earlier in 2026.

  220. Jurisdiction Action Ohio

    Ohio

    Rep. Tristan Rader introduced bill to prohibit data center companies from receiving any new state sales tax exemptions.

  221. Jurisdiction Action Ohio

    Ohio

    Some Ohio legislators want to repeal the data center tax exemption outright and reopen long term agreements.

  222. Vote: Moratorium Ohio Moratorium

    Ohio

    Ohio Governor Mike DeWine froze new applications for data center tax exemptions.

  223. Vote: Moratorium Ohio Moratorium

    Ohio

    In May 2026, Gov. Mike DeWine paused new applications for the data center sales tax exemption after public backlash over the scale of the tax break.

  224. Vote: Moratorium Ohio Moratorium

    Ohio

    Gov. Mike DeWine paused new data center incentives earlier in 2026 after reporting indicated the cost of existing incentives in 2025 was substantially higher than previously projected.

  225. Jurisdiction Action Ohio

    Ohio

    Ohio law provides tax exemptions for certain computer data center equipment and investments under a program that took effect in 2025.

  226. Jurisdiction Action Oregon

    Oregon

    Kotek issued an executive order pausing any new developments on state owned land.

  227. Vote: Moratorium Oregon Moratorium

    Oregon

    Oregon Gov. Tina Kotek announced support for a statewide moratorium on the construction of new data centers.

  228. Jurisdiction Action Oregon

    Salem

    Salem Data Center Task Force is crafting a policy proposal for city council approval.

  229. Jurisdiction Action Oregon

    Salem

    Salem city scheduled third town hall on data center policies on October 20.

  230. Jurisdiction Action Oregon

    Salem

    Salem city scheduled second town hall on data center policies on October 6.

  231. Jurisdiction Action Oregon

    Salem

    Salem city scheduled first town hall on data center policies on September 15 at 5-7 p.m.

  232. Jurisdiction Action Pennsylvania

    Wyoming County

    Wyoming County commissioners voted to formally adopt an amendment to the county's Subdivision and Land Development Ordinance for data center development.

  233. Jurisdiction Action Pennsylvania

    Indiana County

    Tabling decision triggers 90 day investigation period for Planning Commission review.

  234. Jurisdiction Action Pennsylvania

    Indiana County

    Indiana County Planning Commission voted to table Amazon Web Services application for data centers in Center and Black Lick Townships.

  235. Jurisdiction Action South Carolina

    South Carolina

    South Carolina passed ruling that power plants for data centers can be constructed without review or approval from state's regulatory commission.

  236. Jurisdiction Action South Carolina

    South Carolina

    South Carolina Public Service Commission ruled that private technology company generating power for its own use not subject to Utility Siting Act.

  237. Vote: Moratorium South Carolina Moratorium

    South Carolina

    A third and final vote on the one year moratorium is expected later this month, on September 21.

  238. Vote: Moratorium South Carolina Moratorium

    South Carolina

    The meeting followed a delayed vote last month on a proposed one year moratorium on data centers.

  239. Jurisdiction Action South Carolina

    South Carolina

    Spartanburg County Council held a special called meeting on data centers.

  240. Jurisdiction Action South Carolina

    Spartanburg County

    Residents stormed out during data center debate in Spartanburg County.

  241. Vote: Moratorium adopted Texas Moratorium adopted

    Texas

    Texas Gov. Abbott imposed a moratorium on data center development in the state.

  242. Jurisdiction Action Federal

    United States (federal)

    EPA proposed change would let developers start building data centers before permits are approved.

  243. Jurisdiction Action Federal

    United States (federal)

    EPA plans to scrap federal requirement that states tell the public and allow public comment before approving air pollution permits for industrial facilities including data centers and power plants.

  244. Jurisdiction Action Federal

    United States (federal)

    More than 10 states are reconsidering or pausing tax breaks for data centers.

  245. Jurisdiction Action Virginia

    Virginia

    New Jersey and Virginia are considering regulations to prevent data centers from shifting increased power usage costs to customers.

  246. Jurisdiction Action Virginia

    Pulaski County

    Survey of NRV Commerce Park website showed 102 responses; 95 percent opposed data centers in Pulaski County.

  247. Jurisdiction Action West Virginia

    West Virginia

    Communities from Putnam County to Tucker County formed Data Center Accountability Project to demand state and local leaders prioritize communities over computers.

  248. Jurisdiction Action West Virginia

    West Virginia

    Multiple data center projects have been proposed across West Virginia.

  249. Key Figure Cartersville, Bartow County, GA

    Bisnow

    Kingston Technology Hub estimated cost is $1 billion. Cartersville, Bartow County, GA, 2026.

    Key Figure 1,000,000,000 USD
  250. Key Figure Texas, statewide

    yahoo.com

    Texas planned gas generation grew 50 percent. Texas, statewide, 2026.

    Key Figure 50 percent
  251. Key Figure Nevada, statewide

    ktnv.com

    Data centers consumed 22 percent of Nevada electricity generation capacity in 2024 according to Desert Research Institute. Nevada, statewide, 2026.

    Key Figure 22 percent
  252. Key Figure United States, statewide

    Wyoming Public Media

    74% of survey respondents said they would be more supportive of data centers if developers helped offset their home electricity costs. United States, statewide, 2026.

    Key Figure 74 percent
  253. Key Figure Beaver County, PA

    Pittsburgh Post-Gazette

    Project Phoenix is a 2 gigawatt data center project. Beaver County, PA, 2026.

    Key Figure 2 GW
  254. Key Figure Nevada, statewide

    Nevada Current

    Nevada abated $90 million in sales tax for data centers in 2021 and 2022. Nevada, statewide, 2026.

    Key Figure 90,000,000 USD
  255. Key Figure Clark County, Nevada, NV

    kolotv.com

    State could capture minimum 500 million dollars annually for K-12 education if abatements eliminated. Clark County, Nevada, NV, 2026.

    Key Figure 500,000,000 dollars a year
  256. Key Figure LA

    Louisiana Illuminator

    University of California Riverside and California Institute of Technology 2026 study estimated data center pollution could cause roughly 600,000 asthma cases and 1,300 premature deaths under rapid development scenario by 2028. LA, 2026.

    Key Figure 600,000 asthma cases
  257. Key Figure Texas, statewide

    yahoo.com

    Texas already has 81.7 gigawatts of gas power in operation. Texas, statewide, 2026.

    Key Figure 81.7 GW
  258. Key Figure Colorado Springs, El Paso County, CO

    Colorado Public Radio

    At 50 megawatts, Project Taurus would consume about a quarter of the monthly power used by all households in Colorado Springs. Colorado Springs, El Paso County, CO, 2026.

    Key Figure 50 MW
  259. Key Figure Kentucky, statewide

    mountain-topmedia.com

    International Brotherhood of Electrical Workers donated $206,000 to In This Together, Kentucky Gov. Beshear's PAC, making the union the fourth largest donor since 2023. Kentucky, statewide, 2026.

    Key Figure 206,000 USD
  260. Key Figure Pulaski County, AR

    arkansasonline.com

    Initial power demand of 150 megawatts with potential growth to one gigawatt. Pulaski County, AR, 2026.

    Key Figure 150 MW
  261. Key Figure Ypsilanti Township, Michigan

    cbsnews.com

    The facility is a $1.2 billion research computing facility. Ypsilanti Township, Michigan, 2026.

    Key Figure 1,200,000,000 USD
  262. Key Figure Ohio, statewide

    Stocktwits

    Amazon paid almost 11 million dollars in Ohio state property taxes and fees last year. Ohio, statewide, 2026.

    Key Figure 11,000,000 dollars
  263. Key Figure Ohio, statewide

    Stocktwits

    Meta paid over 40 million dollars in Ohio property taxes and fees during the 2018 to 2026 period. Ohio, statewide, 2026.

    Key Figure 40,000,000 dollars
  264. Key Figure Delta, Millard County, UT

    Deseret News

    Project Oasis at Delta Gigasite aims to generate approximately 4,000 acre feet of water per year. Delta, Millard County, UT, 2026.

    Key Figure 4,000 acre feet per year
  265. Key Figure Natrona County, WY

    Wyoming Public Media

    The project is expected to create approximately 150 jobs. Natrona County, WY, 2026.

    Key Figure 150 jobs
  266. Key Figure Nevada, statewide

    ktnv.com

    NV Energy proposes 1,223 megawatts of natural gas combustion turbines. Nevada, statewide, 2026.

    Key Figure 1,223 MW
  267. Key Figure SC

    capitalbnews.org

    In communities surrounding Meta's data center, median home and rental prices rose 80 percent in one year. SC, 2026.

    Key Figure 80 percent
  268. Key Figure Ohio, statewide

    Stocktwits

    Meta has invested more than 2.3 billion dollars in Ohio data centers since 2018. Ohio, statewide, 2026.

    Key Figure 2,300,000,000 dollars
  269. Key Figure Texas, statewide

    yahoo.com

    Texas has 99.4 gigawatts of gas power in development. Texas, statewide, 2026.

    Key Figure 99.4 GW
  270. Key Figure Cameron County, TX

    KRGV

    The project is expected to create more than 2,500 construction jobs. Cameron County, TX, 2026.

    Key Figure 2,500 jobs
  271. Key Figure Nevada, statewide

    ktnv.com

    NV Energy proposes 5,405 megawatts of battery energy storage systems. Nevada, statewide, 2026.

    Key Figure 5,405 MW
  272. Key Figure Spartanburg County, SC

    The Clinton Chronicle

    Valara facility permitted for 24 natural gas generators at 2000 kilowatts each. Spartanburg County, SC, 2026.

    Key Figure 2,000 kW
  273. Key Figure Rio Hondo, Cameron County, TX

    Texas Border Business

    First phase expected to create more than 2,500 construction jobs. Rio Hondo, Cameron County, TX, 2026.

    Key Figure 2,500 jobs
  274. Key Figure Ypsilanti Township, Washtenaw County, MI

    Planet Detroit

    Project will create 30 to 50 technical support jobs, 200 higher level research jobs, and 300 temporary construction jobs. Ypsilanti Township, Washtenaw County, MI, 2026.

    Key Figure 30 to 50 jobs
  275. Key Figure Quincy, WA

    linkedin.com

    Quincy Washington water system saving 138 million gallons a year through data center water reuse. Quincy, WA, 2026.

    Key Figure 138,000,000 gallons a year
  276. Key Figure Nevada, statewide

    ktnv.com

    Desert Research Institute estimates data center electricity consumption will grow to more than 35 percent by 2030 with estimated cost of more than 2.8 billion dollars each year. Nevada, statewide, 2026.

    Key Figure 2,800,000,000 dollars
  277. Key Figure Nevada, statewide

    Nevada Public Radio KNPR

    The tax abatement proposal could generate as much as 500 million dollars a year for schools statewide. Nevada, statewide, 2026.

    Key Figure 500,000,000 dollars a year
  278. Key Figure United States, statewide

    dailyreporter.com

    Nonresidential building lost 1,800 jobs in August. United States, statewide, 2026.

    Key Figure 1,800 jobs
  279. Key Figure Columbus, Ohio

    wowo.com

    Google, Meta and Amazon each have agreements valued at roughly 600 million dollars over 40 years. Columbus, Ohio, 2026.

    Key Figure 600,000,000 dollars
  280. Key Figure Clark County, Nevada, NV

    kolotv.com

    Over 16 years Nevada has given away over 350 million dollars in tax abatements to data centers. Clark County, Nevada, NV, 2026.

    Key Figure 350,000,000 dollars
  281. Key Figure Tioga County, PA

    Yahoo Finance

    Alpha Compute secured 47 million dollars in seller financing. Tioga County, PA, 2026.

    Key Figure 47,000,000 dollars
  282. Key Figure Morrow County, OR; Umatilla County, OR; Eastern Oregon, statewide

    OPB

    Data centers took up 15.7 million square feet in the region east of the Cascades, equivalent to 270 football fields. Morrow County, OR; Umatilla County, OR; Eastern Oregon, statewide, 2026.

    Key Figure 15,700,000 square feet
  283. Key Figure OH

    nbc4i.com

    Sales tax exemptions for data centers cost Ohio at least $1.5 billion in 2025. OH, 2026.

    Key Figure 1,500,000,000 USD
  284. Key Figure Tioga County, PA

    Yahoo Finance

    Marcellus resource could supply 200 MW of continuous generation for ten years at approximately 0.0585 dollars per kilowatt hour. Tioga County, PA, 2026.

    Key Figure 0.06 dollars per kilowatt hour
  285. Key Figure Columbus, Ohio

    wowo.com

    Ohio has committed at least 2.3 billion dollars in sales tax exemptions for data centers. Columbus, Ohio, 2026.

    Key Figure 2,300,000,000 dollars
  286. Key Figure Ypsilanti Township, Washtenaw County, MI

    Planet Detroit

    Computing center has capacity of 100 megawatts. Ypsilanti Township, Washtenaw County, MI, 2026.

    Key Figure 100 MW
  287. Key Figure Pennsylvania, PA

    PA Environment Digest Blog

    PJM Interconnection identified system wide reliability shortfall of 6,831 megawatts for 2028-29 delivery year in July 2026 capacity auction. Pennsylvania, PA, 2026.

    Key Figure 6,831 MW
  288. Key Figure Minnesota, statewide

    KDHL Radio

    Duluth has 6 data centers. Minnesota, statewide, 2026.

    Key Figure 6 count
  289. Key Figure Nevada, statewide

    ktnv.com

    Data centers projected to account for 64 percent of NV Energy power sales by 2046. Nevada, statewide, 2026.

    Key Figure 64 percent
  290. Key Figure Spartanburg County, SC

    The Clinton Chronicle

    Valara applied for additional 5 natural gas combustion turbines at 17 megawatts each and 6 turbines at 54 megawatts each. Spartanburg County, SC, 2026.

    Key Figure 17 MW
  291. Key Figure Northern Virginia, VA

    NBC4 Washington

    Up to 200 more data centers are planned for Northern Virginia in coming years. Northern Virginia, VA, 2026.

    Key Figure 200 data centers
  292. Key Figure United States, statewide

    dailyreporter.com

    Construction employment expanded by 120,000 jobs, or 1.5 percent year over year. United States, statewide, 2026.

    Key Figure 120,000 jobs
  293. Key Figure Ohio, statewide

    Morning Journal

    Data Center Tax Exemption cost the state 1.6 billion dollars as of 2025. Ohio, statewide, 2026.

    Key Figure 1,600,000,000 dollars
  294. Key Figure NY

    TradingView

    Microsoft aims to scale AI dedicated capacity to roughly one third of the total 38 gigawatt capacity by 2032, from about 2 gigawatts currently. NY, 2026.

    Key Figure 2 GW
  295. Key Figure Quincy, WA

    linkedin.com

    Quincy Washington achieved 72 percent lower property taxes through data center development. Quincy, WA, 2026.

    Key Figure 72 percent
  296. Key Figure Clark County, NV

    News From The States

    Nevada abated $240 million in sales tax for data centers in 2023 and 2024. Clark County, NV, 2026.

    Key Figure 240,000,000 USD
  297. Key Figure Cartersville, Bartow County, GA

    Bisnow

    Kingston Technology Hub expected to use 50,000 gallons of water daily. Cartersville, Bartow County, GA, 2026.

    Key Figure 50,000 gallons a day
  298. Key Figure Quincy, WA

    linkedin.com

    Quincy Washington data centers generated 6 billion plus in new tax base. Quincy, WA, 2026.

    Key Figure 6,000,000,000 dollars
  299. Key Figure Shippingport, Beaver County, PA

    Construction Review

    The project is expected to drive approximately $10 billion in regional investment. Shippingport, Beaver County, PA, 2026.

    Key Figure 10,000,000,000 USD
  300. Key Figure Oregon, statewide

    yahoo.com

    Oregon data center tax breaks total more than $450 million annually. Oregon, statewide, 2026.

    Key Figure 450,000,000 USD
  301. Key Figure Las Vegas, Clark County, NV

    Las Vegas Review-Journal

    Data centers would have generated an additional $357 million for schools since 2015 had they been required to pay Local School Support Tax. Las Vegas, Clark County, NV, 2026.

    Key Figure 357,000,000 USD
  302. Key Figure United States, statewide

    dailyreporter.com

    Construction industry added 22,000 jobs in August 2026. United States, statewide, 2026.

    Key Figure 22,000 jobs
  303. Key Figure United States, national

    Chicago Tribune

    Polls show 70% or more of Americans oppose datacenters in their communities. United States, national, 2026.

    Key Figure 70 percent
  304. Key Figure Shippingport, Beaver County, PA

    Construction Review

    The project is estimated to support about 3,000 construction jobs during development. Shippingport, Beaver County, PA, 2026.

    Key Figure 3,000 jobs
  305. Key Figure Texas, statewide

    yahoo.com

    The gas power tied to Nexus Data Center Hubbard is projected to emit 22 million tons annually. Texas, statewide, 2026.

    Key Figure 22,000,000 tons per year
  306. Key Figure Phoenix, Arizona

    Ahwatukee Foothills News

    Department of Interior cut Arizona's Colorado River water supplies by almost 30%. Phoenix, Arizona, 2026.

    Key Figure 30 percent
  307. Key Figure Ohio, statewide

    News-Herald

    State revenue loss from Ohio Data Center Tax Exemption was estimated at approximately 136 million dollars in 2013. Ohio, statewide, 2026.

    Key Figure 136,000,000 dollars
  308. Key Figure United States, statewide

    dailyreporter.com

    Heavy and civil engineering added 4,400 jobs in August. United States, statewide, 2026.

    Key Figure 4,400 jobs
  309. Key Figure Northern Virginia, VA

    NBC4 Washington

    Democratic U.S. Rep. Suhas Subramanyam represents 10th Congressional District with more than 300 data centers. Northern Virginia, VA, 2026.

    Key Figure 300 data centers
  310. Key Figure Clark County, Nevada, NV

    kolotv.com

    Nevada per pupil funding is about 4000 dollars below the national average. Clark County, Nevada, NV, 2026.

    Key Figure 4,000 dollars
  311. Key Figure Pulaski County, VA

    Patriot Publishing LLC

    Survey results: 90 percent of respondents said data centers would not benefit Pulaski County and the New River Valley. Pulaski County, VA, 2026.

    Key Figure 90 percent
  312. Key Figure Massachusetts, statewide

    Cryptopolitan

    Lowell residents saw electric bills climb more than 50 percent due to data center activity. Massachusetts, statewide, 2026.

    Key Figure 50 percent
  313. Key Figure LA

    Louisiana Illuminator

    Environmental Protection Network report estimated data center related air pollution could impose 11.7 billion to 20.9 billion dollars in annual public health costs by 2028. LA, 2026.

    Key Figure 11,700,000,000 to 20,900,000,000 dollars per year
  314. Key Figure Virginia, statewide

    Richmond Times-Dispatch

    Virginia is the largest data center market in the world with nearly 85 gigawatts of contracted electric power requests in the pipeline. Virginia, statewide, 2026.

    Key Figure 85 GW
  315. Key Figure Cartersville, Bartow County, GA

    Bisnow

    Kingston Technology Hub has $2 million annual impact on local tax revenues. Cartersville, Bartow County, GA, 2026.

    Key Figure 2,000,000 USD
  316. Key Figure United States, statewide

    dailyreporter.com

    Average monthly gain for specialty trade contractors over last 12 months was 6,000 employees. United States, statewide, 2026.

    Key Figure 6,000 employees
  317. Key Figure Phoenix, Arizona

    Ahwatukee Foothills News

    Arizona State University study found data centers can raise temperatures in surrounding neighborhoods by as much as 4 degrees Fahrenheit. Phoenix, Arizona, 2026.

    Key Figure 4 degrees Fahrenheit
  318. Key Figure Texas, statewide

    yahoo.com

    Fermi America's Project Matador in the Panhandle is projected at 24 million tons of emissions annually. Texas, statewide, 2026.

    Key Figure 24,000,000 tons per year
  319. Key Figure Nevada, statewide

    Nevada Current

    Nevada abated $240 million in sales tax for data centers in 2023 and 2024. Nevada, statewide, 2026.

    Key Figure 240,000,000 USD
  320. Key Figure Cameron County, TX

    KRGV

    The project is valued at 4 billion dollars. Cameron County, TX, 2026.

    Key Figure 4,000,000,000 dollars
  321. Key Figure Ypsilanti Township, Washtenaw County, MI

    Planet Detroit

    University of Michigan and Los Alamos computing center project costs 1.2 billion dollars. Ypsilanti Township, Washtenaw County, MI, 2026.

    Key Figure 1,200,000,000 dollars
  322. Key Figure Texas, statewide

    yahoo.com

    GW Ranch Energy Center near Fort Stockton is expected to emit 33 million tons of greenhouse gases a year. Texas, statewide, 2026.

    Key Figure 33,000,000 tons per year
  323. Key Figure Minnesota, statewide

    KDHL Radio

    Minnesota has 81 data centers operating, under construction, or in planning phase. Minnesota, statewide, 2026.

    Key Figure 81 count
  324. Key Figure Nevada, statewide

    ktnv.com

    NV Energy 2026 Integrated Resource Plan shows data centers accounted for 5 percent of total power sales in 2025. Nevada, statewide, 2026.

    Key Figure 5 percent
  325. Key Figure Shippingport, Beaver County, PA

    Construction Review

    The completed campus is expected to create about 640 full time positions for ongoing operations. Shippingport, Beaver County, PA, 2026.

    Key Figure 640 jobs
  326. Key Figure Texas, statewide

    yahoo.com

    Texas has 22.4 gigawatts of gas power announced. Texas, statewide, 2026.

    Key Figure 22.4 GW
  327. Key Figure NY

    Washington Examiner

    Quincy funded a $100 million high school complex without raising taxes on residents due to data center tax base expansion. NY, 2026.

    Key Figure 100,000,000 USD
  328. Key Figure Nevada, statewide

    ktnv.com

    NV Energy proposes 180 megawatts of geothermal generation. Nevada, statewide, 2026.

    Key Figure 180 MW
  329. Key Figure Bowling Green, Ohio

    sent-trib.com

    Bowling Green area resident utility bill increased from 29 dollars last July to 130 dollars this year. Bowling Green, Ohio, 2026.

    Key Figure 29 dollars
  330. Key Figure Eugene, OR

    KVAL

    Data centers expected to receive about $450 million in Oregon tax breaks this year. Eugene, OR, 2026.

    Key Figure 450,000,000 USD
  331. Key Figure United States, national

    Muscatine Journal

    A Gallup survey conducted in March 2026 found 60 percent of Americans opposed the construction of data centers in their communities, including 63 percent who said they were strongly opposed. United States, national, 2026.

    Key Figure 60 percent
  332. Key Figure Ohio, statewide

    News-Herald

    As of 2025, the Ohio Data Center Tax Exemption cost the state 1.6 billion dollars. Ohio, statewide, 2026.

    Key Figure 1,600,000,000 dollars
  333. Key Figure Cartersville, Bartow County, GA

    Bisnow

    Kingston Technology Hub requires 150 megawatts of power per day from the Municipal Electric Authority of Georgia. Cartersville, Bartow County, GA, 2026.

    Key Figure 150 MW
  334. Key Figure United States, statewide

    dailyreporter.com

    Unemployment for all industries remained at 4.1 percent in August. United States, statewide, 2026.

    Key Figure 4.1 percent
  335. Key Figure Tioga County, PA

    Yahoo Finance

    Property purchase price is 55 million dollars. Tioga County, PA, 2026.

    Key Figure 55,000,000 dollars
  336. Key Figure Ohio, statewide

    Morning Journal

    State revenue loss from Ohio Data Center Tax Exemption estimated at 136 million dollars in 2013. Ohio, statewide, 2026.

    Key Figure 136,000,000 dollars
  337. Key Figure Minnesota, statewide

    98.1 - Minnesota's New Country

    Minnesota has 81 data centers operating or in the planning phase across the state, according to Data Center Map. Minnesota, statewide, 2026.

    Key Figure 81 data centers
  338. Key Figure Laramie County, WY

    WyomingNews.com

    The facility will use between 20 and 30 million gallons of water annually for domestic and safety purposes. Laramie County, WY, 2026.

    Key Figure 20,000,000 to 30,000,000 gallons a year
  339. Key Figure NY

    TradingView

    Microsoft plans to expand total compute capacity from approximately 12 gigawatts to more than 38 gigawatts by 2032. NY, 2026.

    Key Figure 12 GW
  340. Key Figure Spartanburg County, SC

    The Clinton Chronicle

    Valara initially approved for 50 megawatts but amended application to 450 megawatts. Spartanburg County, SC, 2026.

    Key Figure 50 MW
  341. Key Figure Colorado Springs, El Paso County, CO

    Colorado Public Radio

    One megawatt can power about 1,000 homes. Colorado Springs, El Paso County, CO, 2026.

    Key Figure 1,000 homes
  342. Key Figure NY

    TradingView

    Microsoft spent 145 billion dollars in capital expenditures during its most recent fiscal year. NY, 2026.

    Key Figure 145,000,000,000 dollars
  343. Key Figure Quincy, Grant County, WA

    Washington Examiner

    Data centers in Quincy, Washington generate 55 to 60 percent of local property tax revenue. Quincy, Grant County, WA, 2026.

    Key Figure 55 to 60 percent of property tax revenue
  344. Key Figure Pulaski County, AR (near Wrightsville)

    The Arkansas Democrat-Gazette

    The transmission upgrades will cost about $19 million. Pulaski County, AR (near Wrightsville), 2026.

    Key Figure 19,000,000 USD
  345. Key Figure Hancock County, IA

    Radio Iowa

    National data centers use 18 billion gallons of water across 4,929 total centers. Hancock County, IA, 2026.

    Key Figure 18,000,000,000 gallons
  346. Key Figure Cameron County, TX

    KRGV

    The project sits on more than 1,100 acres. Cameron County, TX, 2026.

    Key Figure 1,100 acres
  347. Key Figure United States, statewide

    dailyreporter.com

    Nonresidential construction employment overall grew by 10,400 jobs in August. United States, statewide, 2026.

    Key Figure 10,400 jobs
  348. Key Figure Oregon, statewide

    yahoo.com

    Oregon currently occupies more than 2,100 acres with data centers and has 9,000 more acres planned. Oregon, statewide, 2026.

    Key Figure 2,100 acres
  349. Key Figure United States, statewide

    dailyreporter.com

    Nonresidential specialty trade contractors added 8,000 jobs since July 2026. United States, statewide, 2026.

    Key Figure 8,000 jobs
  350. Key Figure Kentucky, statewide

    mountain-topmedia.com

    American Edge Project estimated data centers will create nearly 5 million temporary construction jobs and nearly 700,000 permanent jobs. Kentucky, statewide, 2026.

    Key Figure 5,000,000 jobs
  351. Key Figure Pennsylvania, PA

    American Enterprise Institute - AEI

    58 percent of PA-7 residents call the 2021 tax exemption a bad deal. Pennsylvania, PA, 2026.

    Key Figure 58 percent
  352. Key Figure Pulaski County, AR (near Wrightsville)

    The Arkansas Democrat-Gazette

    The data center developer is working with Entergy to supply an initial 150 megawatts of power. Pulaski County, AR (near Wrightsville), 2026.

    Key Figure 150 MW
  353. Key Figure Salix, Woodbury County, IA

    Muscatine Journal

    In Dallas and Polk counties, 5,363 construction workers were added between 2014 and 2022. Salix, Woodbury County, IA, 2026.

    Key Figure 5,363 jobs
  354. Key Figure Minnesota, statewide

    98.1 - Minnesota's New Country

    Duluth is the next biggest market for data centers in Minnesota with 6 data centers. Minnesota, statewide, 2026.

    Key Figure 6 data centers
  355. Key Figure Nevada, statewide

    ktnv.com

    NV Energy proposes 4,370 megawatts of solar photovoltaic generation. Nevada, statewide, 2026.

    Key Figure 4,370 MW
  356. Key Figure Shippingport, Beaver County, PA

    Construction Review

    The campus is designed for 2 gigawatt capacity. Shippingport, Beaver County, PA, 2026.

    Key Figure 2 GW
  357. Key Figure Pulaski County, VA

    Patriot Publishing LLC

    Performance agreement includes 50 million dollar data center investment requirement at the end of the fourth year of operation. Pulaski County, VA, 2026.

    Key Figure 50,000,000 dollars
  358. Key Figure Cartersville, Bartow County, GA

    Bisnow

    Kingston Technology Hub expected to employ 50 people full time. Cartersville, Bartow County, GA, 2026.

    Key Figure 50 jobs
  359. Key Figure Moss Bluff, Calcasieu Parish, LA

    The Advocate

    To qualify for state tax incentives project must commit to minimum $200 million capital investment. Moss Bluff, Calcasieu Parish, LA, 2026.

    Key Figure 200,000,000 USD
  360. Key Figure CT

    today.uconn.edu

    Cornell University study projects data centers will put an additional 24 to 44 million metric tons of carbon dioxide into the atmosphere by 2030. CT, 2026.

    Key Figure 24,000,000 to 44,000,000 metric tons of CO2
  361. Key Figure Morrow County, OR; Umatilla County, OR; Eastern Oregon, statewide

    OPB

    Amazon Web Services has more than 50 data centers in Morrow County and Umatilla County, with growth largely fueled by Amazon. Morrow County, OR; Umatilla County, OR; Eastern Oregon, statewide, 2026.

    Key Figure 50 facilities
  362. Key Figure Pennsylvania, PA

    American Enterprise Institute - AEI

    49 percent of Pennsylvanians call the 2021 tax exemption for data center equipment a bad thing for the state, versus 17 percent who call it good. Pennsylvania, PA, 2026.

    Key Figure 49 percent
  363. Key Figure Ohio, statewide

    Stocktwits

    Ohio data center sales tax exemption topped 1.5 billion dollars in 2025, more than 10 times the state's original estimate. Ohio, statewide, 2026.

    Key Figure 1,500,000,000 dollars
  364. Key Figure Laramie County, WY

    WyomingNews.com

    Peak construction workforce is estimated at around 2,500 workers. Laramie County, WY, 2026.

    Key Figure 2,500 workers
  365. Key Figure Laramie County, WY

    WyomingNews.com

    The project will have initially 250 operational jobs. Laramie County, WY, 2026.

    Key Figure 250 jobs
  366. Key Figure Nevada, statewide

    malaysia.news.yahoo.com

    Data centers in Southern Nevada accounted for about 773 million gallons of water in 2025, which is 0.52 percent of Southern Nevada's total water use. Nevada, statewide, 2026.

    Key Figure 773,000,000 gallons
  367. Key Figure Bow, Merrimack, NH

    Concord Monitor

    Potential data center in Bow could draw up to 200 megawatts of power. Bow, Merrimack, NH, 2026.

    Key Figure 200 MW
  368. Key Figure Ohio, statewide

    Stocktwits

    Amazon has invested nearly 40 billion dollars in Ohio data centers since 2015. Ohio, statewide, 2026.

    Key Figure 40,000,000,000 dollars
  369. Key Figure Moss Bluff, Calcasieu Parish, LA

    The Advocate

    To qualify for state tax incentives project must create at least 50 new permanent jobs. Moss Bluff, Calcasieu Parish, LA, 2026.

    Key Figure 50 jobs
  370. Key Figure Ohio, OH

    Newser

    Ohio's data center equipment sales tax exemption costs more than 1.5 billion dollars annually. Ohio, OH, 2026.

    Key Figure 1,500,000,000 dollars a year
  371. Key Figure Clark County, NV

    News From The States

    Nevada abated $90 million in sales tax for data centers in 2021 and 2022. Clark County, NV, 2026.

    Key Figure 90,000,000 USD
  372. Key Figure Illinois, statewide

    Chicago Tribune

    27 datacenters built in Illinois since 2020 collectively saved nearly $1 billion in taxes via incentives. Illinois, statewide, 2026.

    Key Figure 1,000,000,000 USD
  373. Key Figure Bucks County, PA

    Bucks County Beacon

    Brian Fitzpatrick voted for $20 billion in data center subsidies. Bucks County, PA, 2026.

    Key Figure 20,000,000,000 USD
  374. Key Figure United States, statewide

    dailyreporter.com

    Construction unemployment rate fell to 3.1 percent in August 2026. United States, statewide, 2026.

    Key Figure 3.1 percent
  375. Key Figure Salix, O'Brien County, IA

    Muscatine Journal

    Google's Council Bluffs data center has reportedly invested more than $5 billion since 2007. Salix, O'Brien County, IA, 2026.

    Key Figure 5,000,000,000 USD
  376. Key Figure Pulaski County, VA

    Patriot Publishing LLC

    Virginia's First would pay 150,000 dollars in project development fees to the company within 30 days of Phase I completion. Pulaski County, VA, 2026.

    Key Figure 150,000 dollars
  377. Key Figure Pulaski County, VA

    Patriot Publishing LLC

    Proposed data center property purchase price was 1.6 million dollars or roughly 3,370 dollars per acre. Pulaski County, VA, 2026.

    Key Figure 1,600,000 dollars per acre
  378. Key Figure Indiana County, PA

    WCCS AM1160 & 101.1FM

    AWS stated proposed data centers would generate between 1500 and 2000 jobs. Indiana County, PA, 2026.

    Key Figure 1,500 to 2,000 jobs
  379. News Wire Federal

    Google Blackstone's TPU neocloud named Crux AI, hires Meta's data center engineering head Alan Duong

    Alan Duong, formerly Meta's VP of data center engineering, joined Crux AI as chief development officer with plans to deliver multiple gigawatts of capacity.

  380. News Wire Alaska

    Kreiss-Tomkins unveils platform to institute moratorium on data centers and regulate AI - Delta Discovery

    Democratic candidate for Alaska governor Jonathan Kreiss Tomkins proposes moratorium on new data centers pending regulation and local approval requirements.

  381. News Wire Alabama Brookwood Proposed Data Center →

    Brookwood data center developer donates $25k to Tuberville campaign - WVUA 23

    Applied Digital Corporation donated $25,000 to Alabama gubernatorial candidate Tommy Tuberville; Democratic rival Doug Jones criticized Tuberville's financial ties to AI and data center companies.

  382. News Wire Arkansas

    Arkansas lawmaker forms trade association focused on AI, data center policy - KATV

    Arkansas lawmaker forms trade association to shape AI and data center policy amid debate over economic benefits versus ratepayer and environmental costs.

  383. News Wire Arkansas AVAIO Pulaski County Data Center →

    Entergy re-submits AVAIO power agreement to Arkansas Public Service Commission - arkansasonline.com

    Entergy re submitted power agreement to Arkansas PSC for AVAIO's 150 megawatt data center in Pulaski County with service to begin June 2027.

  384. News Wire Arizona

    A Guide to Better Data Center Policy for Local Governments - Federation of American Scientists

    Federation of American Scientists releases guide on data center policy for local governments, analyzing ordinances, property values, and community benefits agreements.

  385. News Wire Arizona

    Corporation Commission debate came with intense sparring over data centers

    Arizona Corporation Commission candidates debate data center impacts, with Democrats proposing a moratorium and Republicans defending current regulation.

  386. News Wire California

    California's Data Center Challenge: Rebuilding Community Trust - smdp.com

    Opinion piece argues California tech industry must rebuild community trust in data centers through transparency, equitable economic benefits and clean energy deployment.

  387. News Wire California Imperial Valley AI Data Center →

    California judge halts state's largest data center - Courthouse News

    California judge halts Imperial Valley Data Center, California's largest, requiring full environmental review under CEQA before project can proceed.

  388. News Wire California

    San Francisco, heartland of AI, to weigh moratorium on new data centers - San Francisco Chronicle

    San Francisco considers a moratorium on new data center construction.

  389. News Wire California Imperial Valley AI Data Center →

    Court overturns approval of Imperial County data center, orders environmental review - KPBS

    Imperial County Superior Court judge overturns county approval of data center complex, orders environmental review under California Environmental Quality Act.

  390. News Wire Colorado Global AI data center (Weld County) →

    Weld County commissioners approve permit for Global AI data center - Colorado Newsline

    Weld County commissioners voted unanimously to approve a zoning permit for Global AI's 41 acre data center near Windsor, expected to reach 1 gigawatt by 2029.

  391. News Wire Colorado

    Climate change, not data centers, behind Colorado River drought - malaysia.news.yahoo.com

    Water experts debunk social media claims that data centers caused 2026 Colorado River drought, attributing crisis to climate change, low snowpack, and high evaporation.

  392. News Wire Colorado Global AI data center (Weld County) →

    Global AI Wins Colorado Data Center Permit Amid Power, Water Disputes - TheEnergyMag

    Weld County commissioners unanimously approved Global AI's 41 acre data center project despite concerns over power, water and noise.

  393. News Wire Colorado Project Taurus →

    If approved, Project Taurus will use substantially more electricity than Colorado Springs' current top power customer - Colorado Public Radio

    Colorado Springs Utilities confirms Project Taurus data center would consume 50 MW continuously, making it the city's largest customer by substantial margin.

  394. News Wire Colorado Global AI data center (Weld County) →

    Weld County commissioners approve proposed 41-acre data center - denver7.com

    Weld County commissioners voted 5-0 to approve a 41 acre data center project that could become Colorado's largest, despite community concerns about water, noise, and grid strain.

  395. News Wire Connecticut

    How Are Data Centers Impacting Health? - today.uconn.edu

    University of Connecticut researcher discusses environmental and health impacts of data center construction including air pollution, water use and noise pollution.

  396. News Wire Florida

    U.S. Rep. Kathy Castor Opposes Data Centers in Hillsborough County - U.S. Representative Kathy Castor (.gov)

    U.S. Representative Kathy Castor expressed strong opposition to data centers in Hillsborough County, citing impacts on utility bills, water supplies, and costs to residents.

  397. News Wire Florida Indiantown Data Center →

    Indiantown attorney drafting data center moratorium

    Indiantown Village Council voted unanimously to direct legal counsel to draft a data center moratorium and transparency ordinance following a recent leadership change aimed at pausing data center applications.

    moratorium legislation zoning
  398. News Wire Florida

    Byron Donalds says data center dollars don’t influence his policy positions - Florida Politics

    Byron Donalds, Republican gubernatorial candidate, says data center industry donations do not influence his policy positions on the facilities.

  399. News Wire Florida

    Miami Lakes to consider data center ban - floridapolitics.com

    Miami Lakes Town Council considers ordinance to prohibit dedicated AI data centers as principal use within municipality.

  400. News Wire Georgia Google Columbia County data center →

    Google representative speaks at Columbia County Chamber event - AOL.com

    Google representative Jen Ryan spoke at Columbia County Chamber event about the coming Google data center, discussing standards for noise, lighting, and water usage.

  401. News Wire Georgia

    Another large data center proposed in Georgia - The Augusta Press

    A large data center is proposed for a small community in northwest Georgia, state under consideration for next major project.

  402. News Wire Georgia

    Thor Equities Plans $1B Data Center In North Georgia: The Atlanta Deal Sheet - Bisnow

    Thor Equities proposes Kingston Technology Hub, a 350,000 square foot data center on 560 acres north of Cartersville, Georgia, estimated to cost $1 billion and open in 2030.

  403. News Wire Iowa QTS Clinton Data Center →

    No Data Center Concert Rocking Clinton, Iowa This Weekend - quadcities.com

    Clinton, Iowa residents organized protest concert against a proposed data center.

  404. News Wire Iowa Google Salix Data Center →

    Salix, IA city leaders discuss data center ordinance, future conversations with Google - Hawaii News Now

    Salix, Iowa city council discusses data center ordinance and Google project; votes against moratorium three weeks prior.

  405. News Wire Iowa

    Iowa data center debate looms in governor race. Where Sand, Lahn stand - The Quad-City Times

    Iowa gubernatorial candidates Zach Lahn and Rob Sand take opposing stances on data centers, with Lahn calling for a statewide pause and Sand proposing transparency and union requirements.

  406. News Wire Iowa Google Salix Data Center →

    Iowa data center debate looms in governor race. Where Sand, Lahn stand - Muscatine Journal

    Iowa gubernatorial candidates Rob Sand and Zach Lahn outline different approaches to data center regulation, with Sand favoring transparency and job protections while Lahn calls for a statewide construction pause.

  407. News Wire Iowa Google Salix Data Center →
  408. News Wire Iowa

    Northern Iowa county panel becomes latest to reject call for data center - Radio Iowa

    Hancock County Planning and Zoning Commission unanimously denies zoning change for potential data center development near Garner, Iowa, after three hour hearing with three dozen speakers, majority opposed.

  409. News Wire Iowa

    Iowa county enacts moratorium on new data center projects - KCCI

    Boone County, Iowa adopted a one year moratorium on new data center projects while the board studies and creates a new zoning ordinance.

  410. News Wire Idaho

    AI Infrastructure on DOE Lands Request for Information - Department of Energy (.gov)

    Department of Energy released a Request for Information for AI infrastructure on DOE lands, identifying 16 sites for data center development with target operation by end of 2027.

  411. News Wire Illinois

    Tell your governor: Data center moratorium now - PIRG

    Illinois PIRG advocates for two year moratorium on large data centers, citing concerns about energy demand and water use.

  412. News Wire Illinois T5 Grayslake data center →

    Lake County Approves 8-Month Data Center Moratorium - Patch

    Lake County, Illinois approves eight month moratorium on data center development in unincorporated areas while studying potential regulations.

  413. News Wire Illinois Chicago Quantum Park →

    Editorial: R-E-S-P-E-C-T is the only way for AI advocates to deal with data center haters - Chicago Tribune

    Chicago Tribune editorial criticizes tech industry executives for dismissing datacenter opposition as ignorance, noting legitimate concerns about electricity costs, employment, and AI risks.

  414. News Wire Indiana

    Columbus adds oversight to data center proposals - ipm.org

    Columbus, Indiana adds oversight ordinance requiring data center proposals to obtain board of zoning appeals approval.

  415. News Wire Indiana

    Ford challenges Spartz on data centers after her call for federal review - LarryInFishers

    Representative Victoria Spartz requested federal review of Indiana data center projects including LEAP and others for energy and water impacts; rival congressional candidate J.D. Ford called for federal legislation requiring local control and disclosure.

  416. News Wire Indiana

    Rep. Spartz seeks independent federal review of Indiana data centers & LEAP - The Hamilton County Reporter

    Rep. Victoria Spartz requested federal review of LEAP and other Indiana datacenters, raising concerns about energy, grid reliability, transmission costs, water resources and cost allocation.

  417. News Wire Indiana

    ARNOLT CENTER: Companies Seek to Hide Indiana Data Center Details with NDAs - the indiana citizen

    Investigation: companies seek to hide Indiana data center project details using non disclosure agreements; residents express concerns about transparency.

  418. News Wire Kansas

    Shawnee Co. Commissioner updates budget talks, data center debate - WIBW

    Shawnee County, Kansas Commissioner Kevin Cook discussed data center debate and county budget during media appearance; specific actions not detailed in excerpt provided.

  419. News Wire Kansas Data Center Edgerton →

    Judge dismisses City of Edgerton's lawsuit against two residents over data center petition - Johnson County Post

    Kansas judge dismisses Edgerton's lawsuit against residents and rules citizen petition seeking ballot vote on data center is protected speech.

  420. News Wire Kansas

    The Kansas WEALTH Coalition Calls for a Data Center Moratorium Until Significant Guardrails Are Put in Place - sentineltimes.com

    Kansas WEALTH Coalition calls for statewide data center moratorium with guardrails protecting water, energy, and labor standards.

  421. News Wire Kentucky

    Energy Secretary Announces New American Energy Hub at Paducah Site - Department of Energy (.gov)

    Energy Secretary announces $100 billion Paducah, Kentucky AI data center campus with 1.8 GW capacity, 2 GW natural gas generation, 2.6 GW battery storage, completion by 2031.

  422. News Wire Kentucky Sphere 3D Hopkinsville Data Center →

    Sphere 3D (NASDAQ: ANY) Soars as AI Data Center Expansion Accelerates

    Sphere 3D advances a proposed 50 MW AI and HPC data center in Hopkinsville, Kentucky with a 65 MW substation as part of a strategic pivot to the TVA region.

  423. News Wire Kentucky

    A Kentucky county becomes first in state to permanently ban data center construction - kentuckylantern.com

    Woodford County, Kentucky passed a permanent ban on data center construction, the first county in the state to take such a strict stance.

  424. News Wire Kentucky

    Some Ky Schools and Local Governments Eye a Data Center Tax Windfall. A Think Tank Sees Loopholes. - The Lexington Times

    Kentucky think tank raised concerns about loopholes in data center tax incentives available to schools and local governments.

  425. News Wire Louisiana Meta plus Moss Bluff →

    Data center planned for north of Lake Charles, developer confirms. Here’s what we know. - The Advocate

    Azimuth Renewables president confirms plans for data center at Moss Bluff Louisiana on 1,200 acres, early evaluation stage, details pending.

  426. News Wire Louisiana Meta plus Moss Bluff →

    Proposed data center north of Moss Bluff still in exploration stage, company says - KPLC 7 News

    Azimuth Renewables is exploring a data center north of Moss Bluff in Calcasieu Parish, but faces zoning barriers and community opposition.

  427. News Wire Louisiana

    Ascension Zoning Commission recommends first data center regulations. See what they are.

    Ascension Parish Zoning Commission recommends first data center ordinance; parishes council will vote on adoption.

  428. News Wire Louisiana

    Former EPA officials warn of health risks from data center pollution - Louisiana Illuminator

    Former EPA officials warn that data center pollution could cause 600,000 asthma cases and 1,300 premature deaths by 2028.

  429. News Wire Louisiana Meta Louisiana data center →

    Letters: As data center discussed for Livingston Parish, questions remain - NOLA.com

    A Louisiana resident warns that data center power contracts may burden ratepayers if technology becomes obsolete or power costs decline during 15 year utility terms.

  430. News Wire Massachusetts

    Massachusetts lets towns veto data centers before the state weighs in - Cryptopolitan

    Massachusetts Governor Maura Healey signed an executive order requiring data centers over 25 megawatts to win local approval and meet 100 percent clean energy demands.

  431. News Wire Massachusetts

    Massachusetts Mandates Clean Energy for Large Data Centers as Backlash Grows - AI Insider

    Massachusetts Governor Maura Healey issued Executive Order 658 requiring large data centers over 25 megawatts to procure clean power or contribute to ratepayer protection fund.

  432. News Wire Massachusetts

    Massachusetts Establishes New Framework for Data Center Development | Mintz - ML Strategies - JD Supra

    Massachusetts Governor Maura Healey's Executive Order 658 establishes framework for data center development requiring clean energy and community benefits agreements.

  433. News Wire Massachusetts

    Massachusetts Tightens Data Center Environmental Permitting - Environment+Energy Leader

    Massachusetts Governor signed Executive Order 658 requiring data centers over 25 MW to meet clean energy, water, environmental and community benefit requirements before permitting.

  434. News Wire Massachusetts Boston Neighborhood Data Center →

    Massachusetts Requires Local Approval for Data Centers Under New Executive Order - Boston's ROCK 92.9

    Massachusetts Governor Healey signs executive order requiring data centers to secure local approval, fund clean energy, meet environmental standards, and pay ratepayer protection fee.

  435. News Wire Massachusetts

    Massachusetts Sets Clean Energy Rules For Data Centers - taiyangnews.info

    Massachusetts issues clean energy mandate: data centers above 25 MW must procure new clean power or pay into ratepayer fund; local approval required.

  436. News Wire Massachusetts

    Massachusetts tightens the rules on data centers as energy angst grows - Briefs Finance

    Massachusetts Governor Healey ordered community benefits agreements for data centers, banned NDAs, and forced developers to fund clean power or contribute to ratepayer protection fund.

  437. News Wire Maryland Frederick County Data Center Expansion →

    Data center developers have one more avenue to protect themselves from a Council that wants to protect you- but it's not over yet. #frederickcountymd #frederick #peopleoverprofit #waterislife

    Frederick County Council member advocates for protections against data center development, citing water concerns and community interests.

  438. UM town hall panel faces angry, jeering crowd over plan for joint computing center with Los Alamos - Michigan Public

    University of Michigan held hostile town hall in Ypsilanti Township on proposed advanced research computing center with Los Alamos National Laboratory; residents oppose project.

    national
  439. News Wire Michigan

    As voters sour on data centers, governor candidates embrace moratorium - Detroit Free Press

    Michigan governor candidates embrace data center moratorium as voters sour on facilities; both major party nominees call for halting new construction pending regulatory protections.

  440. News Wire Michigan

    Nearly two thirds of Michigan voters are against construction of data centers, poll finds - ClickOnDetroit | WDIV Local 4

    Poll shows nearly two thirds of Michigan voters oppose data center construction in the state.

  441. News Wire Michigan

    Trump EPA Accused of Endangering Public as Study Highlights 'Hidden Health Costs' of Data Centers - commondreams.org

    Environmental Protection Network report accuses Trump EPA of actions that could increase pollution and health risks from data centers.

  442. University of Michigan's Ypsilanti Township computing center plans meet with anger at town hall: 'Enormous distrust' - Planet Detroit

    University of Michigan and Los Alamos $1.2 billion 100 megawatt computing center faces community backlash; township board and utility enact opposition resolutions and moratorium.

  443. News Wire Michigan Rural Michigan Farm Data Center →

    Ionia has no data center proposal, but leaders are starting the conversation - fox17online.com

    Ionia Michigan city leaders and residents discuss data center possibility with MSU professor and utility; no current proposal exists.

  444. El-Sayed on U-M data center, university enrollment and affordability - The Eastern Echo

    Democratic U.S. Senate candidate Abdul El Sayed outlines five conditions for University of Michigan data center in Ypsilanti: union labor, no rate increases, water protection, revenue investment, and community benefits agreement.

  445. University of Michigan holds town hall over proposed data center - cbsnews.com

    University of Michigan held town hall on proposed high performance research computing center in Ypsilanti Township.

  446. News Wire Minnesota

    Minnesota Already Has Over 80 Data Centers In These Cities - 98.1 - Minnesota's New Country

    Data Center Map reports Minnesota has 81 data centers operating or in planning phase, with majority in Minneapolis market and six in Duluth.

  447. News Wire Minnesota

    Where do Minnesota statewide office candidates stand on data centers? - Alexandria Echo Press

    Minnesota statewide office candidates Demuth, Klobuchar, Tafoya, and Flanagan state positions on data center transparency, local authority, environmental regulation, and cost allocation.

  448. News Wire Minnesota

    Minnesota Already Has Over 80 Data Centers In These Cities - KDHL Radio

    Minnesota has 81 operating, under construction, or planned data centers with majority in Minneapolis market and six in Duluth.

  449. News Wire Minnesota

    Data center moratoriums create developer, landowner risks - Minnesota Lawyer

    Data center moratoriums in Minnesota municipalities create delays and costs for developers and landowners; municipalities generally imposing up to one year initial moratoriums.

  450. News Wire Minnesota Google Hermantown Data Center →

    Inside the state’s miserable task of re-vetting Medicaid providers. Plus: meet the pro-data center group Iron Range DFLers and Republicans support. - MinnPost

    Minnesota Iron Range political figures diverge on data center support; Jobs for Minnesotans nonprofit advocates for local data center development.

  451. News Wire Missouri

    Desloge town hall draws regional opposition to potential data center - Park Hills Daily Journal

    Desloge, Missouri held a town hall where several hundred regional residents largely opposed a potential data center and called for a planning moratorium.

  452. News Wire Missouri

    Property marketed in Oregon County for Data Center - E Communications

    Nations Media Partners markets 226 acre property in Oregon County, Missouri for mid scale data center development.

  453. News Wire Missouri St. Louis Midtown Data Center →

    Opinion: Data-center rules will test our community health decisions

    St. Louis author Angela Mott outlines framework for regulating data centers, emphasizing community health assessment and evidence based governance.

  454. News Wire Missouri

    Rejected once, tax break plan returns for Ferguson data center and Emerson redevelopment

    Ferguson reintroduces legislation for $1.5 billion tax incentives for a data center and Emerson campus redevelopment after a 3-3 council vote rejected it in May.

  455. News Wire Montana

    Lawmakers don’t want ratepayers saddled with data center costs - Missoula Current

    Montana legislature's Energy and Technology Committee advanced a draft bill to prevent utility ratepayers from funding data center infrastructure costs.

  456. News Wire Montana

    Missoula County to prepare data center study after passing one-year moratorium - Nonstop Local News Montana

    Missoula County passed one year moratorium on new or expanded data centers and is preparing study on their impacts.

  457. Butte commissioners discuss possibility of data center moratorium - montanarightnow.com

    Butte Silver Bow commissioners consider six month moratorium on new data center construction, citing need for community input and regulatory clarity.

  458. News Wire North Carolina

    McDowell joins NC data center pause - Carolina Journal

    McDowell County, North Carolina approved six month moratorium on data center development, joining at least 30 other NC counties and towns amid concerns over energy, water, and infrastructure costs.

  459. News Wire North Carolina

    North Carolina governments hit pause on data centers as AI backlash grows - Substack

    North Carolina local governments are imposing moratoriums or temporary restrictions on data centers amid public concerns about electricity, water, property rights, and tax revenue.

  460. Proposed Harwood charter amendment looking to make industrial negotiations more transparent - The Mighty 790 KFGO

    Harwood, North Dakota voters will decide in November on a charter amendment to require more transparency in negotiations for large industrial projects, following criticism of the Applied Digital data center approval process.

  461. News Wire Nebraska Winnebago Tribe AI Data Center →

    Winnebago Tribe of Nebraska offers information on proposed data center project - AZ Family

    The Winnebago Tribe of Nebraska is offering information on a proposed data center project.

  462. News Wire New Hampshire

    Keene Committee Advances Data Center Moratorium, Dog Restrictions; Delays Kratom Action - My Keene Now

    Keene, New Hampshire planning committee voted to refer data center moratorium proposal to planning board; moratorium would last no more than one year.

  463. News Wire New Hampshire Bow Data Center →

    Rates and Rights: Don’t panic about that data center in Bow

    Eversource officials reveal plans for potential 200 megawatt data center in Bow, NH, next to Merrimack Station power plant.

  464. News Wire New Jersey

    States Are Opening the Door to Data Center Investment in Virtual Power Plants - RMI

    RMI reports states are opening pathways for data centers to fund distributed capacity through virtual power plants and new compensation mechanisms.

  465. News Wire New Jersey

    Spotswood Sends Data Center Zoning Proposal to Planning Board Amid Council Debate - TAPinto

    Spotswood, New Jersey sent data center zoning proposal to planning board after council debate on economic benefits and environmental concerns.

  466. News Wire New Mexico Project Jupiter →

    Oracle Plans Public Environmental Dashboard for Project Jupiter - eponline.com

    Oracle plans a public dashboard on air, noise, heat, light and water use at Project Jupiter in Doña Ana County, New Mexico, with an independent expert assessing that information twice a year.

  467. News Wire New Mexico Project Jupiter →

    Oracle’s 2-GW Renewable RFP Aims to Offset AI Data Center Emissions in New Mexico - energytech.com

    Oracle issues 2 GW renewable energy RFP to support Project Jupiter's 100% carbon free energy goal by 2031 in New Mexico.

  468. News Wire Nevada

    ‘This industry is the future:’ Clark County teachers union wants state to bargain with data centers - News From The States

    Clark County teachers union calls for data center tax abatement reforms to fund education.

  469. News Wire Nevada

    Nevada is reviewing its data center tax breaks , but counties are out of the loop - Northern Nevada Business Weekly

    Nevada state government is reviewing its data center tax break program, but counties are not being consulted despite bearing fiscal costs.

  470. News Wire Nevada Boulder City BLM Land Data Center →

    First of its kind public Nevada data center halted over review concerns - Trending Now Infrastructure

    Federal appeals board halted approval of 167 MW data center near Boulder City, Nevada, citing environmental review concerns.

  471. News Wire Nevada

    Teachers’ union proposes plan to make Nevada data centers pay more for public education - kolotv.com

    Clark County Education Association proposes eight point plan to eliminate data center tax breaks and redirect revenues to education, water, power, and environmental controls.

  472. News Wire Nevada

    Nevada data center debate reaches classroom as teachers union pushes against moratorium - news3lv.com

    Nevada lawmakers draft legislation for a potential data center moratorium as teachers union opposes and Senator Neal defends the industry amid AI expansion concerns.

  473. News Wire Nevada Las Vegas Data Center Expansion →

    TPS concerns, Las Vegas airfare costs and data center tax incentives

    Nevada teachers union proposes ending data center tax abatements to fund schools, potentially raising $500 million annually for K-12 education.

  474. News Wire Nevada

    ‘This industry is the future:’ Clark County teachers union wants state to deal with data centers - Nevada Current

    Clark County Education Association calls for ending data center tax abatements to fund schools, citing $240 million in abated sales tax in 2023-2024.

  475. News Wire Nevada

    DATA VS. DESERT PART 4: The massive power demand of Nevada's data center boom - ktnv.com

    Data center growth in Nevada comes with large power demand, and critics say the risk to local power bills is not worth it.

  476. News Wire Nevada

    Nevada’s 'unprecedented' data center boom comes with a massive power bill - ktnv.com

    NV Energy 2026 Integrated Resource Plan shows data centers driving unprecedented electricity demand, projected to grow from 5 percent to 64 percent of sales by 2046.

  477. News Wire Nevada Las Vegas Data Center Expansion →

    Teachers union says Nevada wants data centers to help fund schools - Las Vegas Review-Journal

    Nevada teachers union proposes eight point plan requiring data centers to pay Local School Support Tax and address environmental concerns.

  478. News Wire New York

    Microsoft Eyes Massive Data Center Push To Triple Computing Power And Solve Capacity Bottlenecks, Says Report - TradingView

    Microsoft plans to expand global data center capacity to 38 gigawatts by 2032, tripling from 12 gigawatts now, with one third AI dedicated.

  479. News Wire New York

    Why the AI hyperscalers are winning the data center debate - Washington Examiner

    Analyst argues AI hyperscaler companies are winning the data center debate by emphasizing economic and tax benefits, citing Quincy, Washington as a success case and community benefit agreements as commitments.

  480. News Wire Ohio

    BG rallies against Husted and his role in bringing data centers to Ohio - sent-trib.com

    Ohio Democratic Party rally denounces Lieutenant Governor Jon Husted for promoting data centers; speakers cite environmental and tax concerns.

  481. News Wire Ohio

    Vivek Ramaswamy could turn Ohio into America’s data center capital, all while holding investments across the industry - TiffinOhio.net

    Ohio gubernatorial candidate Vivek Ramaswamy, who holds data center industry investments, previously praised Ohio's data center boom but now proposes conditional approval framework requiring community benefits.

  482. News Wire Ohio

    Rep. Tristan Rader, Councilman Charles Slife Warn Ohioans of Unrestricted Data Center Growth - Cleveland Scene

    Ohio State Rep. Tristan Rader and Cleveland Councilman Charles Slife warn voters about unrestricted data center growth and potential conflicts of interest by gubernatorial candidates.

  483. News Wire Ohio

    Amazon, Meta and Google Confront Data Center Backlash - TradingView

    More than a dozen states are reducing data center tax subsidies as lawmakers question whether job creation and investment justify lost revenue and grid costs.

  484. News Wire Ohio

    Legislation to ban tax abatements for data centers introduced in Ohio - News-Herald

    Ohio state representative introduces bill to ban property tax abatements for data centers and examine termination of existing exemptions.

  485. News Wire Ohio

    Ohio lawmakers mull pulling data center tax break - nbc4i.com

    Ohio lawmakers propose eliminating or limiting data center tax breaks including sales and property tax exemptions in response to public backlash.

  486. News Wire Ohio

    Legislation to ban tax abatements for data centers introduced in Ohio - Morning Journal

    Ohio state rep introduces House Bill 999 to ban property tax exemptions for data centers and examine terminating existing abatements.

  487. News Wire Ohio

    States Want to Pull Back Data Center Tax Breaks - Newser

    Ohio Governor Mike DeWine froze new data center tax exemption applications after costs ballooned to 1.5 billion dollars annually, prompting lawmakers to consider repealing the break.

  488. News Wire Ohio

    AMZN, META, GOOGL Might Lose Billions As Ohio State Reconsiders Data Center Tax Breaks, Says Report - Stocktwits

    Ohio is reconsidering data center tax incentives worth billions as states weigh costs of data center growth and rising power and water demand.

  489. News Wire Ohio

    Ohio Sen. Bernie Moreno Calls for End to Data Center Tax Subsidies - wowo.com

    Ohio Sen. Bernie Moreno proposes federal legislation to eliminate financial benefit of state and local data center tax incentives through a 100% federal tax offset.

  490. News Wire Oklahoma Grady County Data Center →
  491. News Wire Oklahoma Project Clydesdale (Google Tulsa County) →

    Representing sovereignty, traditions - ocolly.com

    Oklahoma State University students protested Google data center project, citing threats to Indigenous sovereignty and communities.

  492. News Wire Oregon

    Eugene rejects data center at former Hynix site - KVAL

    Eugene rejected a data center proposal at the former Hynix site under employment zoning rules; the decision may be appealed to state board.

  493. News Wire Oregon

    Kotek, Drazan Each Call for Oregon Data Center Moratorium - yahoo.com

    Oregon Governor Tina Kotek and Republican challenger Christine Drazan both called for a statewide moratorium on new data center construction, citing impacts on water, energy, and farmland.

  494. News Wire Oregon

    Oregon Governor Tina Kotek orders statewide pause on new data center construction - AppleValleyNewsNow.com

    Oregon Governor Tina Kotek ordered a statewide pause on state agency approvals for new data center projects through July 1, 2027, citing concerns about water, energy, and environmental impacts.

  495. News Wire Oregon Amazon Eastern Oregon Data Centers →

    Kotek’s push against data centers unlikely to slow expansion in Eastern Oregon, local officials say

    Oregon Gov. Kotek announced support for a statewide moratorium on data centers and issued an executive order pausing developments on state owned land.

  496. News Wire Oregon Oakline at Mill Creek →

    Salem will host three town halls on data center policies

    Salem established a Data Center Task Force and scheduled three town halls to develop data center policies for city council approval.

  497. News Wire Pennsylvania

    Wyoming County Passes Data Center Regulations - The Rocket-Courier

    Wyoming County commissioners formally adopted regulations for data centre development in an amendment to the county's subdivision and land development ordinance.

  498. News Wire Pennsylvania

    Alpha Compute Secures $47 Million in Seller Financing for Planned 200MW Pennsylvania AI Data Center Campus - Yahoo Finance

    Alpha Compute secures 47 million dollars in seller financing for planned 200 MW Pennsylvania AI data center campus in Tioga County.

  499. News Wire Pennsylvania Aligned PIT-01 (Project Phoenix) →

    Aligned Data Centers and Shippingport Community Mark Revitalization of Legacy Energy Site with Groundbreaking of 2 GW Project Phoenix Campus

    Aligned Data Centers holds groundbreaking ceremony for Project Phoenix, a 2 GW data center campus in Shippingport, Pennsylvania, on September 10, 2026, with expected regional economic investment of $10 billion.

  500. News Wire Pennsylvania

    Polling Pennsylvania: Data Center Discourse - aei.org

    Pennsylvania poll shows data center support dropped from 34% to 22% in seven months, opposition surged from 42% to 57%, with Democrats opposing more than Republicans.

  501. News Wire Pennsylvania

    Potential data center development the topic of community event in Shippingport - WPXI

    Aligned Data Centers held a community meeting about plans to build a nearly 2 million square foot data center campus on the former Bruce Mansfield Power Plant site in Shippingport, Pennsylvania.

  502. News Wire Pennsylvania

    A massive data center breaks ground near former coal plant campus in Beaver County - Pittsburgh Post-Gazette

    Texas developer breaks ground on Project Phoenix, a 2 gigawatt data center near a defunct coal plant in Beaver County.

  503. News Wire Pennsylvania

    PUC to examine grid reliability, customer costs related to data center growth - wfmz.com

    Pennsylvania PUC ordered staff to develop grid reliability regulations and scheduled technical conference on cost allocation as data center load grows.

  504. News Wire Pennsylvania

    Alpha Compute Corp. Announces $47 Million Seller Financing Amendment for Pennsylvania Data Center Campus Project - quiverquant.com

    Alpha Compute amended financing for a 200 MW natural gas data center campus in Pennsylvania, reducing cash at closing to $8 million with $47 million seller financing.

  505. News Wire Pennsylvania

    Pennsylvania Democrat’s new data center ad - Punchbowl News

    Democrat Bob Harvie airs first general election TV ad calling for data center moratorium against Rep. Brian Fitzpatrick in Pennsylvania.

  506. News Wire Pennsylvania

    PUC Moves To Address A.I. Data Center Impacts On Emergency Load Control Procedures, Allocation Of Costs Associated With Large Loads; Technical Conference On Cost Responsibility To Be Held - PA Environment Digest Blog

    Pennsylvania Public Utility Commission votes 5-0 to update emergency load control procedures and examine cost allocation for data centers.

  507. News Wire Pennsylvania

    Crucial House Race Becomes Data Center Battle - HuffPost

    Pennsylvania Democratic candidate Bob Harvie calls for data center moratorium in congressional race, reversing prior support.

  508. News Wire Pennsylvania

    2 GW Project Phoenix Data Center Campus Breaks Ground in Pennsylvania - Construction Review

    Aligned Data Centers broke ground on Project Phoenix, a 2 GW three facility data center campus in Shippingport, Pennsylvania, with $10 billion regional investment and 3,000 construction jobs.

  509. News Wire Pennsylvania

    Democrat Bob Harvie’s First Campaign TV Ad Calls for Data Center Moratorium, Criticizes Congressman Brian Fitzpatrick for Being in Big Tech's Pocket - Bucks County Beacon

    Democratic candidate Bob Harvie calls for data center moratorium and criticizes Congressman Fitzpatrick over data center subsidies.

  510. News Wire South Carolina

    Federal Government Moves to Limit Public Input on Data Center Projects - capitalbnews.org

    Federal EPA proposes to eliminate public comment requirement for air pollution permits for data centers and power plants.

  511. DATA 2: Spartanburg data center not subject to public power plant rules, SC regulators rule - The Clinton Chronicle

    South Carolina Public Service Commission ruled data center generating its own power not subject to utility regulation; environmental groups contest decision.

  512. Spartanburg County Council, speakers clash at data center meeting - FOX Carolina News

    Spartanburg County Council held special meeting on data center moratorium vote; final vote on one year moratorium expected September 21.

  513. Residents storm out during data center debate in Spartanburg County - FOX Carolina News

    Residents walked out of a debate over a data center in Spartanburg County, South Carolina.

  514. News Wire Texas

    Bilateral Energy answers handful of Project Patriot questions

    Bilateral Energy, developer of Project Patriot data center in Granbury, disclosed power, water and noise details after months of limited public information.

  515. News Wire Texas

    Company launches data center’s $4B first phase near Harlingen - MyRGV.com

    Fluidstack launches $4 billion first phase of 1,100 acre hyperscale data center east of Harlingen, Texas, creating hundreds of permanent and 2,500 construction jobs.

  516. News Wire Texas

    Boling residents meet Amazon leaders over massive data center project - click2houston.com

    Amazon held a community meeting with Boling residents to address questions and concerns about a massive data center project in Wharton County, Texas.

  517. News Wire Texas

    Data centers are driving some conservative Texas voters away from the GOP - Houston Public Media

    Conservative Texas voters in Hood County oppose data center expansion and are shifting political allegiance away from Republican candidates who support development.

  518. News Wire Texas

    Behind the meter: Private power fuels AI data center growth - Fierce Network

    Industry analysts and power suppliers report behind the meter power solutions are expanding for data centers as grid wait times stretch to years nationwide.

  519. News Wire Texas

    Texas chose a ‘soft approach’ with data center survey. It was so soft it flopped. - San Antonio Current

    Texas data centers largely ignored mandatory water survey from state regulators; Governor Abbott criticized lack of transparency as compliance fell short.

  520. News Wire Texas

    Texas needs greater transparency on data centers’ water and air impacts

    The Environmental Defense Fund called on Texas regulators to require greater public disclosure of water consumption and air emissions from data center facilities.

  521. News Wire Texas

    Data Center Water Use in Texas Impossible to Quantify,Lawmakers Aren't Always Sure How to Reach The Operators - deceleration.news

    Texas regulators report low survey response from data centers on water usage; 81 facilities reported 1.3 billion gallons total water intake.

  522. News Wire Texas

    Texas Republicans Rolled Out the Welcome Mat for Data Centers. Their Voters Are Tearing It Up. - Gadget Review

    Rural Texas voters oppose data centers over noise pollution and property value losses, reshaping the 2026 gubernatorial race.

  523. News Wire Texas

    NUAI Stock Stumbles As Texas Data Center Claims Face Probe - timothysykes.com

    New Era Energy & Digital Inc. faces regulatory investigation into alleged overstated permitting progress on its flagship Texas data center project.

  524. News Wire Texas

    Data centers are driving some conservative Texas voters away from the GOP - KERA News

    Conservative Texas voters in Hood County say data center opposition is pushing them toward Democrats or away from voting as Governor Abbott faces criticism over data center incentives.

  525. News Wire Texas

    Key facts: AMZN 10 yr Qualcomm deal; $1.6B Texas plant; bonds premium - TradingView

    Amazon expands Texas data center hardware plant to $1.6 billion with Wiwynn, creating 1,000 advanced manufacturing jobs by 2027 toward 4,000 total.

  526. News Wire Texas

    Google Invests $15 Billion on Data Center Buildout in ‘Texas of Europe’ - The Daily Upside

    Google announces $15 billion AI data center investment in Finland over two years, including three new facilities powered partly by nuclear electricity.

  527. News Wire Texas

    Texas' 12 largest planned gas projects all aim to power data centers as buildout jumps 50% - yahoo.com

    Texas plans 12 new gas plants to power data centers as proposed gas generation grows 50 percent, raising concerns about emissions and energy supply constraints.

  528. News Wire Texas

    Tarrant County Commissioner Holds Town Hall on Data Center Concerns - thetexan.news

    Tarrant County Commissioner Matt Krause holds town hall on data center concerns, hearing resident complaints about a Westlake project and plans to raise issue with state legislators.

  529. News Wire Texas

    Fluidstack breaks ground on $4 billion data center project in Cameron County - KRGV

    Fluidstack broke ground near Rio Hondo in Cameron County, Texas, on a data center campus valued at 4 billion dollars and expected to create more than 2,500 construction jobs.

  530. News Wire Texas

    Fluidstack Begins $4 Billion AI Data Center Project in Cameron County - Texas Border Business

    Fluidstack begins $4 billion AI data center campus in Cameron County, Texas near Rio Hondo; first phase expected to create 2,500 construction jobs.

  531. News Wire Texas

    Tarrant commissioner: Data center debate ‘transcends partisan sides’

    Tarrant County Commissioner Matt Krause calls for regulatory guardrails on data centers after hosting a town hall, suggesting state and local regulatory frameworks.

  532. News Wire Utah

    ABC4 Utah. . Data center backlash in Mona, Lori Meers has been sentenced and more.

    ABC4 Utah reports on data center opposition in Mona, Utah.

  533. News Wire Utah

    Can you make water from natural gas? We’re about to find out - Deseret News

    Creekstone Energy announced patent pending Gigawater technology to convert natural gas to water at Delta Gigasite data center in Millard County, Utah.

  534. News Wire Virginia

    Representative Suhas Subramanyam introduces H.R. 10322: Data Center Fair Share Act - Quiver Quantitative

    Representative Suhas Subramanyam introduced H.R. 10322, the Data Center Fair Share Act, to require utilities to assign full infrastructure costs to large load customers of 100 megawatts or more, with states having two years to comply or risk losing federal highway funds.

  535. News Wire Virginia

    VA Rep. Suhas Subramanyam Unveils National Data Center Legislation - Patch

    U.S. Rep. Suhas Subramanyam proposed four federal bills to regulate data center siting, energy standards, and infrastructure impacts nationally.

  536. News Wire Virginia

    What to know about Amazon's data center proposal - Loudoun Times-Mirror

    Amazon submits site plan for four data center buildings on purchased George Washington University campus in Loudoun County; complex zoning and regulatory process begins.

  537. News Wire Virginia

    Vantage turns to institutional investors for data center financing as lenders face opposition - report - TradingView

    Vantage Data Centers seeks up to 2 billion dollars from institutional investors for data center build outs as lenders face political and community opposition.

  538. News Wire Virginia

    Citizens Continue to Oppose Data Centers - Patriot Publishing LLC

    Pulaski County, Virginia citizens and officials debate proposed data center; survey shows 95 percent opposition to development in county.

  539. News Wire Virginia

    Virginia needs a data center moratorium now | Guest column - Richmond Times-Dispatch

    Virginia guest column calls for statewide moratorium on data center contracts until grid reliability, energy, water, and air quality impacts are addressed.

  540. News Wire Virginia

    Virginia’s data center backlash spills into midterms and more state headlines - cbs19news.com

    Virginia data center opposition is becoming a political issue in midterm elections, with community backlash spilling into 2027 state races.

  541. News Wire Virginia

    Virginia is doing data centers backwards | Guest column - Richmond Times-Dispatch

    Virginia opinion piece argues counties should establish data center standards and community benefit terms before accepting developer proposals, citing Hanover rejection and Lancaster approval.

  542. News Wire Virginia

    Subramanyam introduces package of bills related to data centers - NBC4 Washington

    U.S. Rep. Suhas Subramanyam introduces package of bills to regulate data center energy and water use; his Virginia district has over 300 data centers with 200 more planned.

  543. News Wire Virginia

    Rep. Subramanyam announces national data center plan - Rappahannock News

    U.S. Rep. Suhas Subramanyam unveiled four bills to reform data center siting and require data centers to pay for grid upgrades and infrastructure.

  544. News Wire Washington

    What Quincy, Washington Can Teach America About Building AI Infrastructure Communities Actually Want - linkedin.com

    Quincy Washington data centers achieved 72 percent lower property taxes, 6 billion plus new tax base, and water system savings of 138 million gallons yearly.

  545. News Wire Wisconsin Vantage Port Washington Data Center →

    Port Washington residents look for answers from Vantage, Oracle and OpenAI on massive data center project - TMJ4 News

    Oracle, OpenAI and Vantage held public forum in Port Washington, Wisconsin on data center project; 1000 jobs promised by 2028 opening.

  546. News Wire Wisconsin

    Guest opinion: What Wisconsin’s Democratic primary reveals about data center politics - Wisconsin Watch

    Wisconsin Democratic primary revealed data center politics more nuanced than moratorium debate; Black voters showed more favorable view than other groups surveyed.

  547. News Wire Wisconsin

    Construction employment grows modestly with data center activity - dailyreporter.com

    Construction employment grew 22,000 jobs in August with specialty trade contractors up 8,000 due to data center megaproject activity.

  548. News Wire Wisconsin

    Alliant executive speaks on data centers at Uptown Social - The Sheboygan Press

    Becky Valcq, President of Alliant Energy's Wisconsin electric company, spoke at an educational session about data centers in Sheboygan.

  549. News Wire West Virginia NScale Mason County Data Center →

    Homeowner’s yard floods again near Nscale data center site - WSAZ

    A homeowner near NScale's Monarch Compute Campus data center in Mason County, West Virginia reports the second flooding of their property from site runoff since construction began.

  550. News Wire West Virginia

    Stakeholders statewide unite to form WV Data Center Accountability Project - The Real WV

    West Virginia stakeholders form Data Center Accountability Project opposing unchecked buildout, demanding local control, environmental protection, and community consent.

  551. News Wire West Virginia

    Communities from Putnam to Tucker unite over data center concerns - WCHS

    Multiple West Virginia communities formed Data Center Accountability Project to demand holistic assessment and local control over data center projects.

  552. News Wire Wyoming

    Natural gas leads race to fuel Wyoming’s spiking data center driven electrical demand - Powell Tribune

    Wyoming state officials report natural gas power projects are rising to meet data center electricity demand, with seven projects in planning totaling 8,700 MW.

  553. News Wire Wyoming

    America's reddest state chases billion dollar boom as others sour on massive emerging industry - Fox News

    Wyoming positions itself as alternative to other states imposing restrictions on data centers, citing advantages in land, energy and favorable regulatory environment for AI infrastructure.

  554. Natrona County residents split on a potential multi-million-dollar A.I. data center - Wyoming Public Media

    Natrona County commissioners heard residents debate Prometheus Hyperscale's $500 million, 940 acre AI data center on Falls Ranch between Casper and Glenrock.

  555. News Wire Wyoming

    A new study shows public opposition to data centers could change if people felt they were benefitting, too

    Yale researchers find public opposition to data centers could shift if developers offset community electricity costs through incentives.

  556. Project Filing Iowa Google Salix Data Center →

    Google Salix Data Center

    Death threats sidelined a planned city council meeting in Salix where local leaders were set to discuss a proposed Google data center. The record reads reported, reported September 10, 2026.

  557. Project Filing Iowa Google Salix Data Center →

    Google Salix Data Center

    Local leaders in Norwalk approved a development agreement for a $12 billion data center project. The record reads reported, reported September 10, 2026.

  558. Project Filing Idaho ValorC3 Boise Data Center →

    ValorC3 Boise Data Center

    ValorC3 Boise data center built in 2020 using hybrid cooling. The record reads reported, reported September 10, 2026.

  559. Project Filing Louisiana Meta Louisiana data center →

    Meta Louisiana data center

    Work continues on the Meta Richland Parish Data Center near Rayville as of August 3, 2026. The record reads running, reported September 10, 2026.

  560. Project Filing Louisiana Meta plus Moss Bluff →

    Meta plus Moss Bluff

    Azimuth Renewables signed option to purchase about 1,200 acres in Moss Bluff in April 2026. The record reads reported, reported September 10, 2026.

  561. Project Filing Louisiana Meta plus Moss Bluff →

    Meta plus Moss Bluff

    Azimuth Renewables has three years to purchase property with optional one year extension. The record reads reported, reported September 10, 2026.

  562. Project Filing Louisiana Meta plus Moss Bluff →

    Meta plus Moss Bluff

    Data center would occupy fraction of 1,168 acres in wooded rural portion of Moss Bluff. The record reads reported, reported September 10, 2026.

  563. Ypsilanti Township / University of Michigan & Los Alamos Data Center

    University of Michigan initially proposed 20 acre project before purchasing 124 additional acres. The record reads reported, reported September 10, 2026.

  564. Project Filing Michigan U-M / Los Alamos Data Center (Van Buren Township) →

    U-M / Los Alamos Data Center (Van Buren Township)

    The facility is proposed to be built on a 144 acre site. The record reads reported, reported September 10, 2026.

  565. Project Filing Michigan U-M / Los Alamos Data Center (Van Buren Township) →

    U-M / Los Alamos Data Center (Van Buren Township)

    The facility is proposed to be built along the Huron River. The record reads reported, reported September 10, 2026.

  566. Project Filing Michigan U-M / Los Alamos Data Center (Van Buren Township) →

    U-M / Los Alamos Data Center (Van Buren Township)

    A next town hall is scheduled for October 1. The record reads reported, reported September 10, 2026.

  567. Project Filing North Dakota Applied Digital Polaris Forge 2 (Harwood) →

    Applied Digital Polaris Forge 2 (Harwood)

    Harwood city council approved the Applied Digital data center and signed a three billion dollar deal within 21 days of initial announcement. The record reads reported, reported September 10, 2026.

  568. Project Filing New Hampshire Bow Data Center →

    Bow Data Center

    Eversource has been in communication with a developer interested in building a data center in Bow. The record reads reported, reported September 10, 2026.

  569. Project Filing New Hampshire Bow Data Center →

    Bow Data Center

    Data center would be located next to Merrimack Station power plant. The record reads reported, reported September 10, 2026.

  570. Project Filing Oregon Amazon Eastern Oregon Data Centers →

    Amazon Eastern Oregon Data Centers

    Amazon data center project is proceeding in the Boardman area with Oregon Department of Environmental Quality opening public comment period for air quality permit. The record reads reported, reported September 10, 2026.

  571. Project Filing South Carolina NorthMark Spartanburg County Data Center →

    NorthMark Spartanburg County Data Center

    Valara project became public in March 2025 when Spartanburg County began negotiating tax incentives for project creating 27 jobs. The record reads reported, reported September 10, 2026.

  572. Project Filing South Carolina NorthMark Spartanburg County Data Center →

    NorthMark Spartanburg County Data Center

    NorthMark Strategies converting Kohler kitchen and bath manufacturing plant into $2.8 billion computing center on 300 acres. The record reads reported, reported September 10, 2026.

  573. Project Filing Wyoming Prometheus Hyperscale Natrona County Data Center →

    Prometheus Hyperscale Natrona County Data Center

    Commissioners said a formal vote on the Prometheus project remains months away. The record reads waiting on permits, reported September 10, 2026.

  574. Project Filing Wyoming Prometheus Hyperscale Natrona County Data Center →

    Prometheus Hyperscale Natrona County Data Center

    Prometheus Hyperscale is proposing a $500 million AI data center on 940 acres south of I-25 on Falls Ranch property between Casper and Glenrock. The record reads waiting on permits, reported September 10, 2026.

  575. Project Filing Wyoming Fremont County Data Center →

    Fremont County Data Center

    A small data center taking shape in Lost Cabin. The record reads reported, reported September 10, 2026.

Bill data from LegiScan (opens in a new tab), licensed CC BY 4.0 (opens in a new tab). The record chooses the bills, writes each stage in its own words and cites the legislature's own page for every bill.

Each entry in the Daily Record is indexed to the date the action occurred or was officially reported, linking directly to the underlying government filing, council minutes, regulatory docket, or verified news report. Commercial bulk exports are governed under CC BY-NC 4.0 at Commercial Licensing & Bulk Data.

Researcher view · basis and source tier on every row · docket and Census GEOIDs · citation and export tools

Commercial and bulk data